Table of Contents

Program Version:EnergyPlus-Linux--- 8.0.0.---, YMD=2018.10.19 19:09

Tabular Output Report in Format: HTML

Building: OutPatient HealthCare

Environment: Rochester International Arpt MN USA TMY3 WMO#=726440

Simulation Timestamp: 2018-10-19 19:11:00


Table of Contents

Report: Annual Building Utility Performance Summary

For: Entire Facility

Timestamp: 2018-10-19 19:11:00

Values gathered over 8760.00 hours



Site and Source Energy

Total Energy [GJ] Energy Per Total Building Area [MJ/m2] Energy Per Conditioned Building Area [MJ/m2]
Total Site Energy 5771.34 1517.17 1517.17
Net Site Energy 5771.34 1517.17 1517.17
Total Source Energy 14912.95 3920.33 3920.33
Net Source Energy 14912.95 3920.33 3920.33


Site to Source Energy Conversion Factors

Site=>Source Conversion Factor
Electricity 3.167
Natural Gas 1.084
District Cooling 1.056
District Heating 3.613
Steam 0.300
Gasoline 1.050
Diesel 1.050
Coal 1.050
Fuel Oil #1 1.050
Fuel Oil #2 1.050
Propane 1.050
Other Fuel 1 1.000
Other Fuel 2 1.000


Building Area

Area [m2]
Total Building Area 3804.01
Net Conditioned Building Area 3804.01
Unconditioned Building Area 0.00


End Uses

Electricity [GJ] Natural Gas [GJ] Additional Fuel [GJ] District Cooling [GJ] District Heating [GJ] Water [m3]
Heating 467.66 1172.09 0.00 0.00 0.00 0.00
Cooling 530.41 0.00 0.00 0.00 0.00 0.00
Interior Lighting 541.36 0.00 0.00 0.00 0.00 0.00
Exterior Lighting 112.30 0.00 0.00 0.00 0.00 0.00
Interior Equipment 1833.75 188.37 0.00 0.00 0.00 0.00
Exterior Equipment 0.00 0.00 0.00 0.00 0.00 0.00
Fans 419.03 0.00 0.00 0.00 0.00 0.00
Pumps 4.91 0.00 0.00 0.00 0.00 0.00
Heat Rejection 0.00 0.00 0.00 0.00 0.00 0.00
Humidification 246.52 0.00 0.00 0.00 0.00 91.70
Heat Recovery 0.00 0.00 0.00 0.00 0.00 0.00
Water Systems 0.00 254.94 0.00 0.00 0.00 478.84
Refrigeration 0.00 0.00 0.00 0.00 0.00 0.00
Generators 0.00 0.00 0.00 0.00 0.00 0.00
             
Total End Uses 4155.94 1615.41 0.00 0.00 0.00 570.55
Note: Natural gas appears to be the principal heating source based on energy usage.

End Uses By Subcategory

Subcategory Electricity [GJ] Natural Gas [GJ] Additional Fuel [GJ] District Cooling [GJ] District Heating [GJ] Water [m3]
Heating Boiler 0.00 1172.09 0.00 0.00 0.00 0.00
  Boiler Parasitic 0.00 0.00 0.00 0.00 0.00 0.00
  Other 467.66 0.00 0.00 0.00 0.00 0.00
Cooling General 530.41 0.00 0.00 0.00 0.00 0.00
Interior Lighting General 541.36 0.00 0.00 0.00 0.00 0.00
Exterior Lighting General 112.30 0.00 0.00 0.00 0.00 0.00
Interior Equipment General 1833.75 188.37 0.00 0.00 0.00 0.00
Exterior Equipment General 0.00 0.00 0.00 0.00 0.00 0.00
Fans Fan Energy 378.17 0.00 0.00 0.00 0.00 0.00
  Zone Exhaust Fans 40.85 0.00 0.00 0.00 0.00 0.00
Pumps General 4.91 0.00 0.00 0.00 0.00 0.00
Heat Rejection General 0.00 0.00 0.00 0.00 0.00 0.00
Humidification General 246.52 0.00 0.00 0.00 0.00 91.70
Heat Recovery General 0.00 0.00 0.00 0.00 0.00 0.00
Water Systems Water Heater 0.00 254.94 0.00 0.00 0.00 0.00
  General 0.00 0.00 0.00 0.00 0.00 478.84
Refrigeration General 0.00 0.00 0.00 0.00 0.00 0.00
Generators General 0.00 0.00 0.00 0.00 0.00 0.00


Normalized Metrics

Utility Use Per Conditioned Floor Area

Electricity Intensity [MJ/m2] Natural Gas Intensity [MJ/m2] Additional Fuel Intensity [MJ/m2] District Cooling Intensity [MJ/m2] District Heating Intensity [MJ/m2] Water Intensity [m3/m2]
Lighting 171.84 0.00 0.00 0.00 0.00 0.00
HVAC 438.62 375.14 0.00 0.00 0.00 0.15
Other 482.06 49.52 0.00 0.00 0.00 0.00
Total 1092.51 424.66 0.00 0.00 0.00 0.15


Utility Use Per Total Floor Area

Electricity Intensity [MJ/m2] Natural Gas Intensity [MJ/m2] Additional Fuel Intensity [MJ/m2] District Cooling Intensity [MJ/m2] District Heating Intensity [MJ/m2] Water Intensity [m3/m2]
Lighting 171.84 0.00 0.00 0.00 0.00 0.00
HVAC 438.62 375.14 0.00 0.00 0.00 0.15
Other 482.06 49.52 0.00 0.00 0.00 0.00
Total 1092.51 424.66 0.00 0.00 0.00 0.15


Electric Loads Satisfied

Electricity [GJ] Percent Electricity [%]
Fuel-Fired Power Generation 0.00 0.00
High Temperature Geothermal* 0.00 0.00
Photovoltaic Power 0.00 0.00
Wind Power 0.00 0.00
Net Decrease in On-Site Storage 0.00 0.00
Total On-Site Electric Sources 0.00 0.00
     
Electricity Coming From Utility 4155.94 100.00
Surplus Electricity Going To Utility 0.00 0.00
Net Electricity From Utility 4155.94 100.00
     
Total On-Site and Utility Electric Sources 4155.94 100.00
Total Electricity End Uses 4155.94 100.00


On-Site Thermal Sources

Heat [GJ] Percent Heat [%]
Water-Side Heat Recovery 0.00  
Air to Air Heat Recovery for Cooling 0.00  
Air to Air Heat Recovery for Heating 0.00  
High-Temperature Geothermal* 0.00  
Solar Water Thermal 0.00  
Solar Air Thermal 0.00  
Total On-Site Thermal Sources 0.00  


Water Source Summary

Water [m3] Percent Water [%]
Rainwater Collection 0.00 0.00
Condensate Collection 0.00 0.00
Groundwater Well 0.00 0.00
Total On Site Water Sources 0.00 0.00
- - -
Initial Storage 0.00 0.00
Final Storage 0.00 0.00
Change in Storage 0.00 0.00
- - -
Water Supplied by Utility 570.55 100.00
- - -
Total On Site, Change in Storage, and Utility Water Sources 570.55 100.00
Total Water End Uses 570.55 100.00


Comfort and Setpoint Not Met Summary

Degrees [deltaC]
Tolerance for Zone Heating Setpoint Not Met Time 0.20
Tolerance for Zone Cooling Setpoint Not Met Time 0.20


Facility [Hours]
Time Setpoint Not Met During Occupied Heating 93.50
Time Setpoint Not Met During Occupied Cooling 2144.67
Time Not Comfortable Based on Simple ASHRAE 55-2004 7485.50


Note 1: An asterisk (*) indicates that the feature is not yet implemented.


Table of Contents

Top
Annual Building Utility Performance Summary
Input Verification and Results Summary
Component Sizing Summary
Climatic Data Summary
Envelope Summary
Equipment Summary
HVAC Sizing Summary
System Summary

MONTHLY INDOOR TEMP

| FLOOR 1 ANESTHESIA | FLOOR 1 BIO HAZ | FLOOR 1 CAFE | FLOOR 1 CLEAN | FLOOR 1 CLEAN WORK | FLOOR 1 DICTATION | FLOOR 1 DRESSING ROOM | FLOOR 1 ELECTRICAL ROOM | FLOOR 1 ELEVATOR PUMP ROOM | FLOOR 1 HUMID | FLOOR 1 IT HALL | FLOOR 1 IT ROOM | FLOOR 1 LOBBY | FLOOR 1 LOBBY HALL | FLOOR 1 LOBBY TOILET | FLOOR 1 LOCKER ROOM | FLOOR 1 LOCKER ROOM HALL | FLOOR 1 LOUNGE | FLOOR 1 MED GAS | FLOOR 1 MRI CONTROL ROOM | FLOOR 1 MRI HALL | FLOOR 1 MRI ROOM | FLOOR 1 MRI TOILET | FLOOR 1 NOURISHMENT | FLOOR 1 NURSE HALL | FLOOR 1 NURSE JANITOR | FLOOR 1 NURSE STATION | FLOOR 1 NURSE TOILET | FLOOR 1 OFFICE | FLOOR 1 OPERATING ROOM 1 | FLOOR 1 OPERATING ROOM 2 | FLOOR 1 OPERATING ROOM 3 | FLOOR 1 PACU | FLOOR 1 PRE-OP HALL | FLOOR 1 PRE-OP ROOM 1 | FLOOR 1 PRE-OP ROOM 2 | FLOOR 1 PRE-OP TOILET | FLOOR 1 PROCEDURE ROOM | FLOOR 1 RECEPTION | FLOOR 1 RECEPTION HALL | FLOOR 1 RECOVERY ROOM | FLOOR 1 SCHEDULING | FLOOR 1 SCRUB | FLOOR 1 SOIL | FLOOR 1 SOIL HOLD | FLOOR 1 SOIL WORK | FLOOR 1 STEP DOWN | FLOOR 1 STERILE HALL | FLOOR 1 STERILE STORAGE | FLOOR 1 STORAGE | FLOOR 1 SUB-STERILE | FLOOR 1 UTILITY HALL | FLOOR 1 UTILITY JANITOR | FLOOR 1 UTILITY ROOM | FLOOR 1 VESTIBULE | FLOOR 2 CONFERENCE | FLOOR 2 CONFERENCE TOILET | FLOOR 2 DICTATION | FLOOR 2 EXAM 1 | FLOOR 2 EXAM 2 | FLOOR 2 EXAM 3 | FLOOR 2 EXAM 4 | FLOOR 2 EXAM 5 | FLOOR 2 EXAM 6 | FLOOR 2 EXAM 7 | FLOOR 2 EXAM 8 | FLOOR 2 EXAM 9 | FLOOR 2 EXAM HALL 1 | FLOOR 2 EXAM HALL 2 | FLOOR 2 EXAM HALL 3 | FLOOR 2 EXAM HALL 4 | FLOOR 2 EXAM HALL 5 | FLOOR 2 EXAM HALL 6 | FLOOR 2 JANITOR | FLOOR 2 LOUNGE | FLOOR 2 NURSE STATION 1 | FLOOR 2 NURSE STATION 2 | FLOOR 2 OFFICE | FLOOR 2 OFFICE HALL | FLOOR 2 RECEPTION | FLOOR 2 RECEPTION HALL | FLOOR 2 RECEPTION TOILET | FLOOR 2 SCHEDULING 1 | FLOOR 2 SCHEDULING 2 | FLOOR 2 STORAGE 1 | FLOOR 2 STORAGE 2 | FLOOR 2 STORAGE 3 | FLOOR 2 UTILITY | FLOOR 2 WORK | FLOOR 2 WORK HALL | FLOOR 2 WORK TOILET | FLOOR 2 X-RAY | FLOOR 3 DRESSING ROOM | FLOOR 3 ELEVATOR HALL | FLOOR 3 HUMID | FLOOR 3 JANITOR | FLOOR 3 LOCKER | FLOOR 3 LOUNGE | FLOOR 3 LOUNGE TOILET | FLOOR 3 MECHANICAL | FLOOR 3 MECHANICAL HALL | FLOOR 3 OFFICE | FLOOR 3 OFFICE HALL | FLOOR 3 OFFICE TOILET | FLOOR 3 PHYSICAL THERAPY 1 | FLOOR 3 PHYSICAL THERAPY 2 | FLOOR 3 PHYSICAL THERAPY TOILET | FLOOR 3 STORAGE 1 | FLOOR 3 STORAGE 2 | FLOOR 3 TREATMENT | FLOOR 3 UNDEVELOPED 1 | FLOOR 3 UNDEVELOPED 2 | FLOOR 3 UTILITY | FLOOR 3 WORK | NE STAIR | NW ELEVATOR | NW STAIR | SW STAIR |

OVERALL HVAC AIR SYSTEM LOADS

| AHU-1 | AHU-2 |

OVERALL HVAC SYSTEM ENERGY

| Meter |

COMPONENTS OF PEAK ELECTRICAL DEMAND

| Meter |

ENERGY CONSUMPTION - ELECTRICITY & NATURAL GAS

| Meter |

BUILDING ENERGY PERFORMANCE - ELECTRICITY

| Meter |

BUILDING ENERGY PERFORMANCE - NATURAL GAS

| Meter |

PEAK ENERGY END-USE - ELECTRICITY

| Meter |

PEAK ELECTRICAL DEMAND

| Meter |

PEAK GAS DEMAND

| Meter |

Table of Contents

Report: Input Verification and Results Summary

For: Entire Facility

Timestamp: 2018-10-19 19:11:00

General

Value
Program Version and Build EnergyPlus-Linux--- 8.0.0.---, YMD=2018.10.19 19:09
RunPeriod Rochester International Arpt MN USA TMY3 WMO#=726440
Weather File Rochester International Arpt MN USA TMY3 WMO#=726440
Latitude [deg] 43.90
Longitude [deg] -92.5
Elevation [m] 398.00
Time Zone -6.0
North Axis Angle [deg] 0.00
Rotation for Appendix G [deg] 0.00
Hours Simulated [hrs] 8760.00


ENVELOPE

Window-Wall Ratio

Total North (315 to 45 deg) East (45 to 135 deg) South (135 to 225 deg) West (225 to 315 deg)
Gross Wall Area [m2] 1553.34 473.81 302.86 473.81 302.86
Window Opening Area [m2] 308.29 97.22 57.97 114.08 39.02
Window-Wall Ratio [%] 19.85 20.52 19.14 24.08 12.88


Conditioned Window-Wall Ratio

Total North (315 to 45 deg) East (45 to 135 deg) South (135 to 225 deg) West (225 to 315 deg)
Gross Wall Area [m2] 1553.34 473.81 302.86 473.81 302.86
Window Opening Area [m2] 308.29 97.22 57.97 114.08 39.02
Window-Wall Ratio [%] 19.85 20.52 19.14 24.08 12.88


Skylight-Roof Ratio

Total
Gross Roof Area [m2] 1373.29
Skylight Area [m2] 0.00
Skylight-Roof Ratio [%] 0.00


PERFORMANCE

Zone Summary

Area [m2] Conditioned (Y/N) Part of Total Floor Area (Y/N) Volume [m3] Multipliers Gross Wall Area [m2] Window Glass Area [m2] Lighting [W/m2] People [m2 per person] Plug and Process [W/m2]
FLOOR 1 ANESTHESIA 10.03 Yes Yes 30.58 1.00 8.36 2.23 17.8681 4.64 21.5300
FLOOR 1 BIO HAZ 5.20 Yes Yes 15.86 1.00 0.00 0.00 6.7813   1.0800
FLOOR 1 CAFE 39.02 Yes Yes 118.93 1.00 18.58 8.92 6.9965 0.93 10.7600
FLOOR 1 CLEAN 11.71 Yes Yes 35.68 1.00 0.00 0.00 17.8681 4.64 21.5300
FLOOR 1 CLEAN WORK 15.33 Yes Yes 46.72 1.00 0.00 0.00 17.8681 4.64 21.5300
FLOOR 1 DICTATION 11.71 Yes Yes 35.68 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 1 DRESSING ROOM 4.18 Yes Yes 12.74 1.00 8.36 2.32 11.9479 18.58 11.8400
FLOOR 1 ELECTRICAL ROOM 9.10 Yes Yes 27.75 1.00 6.50 0.00 17.8681   53.8200
FLOOR 1 ELEVATOR PUMP ROOM 8.45 Yes Yes 25.77 1.00 18.58 0.00 17.8681   5734.7436
FLOOR 1 HUMID 5.02 Yes Yes 15.29 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 1 IT HALL 13.01 Yes Yes 39.64 1.00 0.00 0.00 8.5250   4.3100
FLOOR 1 IT ROOM 10.41 Yes Yes 31.71 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 1 LOBBY 57.79 Yes Yes 176.13 1.00 20.44 8.92 9.6875 9.29 11.8400
FLOOR 1 LOBBY HALL 22.30 Yes Yes 67.96 1.00 0.00 0.00 8.5250   4.3100
FLOOR 1 LOBBY TOILET 5.02 Yes Yes 15.29 1.00 5.57 0.00 10.5486   4.3100
FLOOR 1 LOCKER ROOM 61.32 Yes Yes 186.89 1.00 20.44 5.57 11.5174 6.19 32.2900
FLOOR 1 LOCKER ROOM HALL 46.08 Yes Yes 140.45 1.00 0.00 0.00 8.5250   4.3100
FLOOR 1 LOUNGE 33.45 Yes Yes 101.94 1.00 0.00 0.00 11.5174 6.19 32.2900
FLOOR 1 MED GAS 5.20 Yes Yes 15.86 1.00 13.94 0.00 6.7813   1.0800
FLOOR 1 MRI CONTROL ROOM 15.61 Yes Yes 47.57 1.00 4.65 0.00 14.2084 4.64 107.6400
FLOOR 1 MRI HALL 13.66 Yes Yes 41.63 1.00 0.00 0.00 8.5250   4.3100
FLOOR 1 MRI ROOM 40.88 Yes Yes 124.59 1.00 0.00 0.00 14.2084 4.64 107.6400
FLOOR 1 MRI TOILET 5.02 Yes Yes 15.29 1.00 5.57 0.00 10.5486   4.3100
FLOOR 1 NOURISHMENT 16.91 Yes Yes 51.54 1.00 0.00 0.00 9.3646 4.64 21.5300
FLOOR 1 NURSE HALL 46.08 Yes Yes 140.45 1.00 0.00 0.00 8.5250   4.3100
FLOOR 1 NURSE JANITOR 5.02 Yes Yes 15.29 1.00 0.00 0.00 6.7813   1.0800
FLOOR 1 NURSE STATION 24.25 Yes Yes 73.91 1.00 0.00 0.00 9.3646 4.64 21.5300
FLOOR 1 NURSE TOILET 5.02 Yes Yes 15.29 1.00 0.00 0.00 10.5486   4.3100
FLOOR 1 OFFICE 44.87 Yes Yes 136.77 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 1 OPERATING ROOM 1 42.74 Yes Yes 130.26 1.00 39.95 8.92 20.3438 4.64 118.3600
FLOOR 1 OPERATING ROOM 2 44.59 Yes Yes 135.92 1.00 22.30 6.69 20.3438 4.64 118.3600
FLOOR 1 OPERATING ROOM 3 44.22 Yes Yes 134.79 1.00 0.00 0.00 20.3438 4.64 118.3600
FLOOR 1 PACU 10.03 Yes Yes 30.58 1.00 0.00 0.00 12.3785 4.64 32.2900
FLOOR 1 PRE-OP HALL 49.05 Yes Yes 149.51 1.00 0.00 0.00 8.5250   4.3100
FLOOR 1 PRE-OP ROOM 1 17.56 Yes Yes 53.52 1.00 3.72 0.00 6.6736 9.29 21.5300
FLOOR 1 PRE-OP ROOM 2 31.40 Yes Yes 95.71 1.00 0.00 0.00 6.6736 9.29 21.5300
FLOOR 1 PRE-OP TOILET 5.02 Yes Yes 15.29 1.00 5.57 0.00 10.5486   4.3100
FLOOR 1 PROCEDURE ROOM 26.48 Yes Yes 80.70 1.00 17.65 5.57 24.3264 4.64 32.2900
FLOOR 1 RECEPTION 47.29 Yes Yes 144.13 1.00 12.08 3.34 9.6875 3.10 11.8400
FLOOR 1 RECEPTION HALL 11.89 Yes Yes 36.25 1.00 0.00 0.00 8.5250   4.3100
FLOOR 1 RECOVERY ROOM 50.17 Yes Yes 152.91 1.00 41.81 8.92 12.3785 4.64 32.2900
FLOOR 1 SCHEDULING 11.06 Yes Yes 33.70 1.00 6.50 0.74 11.9479 18.58 11.8400
FLOOR 1 SCRUB 7.80 Yes Yes 23.79 1.00 0.00 0.00 8.5250   4.3100
FLOOR 1 SOIL 11.71 Yes Yes 35.68 1.00 0.00 0.00 17.8681 4.64 21.5300
FLOOR 1 SOIL HOLD 5.20 Yes Yes 15.86 1.00 0.00 0.00 17.8681 4.64 21.5300
FLOOR 1 SOIL WORK 16.72 Yes Yes 50.97 1.00 0.00 0.00 17.8681 4.64 21.5300
FLOOR 1 STEP DOWN 27.87 Yes Yes 84.95 1.00 34.37 6.69 12.3785 4.64 32.2900
FLOOR 1 STERILE HALL 57.23 Yes Yes 174.43 1.00 7.43 2.23 8.5250   4.3100
FLOOR 1 STERILE STORAGE 36.79 Yes Yes 112.13 1.00 0.00 0.00 6.7813   1.0800
FLOOR 1 STORAGE 85.47 Yes Yes 260.51 1.00 58.53 8.36 6.7813   1.0800
FLOOR 1 SUB-STERILE 18.21 Yes Yes 55.50 1.00 13.01 2.97 8.5250   4.3100
FLOOR 1 UTILITY HALL 23.78 Yes Yes 72.49 1.00 14.86 0.00 8.5250   4.3100
FLOOR 1 UTILITY JANITOR 3.90 Yes Yes 11.89 1.00 0.00 0.00 6.7813   1.0800
FLOOR 1 UTILITY ROOM 33.45 Yes Yes 101.94 1.00 16.72 2.23 6.7813   1.0800
FLOOR 1 VESTIBULE 6.69 Yes Yes 20.39 1.00 7.43 0.00 8.5250   4.3100
FLOOR 2 CONFERENCE 31.22 Yes Yes 95.14 1.00 37.16 8.92 13.2396 1.86 10.7600
FLOOR 2 CONFERENCE TOILET 5.95 Yes Yes 18.12 1.00 0.00 0.00 10.5486   4.3100
FLOOR 2 DICTATION 6.50 Yes Yes 19.82 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 2 EXAM 1 33.45 Yes Yes 101.94 1.00 39.02 8.92 17.8681 4.64 11.8400
FLOOR 2 EXAM 2 50.17 Yes Yes 152.91 1.00 16.72 3.72 17.8681 4.64 11.8400
FLOOR 2 EXAM 3 66.89 Yes Yes 203.88 1.00 22.30 5.95 17.8681 4.64 11.8400
FLOOR 2 EXAM 4 7.80 Yes Yes 23.79 1.00 6.50 2.23 17.8681 4.64 11.8400
FLOOR 2 EXAM 5 32.52 Yes Yes 99.11 1.00 23.23 5.95 17.8681 4.64 11.8400
FLOOR 2 EXAM 6 20.90 Yes Yes 63.71 1.00 13.94 4.18 17.8681 4.64 11.8400
FLOOR 2 EXAM 7 73.58 Yes Yes 224.27 1.00 22.30 5.57 17.8681 4.64 11.8400
FLOOR 2 EXAM 8 25.08 Yes Yes 76.46 1.00 16.72 5.57 17.8681 4.64 11.8400
FLOOR 2 EXAM 9 36.79 Yes Yes 112.13 1.00 11.15 2.79 17.8681 4.64 11.8400
FLOOR 2 EXAM HALL 1 16.72 Yes Yes 50.97 1.00 5.57 0.00 8.5250   4.3100
FLOOR 2 EXAM HALL 2 16.72 Yes Yes 50.97 1.00 5.57 0.00 8.5250   4.3100
FLOOR 2 EXAM HALL 3 16.72 Yes Yes 50.97 1.00 5.57 0.00 8.5250   4.3100
FLOOR 2 EXAM HALL 4 18.39 Yes Yes 56.07 1.00 5.57 0.00 8.5250   4.3100
FLOOR 2 EXAM HALL 5 18.39 Yes Yes 56.07 1.00 5.57 0.00 8.5250   4.3100
FLOOR 2 EXAM HALL 6 18.39 Yes Yes 56.07 1.00 5.57 0.00 8.5250   4.3100
FLOOR 2 JANITOR 5.85 Yes Yes 17.84 1.00 14.86 0.00 6.7813   1.0800
FLOOR 2 LOUNGE 7.43 Yes Yes 22.65 1.00 0.00 0.00 11.5174 6.19 32.2900
FLOOR 2 NURSE STATION 1 13.94 Yes Yes 42.48 1.00 0.00 0.00 9.3646 4.64 21.5300
FLOOR 2 NURSE STATION 2 16.72 Yes Yes 50.97 1.00 0.00 0.00 9.3646 4.64 21.5300
FLOOR 2 OFFICE 52.03 Yes Yes 158.57 1.00 37.16 8.92 11.9479 18.58 11.8400
FLOOR 2 OFFICE HALL 41.25 Yes Yes 125.73 1.00 0.00 0.00 8.5250   4.3100
FLOOR 2 RECEPTION 91.42 Yes Yes 278.64 1.00 45.52 16.72 9.6875 3.10 11.8400
FLOOR 2 RECEPTION HALL 52.40 Yes Yes 159.71 1.00 6.50 0.00 8.5250   4.3100
FLOOR 2 RECEPTION TOILET 11.71 Yes Yes 35.68 1.00 0.00 0.00 10.5486   4.3100
FLOOR 2 SCHEDULING 1 30.10 Yes Yes 91.75 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 2 SCHEDULING 2 31.77 Yes Yes 96.84 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 2 STORAGE 1 5.20 Yes Yes 15.86 1.00 0.00 0.00 6.7813   1.0800
FLOOR 2 STORAGE 2 11.15 Yes Yes 33.98 1.00 0.00 0.00 6.7813   1.0800
FLOOR 2 STORAGE 3 13.38 Yes Yes 40.78 1.00 0.00 0.00 6.7813   1.0800
FLOOR 2 UTILITY 11.71 Yes Yes 35.68 1.00 8.36 2.23 6.7813   1.0800
FLOOR 2 WORK 157.01 Yes Yes 478.55 1.00 24.15 5.57 11.9479 18.58 9.7803
FLOOR 2 WORK HALL 77.48 Yes Yes 236.16 1.00 5.57 0.00 8.5250   4.3100
FLOOR 2 WORK TOILET 5.02 Yes Yes 15.29 1.00 5.57 0.00 10.5486   4.3100
FLOOR 2 X-RAY 83.61 Yes Yes 254.85 1.00 0.00 0.00 14.2084 4.64 107.6400
FLOOR 3 DRESSING ROOM 3.90 Yes Yes 11.89 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 3 ELEVATOR HALL 34.37 Yes Yes 104.77 1.00 3.72 0.00 8.5250   4.3100
FLOOR 3 HUMID 10.03 Yes Yes 30.58 1.00 0.00 0.00 11.9479 18.58 11.8400
FLOOR 3 JANITOR 5.85 Yes Yes 17.84 1.00 14.86 0.00 6.7813   1.0800
FLOOR 3 LOCKER 11.15 Yes Yes 33.98 1.00 0.00 0.00 11.5174 6.19 32.2900
FLOOR 3 LOUNGE 70.51 Yes Yes 214.92 1.00 21.37 5.57 11.5174 6.19 32.2900
FLOOR 3 LOUNGE TOILET 17.84 Yes Yes 54.37 1.00 11.15 4.18 10.5486   4.3100
FLOOR 3 MECHANICAL 32.52 Yes Yes 99.11 1.00 23.23 5.95 17.8681   53.8200
FLOOR 3 MECHANICAL HALL 27.87 Yes Yes 84.95 1.00 0.00 0.00 8.5250   4.3100
FLOOR 3 OFFICE 282.05 Yes Yes 859.70 1.00 68.75 19.51 11.9479 18.58 11.8400
FLOOR 3 OFFICE HALL 77.48 Yes Yes 236.16 1.00 5.57 0.00 8.5250   4.3100
FLOOR 3 OFFICE TOILET 5.02 Yes Yes 15.29 1.00 5.57 0.00 10.5486   4.3100
FLOOR 3 PHYSICAL THERAPY 1 120.77 Yes Yes 368.12 1.00 78.97 28.99 9.7952 4.64 16.1500
FLOOR 3 PHYSICAL THERAPY 2 55.00 Yes Yes 167.64 1.00 0.00 0.00 9.7952 4.64 16.1500
FLOOR 3 PHYSICAL THERAPY TOILET 7.80 Yes Yes 23.79 1.00 0.00 0.00 10.5486   4.3100
FLOOR 3 STORAGE 1 10.03 Yes Yes 30.58 1.00 0.00 0.00 6.7813   1.0800
FLOOR 3 STORAGE 2 7.80 Yes Yes 23.79 1.00 0.00 0.00 6.7813   1.0800
FLOOR 3 TREATMENT 44.22 Yes Yes 134.79 1.00 0.00 0.00 17.8681 4.64 11.8400
FLOOR 3 UNDEVELOPED 1 210.70 Yes Yes 642.23 1.00 66.89 25.64 6.7813   11.8400
FLOOR 3 UNDEVELOPED 2 107.02 Yes Yes 326.21 1.00 52.03 13.38 6.7813   11.8400
FLOOR 3 UTILITY 20.07 Yes Yes 61.16 1.00 0.00 0.00 6.7813   1.0800
FLOOR 3 WORK 53.33 Yes Yes 162.54 1.00 38.09 8.92 11.9479 18.58 11.8400
NE STAIR 15.61 Yes Yes 142.72 1.00 97.55 12.02 8.5250   4.3100
NW ELEVATOR 13.01 Yes Yes 118.93 1.00 75.25 0.00 8.5250   4.3100
NW STAIR 17.84 Yes Yes 163.10 1.00 111.48 11.15 8.5250   4.3100
SW STAIR 8.92 Yes Yes 81.55 1.00 55.74 1.11 8.5250   4.3100
Total 3804.01     11932.15   1553.34 308.29 11.2925 9.08 31.9597
Conditioned Total 3804.01     11932.15   1553.34 308.29 11.2925 9.08 31.9597
Unconditioned Total 0.00     0.00   0.00 0.00      
Not Part of Total 0.00     0.00   0.00 0.00      



Table of Contents

Report: Climatic Data Summary

For: Entire Facility

Timestamp: 2018-10-19 19:11:00

SizingPeriod:DesignDay

Maximum Dry Bulb [C] Daily Temperature Range [deltaC] Humidity Value Humidity Type Wind Speed [m/s] Wind Direction
ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB -26.20 0.00 -26.20 Wetbulb [C] 5.70 310.00
ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 31.20 10.60 23.10 Wetbulb [C] 6.70 200.00


Weather Statistics File

Value
None  



Table of Contents

Report: Envelope Summary

For: Entire Facility

Timestamp: 2018-10-19 19:11:00

Opaque Exterior

Construction Reflectance U-Factor with Film [W/m2-K] U-Factor no Film [W/m2-K] Gross Area [m2] Azimuth [deg] Tilt [deg] Cardinal Direction
481E71 NONRES_EXT_WALL 0.30 0.363 0.384 8.36 180.00 90.00 S
FLOOR 1 ANESTHESIA SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 10.03 0.00 180.00  
FLOOR 1 BIO HAZ SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.20 0.00 180.00  
5F762C NONRES_EXT_WALL 0.30 0.363 0.384 18.58 180.00 90.00 S
FLOOR 1 CAFE SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 39.02 90.00 180.00  
FLOOR 1 CLEAN SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 11.71 90.00 180.00  
FLOOR 1 CLEAN WORK SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 15.33 180.00 180.00  
FLOOR 1 DICTATION SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 11.71 0.00 180.00  
84FB73 NONRES_EXT_WALL 0.30 0.363 0.384 8.36 0.00 90.00 N
FLOOR 1 DRESSING ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 4.18 0.00 180.00  
7F5C82 NONRES_EXT_WALL 0.30 0.363 0.384 6.50 90.00 90.00 E
FLOOR 1 ELECTRICAL ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 9.10 0.00 180.00  
C732B0 NONRES_EXT_WALL 0.30 0.363 0.384 12.08 0.00 90.00 N
E02487 NONRES_EXT_WALL 0.30 0.363 0.384 6.50 270.00 90.00 W
FLOOR 1 ELEVATOR PUMP ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 8.45 180.00 180.00  
FLOOR 1 HUMID SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.02 0.00 180.00  
FLOOR 1 IT HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 13.01 180.00 180.00  
FLOOR 1 IT ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 10.41 90.00 180.00  
FE5A3C NONRES_EXT_WALL 0.30 0.363 0.384 20.44 270.00 90.00 W
FLOOR 1 LOBBY SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 57.79 90.00 180.00  
FLOOR 1 LOBBY HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 22.30 0.00 180.00  
9D87EC NONRES_EXT_WALL 0.30 0.363 0.384 5.57 270.00 90.00 W
FLOOR 1 LOBBY TOILET SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.02 0.00 180.00  
F629C1 NONRES_EXT_WALL 0.30 0.363 0.384 20.44 0.00 90.00 N
FLOOR 1 LOCKER ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 61.32 270.00 180.00  
FLOOR 1 LOCKER ROOM HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 46.08 180.00 180.00  
FLOOR 1 LOUNGE SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 33.45 180.00 180.00  
E85BB5 NONRES_EXT_WALL 0.30 0.363 0.384 7.43 0.00 90.00 N
577FC1 NONRES_EXT_WALL 0.30 0.363 0.384 6.50 90.00 90.00 E
FLOOR 1 MED GAS SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.20 180.00 180.00  
FLOOR 1 MED GAS ROOF NONRES_ROOF 0.30 0.269 0.283 5.20 180.00 0.00  
C114C1 NONRES_EXT_WALL 0.30 0.363 0.384 4.65 0.00 90.00 N
FLOOR 1 MRI CONTROL ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 15.61 180.00 180.00  
FLOOR 1 MRI HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 13.66 180.00 180.00  
FLOOR 1 MRI ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 40.88 90.00 180.00  
ADB8D0 NONRES_EXT_WALL 0.30 0.363 0.384 5.57 0.00 90.00 N
FLOOR 1 MRI TOILET SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.02 90.00 180.00  
FLOOR 1 NOURISHMENT SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 16.91 270.00 180.00  
FLOOR 1 NURSE HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 46.08 270.00 180.00  
FLOOR 1 NURSE JANITOR SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.02 180.00 180.00  
FLOOR 1 NURSE STATION SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 24.25 180.00 180.00  
FLOOR 1 NURSE TOILET SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.02 180.00 180.00  
FLOOR 1 OFFICE SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 44.87 0.00 180.00  
879583 NONRES_EXT_WALL 0.30 0.363 0.384 18.58 180.00 90.00 S
E326E4 NONRES_EXT_WALL 0.30 0.363 0.384 21.37 90.00 90.00 E
FLOOR 1 OPERATING ROOM 1 SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 42.74 0.00 180.00  
1D96D7 NONRES_EXT_WALL 0.30 0.363 0.384 22.30 90.00 90.00 E
FLOOR 1 OPERATING ROOM 2 SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 44.59 0.00 180.00  
FLOOR 1 OPERATING ROOM 3 SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 44.22 0.00 180.00  
FLOOR 1 PACU SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 10.03 180.00 180.00  
FLOOR 1 PRE-OP HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 49.05 180.00 180.00  
84418A NONRES_EXT_WALL 0.30 0.363 0.384 3.72 270.00 90.00 W
FLOOR 1 PRE-OP ROOM 1 SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 17.56 90.00 180.00  
FLOOR 1 PRE-OP ROOM 2 SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 31.40 0.00 180.00  
1535AC NONRES_EXT_WALL 0.30 0.363 0.384 5.57 270.00 90.00 W
FLOOR 1 PRE-OP TOILET SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.02 270.00 180.00  
6D2616 NONRES_EXT_WALL 0.30 0.363 0.384 17.65 0.00 90.00 N
FLOOR 1 PROCEDURE ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 26.48 270.00 180.00  
A5A6A3 NONRES_EXT_WALL 0.30 0.363 0.384 12.08 180.00 90.00 S
FLOOR 1 RECEPTION SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 47.29 270.00 180.00  
FLOOR 1 RECEPTION HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 11.89 0.00 180.00  
28B002 NONRES_EXT_WALL 0.30 0.363 0.384 41.81 180.00 90.00 S
FLOOR 1 RECOVERY ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 50.17 90.00 180.00  
EA6DC8 NONRES_EXT_WALL 0.30 0.363 0.384 6.50 180.00 90.00 S
FLOOR 1 SCHEDULING SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 11.06 90.00 180.00  
FLOOR 1 SCRUB SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 7.80 90.00 180.00  
FLOOR 1 SOIL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 11.71 90.00 180.00  
FLOOR 1 SOIL HOLD SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 5.20 0.00 180.00  
FLOOR 1 SOIL WORK SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 16.72 0.00 180.00  
B40F89 NONRES_EXT_WALL 0.30 0.363 0.384 11.15 270.00 90.00 W
997723 NONRES_EXT_WALL 0.30 0.363 0.384 23.23 180.00 90.00 S
FLOOR 1 STEP DOWN SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 27.87 270.00 180.00  
CEC7BD NONRES_EXT_WALL 0.30 0.363 0.384 7.43 180.00 90.00 S
FLOOR 1 STERILE HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 57.23 270.00 180.00  
FLOOR 1 NURSE STORAGE SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 36.79 0.00 180.00  
8E5BB9 NONRES_EXT_WALL 0.30 0.363 0.384 21.37 270.00 90.00 W
859BC1 NONRES_EXT_WALL 0.30 0.363 0.384 37.16 0.00 90.00 N
FLOOR 1 STORAGE SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 85.47 270.00 180.00  
FLOOR 1 STORGE ROOF NONRES_ROOF 0.30 0.269 0.283 85.47 270.00 0.00  
61E610 NONRES_EXT_WALL 0.30 0.363 0.384 13.01 90.00 90.00 E
FLOOR 1 SUB-STERILE SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 18.21 180.00 180.00  
529072 NONRES_EXT_WALL 0.30 0.363 0.384 14.86 90.00 90.00 E
FLOOR 1 UTILITY HALL SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 23.78 90.00 180.00  
FLOOR 1 UTILITY HALL ROOF NONRES_ROOF 0.30 0.269 0.283 11.89 180.00 0.00  
FLOOR 1 UTILITY JANITOR SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 3.90 90.00 180.00  
D95F04 NONRES_EXT_WALL 0.30 0.363 0.384 16.72 90.00 90.00 E
FLOOR 1 UTILITY ROOM SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 33.45 180.00 180.00  
3330D8 NONRES_EXT_WALL 0.30 0.363 0.384 7.43 270.00 90.00 W
FLOOR 1 VESTIBULE SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 6.69 90.00 180.00  
208CCF NONRES_EXT_WALL 0.30 0.363 0.384 11.15 90.00 90.00 E
AEF992 NONRES_EXT_WALL 0.30 0.363 0.384 26.01 180.00 90.00 S
54D065 NONRES_EXT_WALL 0.30 0.363 0.384 11.15 180.00 90.00 S
1775A6 NONRES_EXT_WALL 0.30 0.363 0.384 27.87 270.00 90.00 W
97F00A NONRES_EXT_WALL 0.30 0.363 0.384 16.72 180.00 90.00 S
A497E9 NONRES_EXT_WALL 0.30 0.363 0.384 22.30 180.00 90.00 S
88A75F NONRES_EXT_WALL 0.30 0.363 0.384 6.50 180.00 90.00 S
B4E619 NONRES_EXT_WALL 0.30 0.363 0.384 23.23 90.00 90.00 E
9EC269 NONRES_EXT_WALL 0.30 0.363 0.384 13.94 0.00 90.00 N
B316F7 NONRES_EXT_WALL 0.30 0.363 0.384 22.30 0.00 90.00 N
9621FD NONRES_EXT_WALL 0.30 0.363 0.384 16.72 0.00 90.00 N
42CEE1 NONRES_EXT_WALL 0.30 0.363 0.384 11.15 0.00 90.00 N
4979C8 NONRES_EXT_WALL 0.30 0.363 0.384 5.57 180.00 90.00 S
8CA0BF NONRES_EXT_WALL 0.30 0.363 0.384 5.57 180.00 90.00 S
6C95E7 NONRES_EXT_WALL 0.30 0.363 0.384 5.57 180.00 90.00 S
F209CC NONRES_EXT_WALL 0.30 0.363 0.384 5.57 0.00 90.00 N
155BD6 NONRES_EXT_WALL 0.30 0.363 0.384 5.57 0.00 90.00 N
C5EA55 NONRES_EXT_WALL 0.30 0.363 0.384 5.57 0.00 90.00 N
8177BA NONRES_EXT_WALL 0.30 0.363 0.384 6.50 270.00 90.00 W
5E657E NONRES_EXT_WALL 0.30 0.363 0.384 8.36 0.00 90.00 N
4B1439 NONRES_EXT_WALL 0.30 0.363 0.384 37.16 90.00 90.00 E
4ABC66 NONRES_EXT_WALL 0.30 0.363 0.384 30.66 180.00 90.00 S
5B04CF NONRES_EXT_WALL 0.30 0.363 0.384 14.86 270.00 90.00 W
8D1BC4 NONRES_EXT_WALL 0.30 0.363 0.384 6.50 180.00 90.00 S
4B55FA NONRES_EXT_WALL 0.30 0.363 0.384 8.36 90.00 90.00 E
9C3A6A NONRES_EXT_WALL 0.30 0.363 0.384 20.44 0.00 90.00 N
C52EE0 NONRES_EXT_WALL 0.30 0.363 0.384 3.72 0.00 90.00 N
1C33AD NONRES_EXT_WALL 0.30 0.363 0.384 5.57 270.00 90.00 W
6CC177 NONRES_EXT_WALL 0.30 0.363 0.384 5.57 270.00 90.00 W
FLOOR 3 DRESSING ROOM ROOF NONRES_ROOF 0.30 0.269 0.283 3.90 270.00 0.00  
F7D24D NONRES_EXT_WALL 0.30 0.363 0.384 3.72 0.00 90.00 N
FLOOR 3 ELEVATOR HALL ROOF NONRES_ROOF 0.30 0.269 0.283 34.37 0.00 0.00  
FLOOR 3 HUMID ROOF NONRES_ROOF 0.30 0.269 0.283 10.03 270.00 0.00  
FC22D1 NONRES_EXT_WALL 0.30 0.363 0.384 8.36 0.00 90.00 N
DD2E2D NONRES_EXT_WALL 0.30 0.363 0.384 6.50 270.00 90.00 W
FLOOR 3 JANITOR ROOF NONRES_ROOF 0.30 0.269 0.283 5.85 0.00 0.00  
FLOOR 3 LOCKER ROOF NONRES_ROOF 0.30 0.269 0.283 11.15 0.00 0.00  
68A2D7 NONRES_EXT_WALL 0.30 0.363 0.384 21.37 0.00 90.00 N
FLOOR 3 LOUNGE ROOF NONRES_ROOF 0.30 0.269 0.283 70.51 270.00 0.00  
CE3FEF NONRES_EXT_WALL 0.30 0.363 0.384 11.15 0.00 90.00 N
FLOOR 3 LOUNGE TOILET ROOF NONRES_ROOF 0.30 0.269 0.283 17.84 0.00 0.00  
CE618F NONRES_EXT_WALL 0.30 0.363 0.384 23.23 90.00 90.00 E
FLOOR 3 MECHANICAL ROOF NONRES_ROOF 0.30 0.269 0.283 32.52 0.00 0.00  
FLOOR 3 MECHANICAL HALL ROOF NONRES_ROOF 0.30 0.269 0.283 27.87 0.00 0.00  
5ADC59 NONRES_EXT_WALL 0.30 0.363 0.384 68.75 0.00 90.00 N
FLOOR 3 OFFICE ROOF NONRES_ROOF 0.30 0.269 0.283 282.05 180.00 0.00  
D4F411 NONRES_EXT_WALL 0.30 0.363 0.384 5.57 270.00 90.00 W
FLOOR 3 OFFICE HALL ROOF NONRES_ROOF 0.30 0.269 0.283 77.48 270.00 0.00  
B35AD6 NONRES_EXT_WALL 0.30 0.363 0.384 5.57 270.00 90.00 W
FLOOR 3 OFFICE TOILET ROOF NONRES_ROOF 0.30 0.269 0.283 5.02 270.00 0.00  
D22917 NONRES_EXT_WALL 0.30 0.363 0.384 18.58 90.00 90.00 E
C1BC97 NONRES_EXT_WALL 0.30 0.363 0.384 60.39 180.00 90.00 S
FLOOR 3 PHYICAL THERAPY 1 ROOF NONRES_ROOF 0.30 0.269 0.283 120.77 180.00 0.00  
FLOOR 3 PHYSICAL THERAPY 2 ROOF NONRES_ROOF 0.30 0.269 0.283 55.00 90.00 0.00  
FLOOR 3 PHYSICAL THERAPY TOILET ROOF NONRES_ROOF 0.30 0.269 0.283 7.80 90.00 0.00  
FLOOR 3 STORAGE 1 ROOF NONRES_ROOF 0.30 0.269 0.283 10.03 180.00 0.00  
FLOOR 3 STORAGE 2 ROOF NONRES_ROOF 0.30 0.269 0.283 7.80 180.00 0.00  
FLOOR 3 TREATMENT ROOF NONRES_ROOF 0.30 0.269 0.283 44.22 90.00 0.00  
8DA7DB NONRES_EXT_WALL 0.30 0.363 0.384 39.02 180.00 90.00 S
38B339 NONRES_EXT_WALL 0.30 0.363 0.384 27.87 270.00 90.00 W
FLOOR 3 UNDEVELOPED 1 ROOF NONRES_ROOF 0.30 0.269 0.283 210.70 0.00 0.00  
BE5F2F NONRES_EXT_WALL 0.30 0.363 0.384 14.86 270.00 90.00 W
1DEE26 NONRES_EXT_WALL 0.30 0.363 0.384 37.16 180.00 90.00 S
FLOOR 3 UNDEVELOPED 2 ROOF NONRES_ROOF 0.30 0.269 0.283 107.02 180.00 0.00  
FLOOR 3 UTILITY ROOF NONRES_ROOF 0.30 0.269 0.283 20.07 0.00 0.00  
C86329 NONRES_EXT_WALL 0.30 0.363 0.384 38.09 90.00 90.00 E
FLOOR 3 WORK ROOF NONRES_ROOF 0.30 0.269 0.283 53.33 90.00 0.00  
DFC6F0 NONRES_EXT_WALL 0.30 0.363 0.384 19.51 90.00 90.00 E
88E360 NONRES_EXT_WALL 0.30 0.363 0.384 66.89 0.00 90.00 N
E7B55F NONRES_EXT_WALL 0.30 0.363 0.384 11.15 180.00 90.00 S
NE STAIR SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 15.61 0.00 180.00  
NE STAIR ROOF NONRES_ROOF 0.30 0.269 0.283 15.61 0.00 0.00  
FB3814 NONRES_EXT_WALL 0.30 0.363 0.384 19.51 180.00 90.00 S
FCD12D NONRES_EXT_WALL 0.30 0.363 0.384 55.74 270.00 90.00 W
NW ELEVATOR SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 13.01 90.00 180.00  
NW ELEVATOR ROOF NONRES_ROOF 0.30 0.269 0.283 13.01 90.00 0.00  
5507DC NONRES_EXT_WALL 0.30 0.363 0.384 22.30 270.00 90.00 W
2E2D0C NONRES_EXT_WALL 0.30 0.363 0.384 66.89 0.00 90.00 N
AF0124 NONRES_EXT_WALL 0.30 0.363 0.384 22.30 90.00 90.00 E
NW STAIR SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 17.84 270.00 180.00  
NW STAIR ROOF NONRES_ROOF 0.30 0.269 0.283 17.84 270.00 0.00  
850EA7 NONRES_EXT_WALL 0.30 0.363 0.384 33.45 180.00 90.00 S
270BCE NONRES_EXT_WALL 0.30 0.363 0.384 22.30 270.00 90.00 W
SW STAIR SLAB EXT_SLAB_8IN_WITH_CARPET 0.30 1.827 3.285 8.92 270.00 180.00  
SW STAIR ROOF NONRES_ROOF 0.30 0.269 0.283 8.92 180.00 0.00  


Exterior Fenestration

Construction Glass Area [m2] Frame Area [m2] Divider Area [m2] Area of One Opening [m2] Area of Multiplied Openings [m2] Glass U-Factor [W/m2-K] Glass SHGC Glass Visible Transmittance Frame Conductance [W/m2-K] Divider Conductance [W/m2-K] Shade Control Parent Surface Azimuth [deg] Tilt [deg] Cardinal Direction
78F987 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 481E71 180.00 90.00 S
D8037E WINDOW_U_0.48_SHGC_0.40 8.92 0.00 0.00 8.92 8.92 2.653 0.426 0.308     No 5F762C 180.00 90.00 S
4A8120 WINDOW_U_0.48_SHGC_0.40 2.32 0.00 0.00 2.32 2.32 2.653 0.426 0.308     No 84FB73 0.00 90.00 N
AAE778 WINDOW_U_0.48_SHGC_0.40 8.92 0.00 0.00 8.92 8.92 2.653 0.426 0.308     No FE5A3C 270.00 90.00 W
3AAD8B WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No F629C1 0.00 90.00 N
8128A9 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No F629C1 0.00 90.00 N
9B1541 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 879583 180.00 90.00 S
CF850A WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 879583 180.00 90.00 S
A6BA23 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No E326E4 90.00 90.00 E
D10D28 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No E326E4 90.00 90.00 E
591336 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 1D96D7 90.00 90.00 E
38B811 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 1D96D7 90.00 90.00 E
C044D6 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 1D96D7 90.00 90.00 E
1D94BE WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 6D2616 0.00 90.00 N
18748E WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 6D2616 0.00 90.00 N
137A56 WINDOW_U_0.48_SHGC_0.40 3.34 0.00 0.00 3.34 3.34 2.653 0.426 0.308     No A5A6A3 180.00 90.00 S
8D508E WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 28B002 180.00 90.00 S
B2D381 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 28B002 180.00 90.00 S
1DA13A WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 28B002 180.00 90.00 S
44E54A WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 28B002 180.00 90.00 S
757D10 WINDOW_U_0.48_SHGC_0.40 0.74 0.00 0.00 0.74 0.74 2.653 0.426 0.308     No EA6DC8 180.00 90.00 S
E33BAE WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No B40F89 270.00 90.00 W
24167A WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 997723 180.00 90.00 S
2C0938 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 997723 180.00 90.00 S
8600DD WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No CEC7BD 180.00 90.00 S
A1ED60 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 859BC1 0.00 90.00 N
E8D997 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 859BC1 0.00 90.00 N
88E1FC WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 859BC1 0.00 90.00 N
F83F33 WINDOW_U_0.48_SHGC_0.40 2.97 0.00 0.00 2.97 2.97 2.653 0.426 0.308     No 61E610 90.00 90.00 E
B1F5EE WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No D95F04 90.00 90.00 E
F52F3D WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 208CCF 90.00 90.00 E
80885D WINDOW_U_0.48_SHGC_0.40 6.69 0.00 0.00 6.69 6.69 2.653 0.426 0.308     No AEF992 180.00 90.00 S
FEEF06 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 54D065 180.00 90.00 S
2BE8DE WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 1775A6 270.00 90.00 W
513E2A WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 1775A6 270.00 90.00 W
BA5CD9 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 1775A6 270.00 90.00 W
1AD478 WINDOW_U_0.48_SHGC_0.40 3.72 0.00 0.00 3.72 3.72 2.653 0.426 0.308     No 97F00A 180.00 90.00 S
27F0AC WINDOW_U_0.48_SHGC_0.40 5.95 0.00 0.00 5.95 5.95 2.653 0.426 0.308     No A497E9 180.00 90.00 S
724114 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 88A75F 180.00 90.00 S
D538C4 WINDOW_U_0.48_SHGC_0.40 2.97 0.00 0.00 2.97 2.97 2.653 0.426 0.308     No B4E619 90.00 90.00 E
5635BC WINDOW_U_0.48_SHGC_0.40 2.97 0.00 0.00 2.97 2.97 2.653 0.426 0.308     No B4E619 90.00 90.00 E
831C1D WINDOW_U_0.48_SHGC_0.40 4.18 0.00 0.00 4.18 4.18 2.653 0.426 0.308     No 9EC269 0.00 90.00 N
9BB95F WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No B316F7 0.00 90.00 N
C0778D WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No B316F7 0.00 90.00 N
7D2D69 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 9621FD 0.00 90.00 N
2EF63B WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 9621FD 0.00 90.00 N
C417C0 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 42CEE1 0.00 90.00 N
EB042B WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 4B1439 90.00 90.00 E
4C1F71 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 4B1439 90.00 90.00 E
D23C8B WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 4B1439 90.00 90.00 E
B4E4BE WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 4B1439 90.00 90.00 E
EEF55D WINDOW_U_0.48_SHGC_0.40 6.69 0.00 0.00 6.69 6.69 2.653 0.426 0.308     No 4ABC66 180.00 90.00 S
E55A57 WINDOW_U_0.48_SHGC_0.40 3.34 0.00 0.00 3.34 3.34 2.653 0.426 0.308     No 4ABC66 180.00 90.00 S
93D018 WINDOW_U_0.48_SHGC_0.40 6.69 0.00 0.00 6.69 6.69 2.653 0.426 0.308     No 5B04CF 270.00 90.00 W
DD9F5D WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No 4B55FA 90.00 90.00 E
15B02B WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 9C3A6A 0.00 90.00 N
820282 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 9C3A6A 0.00 90.00 N
9BA05A WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 68A2D7 0.00 90.00 N
C639E8 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 68A2D7 0.00 90.00 N
A2790A WINDOW_U_0.48_SHGC_0.40 4.18 0.00 0.00 4.18 4.18 2.653 0.426 0.308     No CE3FEF 0.00 90.00 N
79FCEE WINDOW_U_0.48_SHGC_0.40 2.97 0.00 0.00 2.97 2.97 2.653 0.426 0.308     No CE618F 90.00 90.00 E
EDE617 WINDOW_U_0.48_SHGC_0.40 2.97 0.00 0.00 2.97 2.97 2.653 0.426 0.308     No CE618F 90.00 90.00 E
C61F0D WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 5ADC59 0.00 90.00 N
7248C5 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 5ADC59 0.00 90.00 N
29FA28 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 5ADC59 0.00 90.00 N
F0B23F WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 5ADC59 0.00 90.00 N
EEC10E WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 5ADC59 0.00 90.00 N
944FCE WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 5ADC59 0.00 90.00 N
C41399 WINDOW_U_0.48_SHGC_0.40 2.79 0.00 0.00 2.79 2.79 2.653 0.426 0.308     No 5ADC59 0.00 90.00 N
95BA33 WINDOW_U_0.48_SHGC_0.40 3.34 0.00 0.00 3.34 3.34 2.653 0.426 0.308     No D22917 90.00 90.00 E
F27282 WINDOW_U_0.48_SHGC_0.40 3.34 0.00 0.00 3.34 3.34 2.653 0.426 0.308     No D22917 90.00 90.00 E
3DB407 WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No C1BC97 180.00 90.00 S
3DADE2 WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No C1BC97 180.00 90.00 S
DF3E2C WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No C1BC97 180.00 90.00 S
5031C8 WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No C1BC97 180.00 90.00 S
C087D0 WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No 8DA7DB 180.00 90.00 S
D2CA75 WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No 8DA7DB 180.00 90.00 S
B0FB49 WINDOW_U_0.48_SHGC_0.40 4.46 0.00 0.00 4.46 4.46 2.653 0.426 0.308     No 8DA7DB 180.00 90.00 S
FE9BC9 WINDOW_U_0.48_SHGC_0.40 3.34 0.00 0.00 3.34 3.34 2.653 0.426 0.308     No 38B339 270.00 90.00 W
9DF7DE WINDOW_U_0.48_SHGC_0.40 3.34 0.00 0.00 3.34 3.34 2.653 0.426 0.308     No 38B339 270.00 90.00 W
D0BE44 WINDOW_U_0.48_SHGC_0.40 3.34 0.00 0.00 3.34 3.34 2.653 0.426 0.308     No 38B339 270.00 90.00 W
6B5226 WINDOW_U_0.48_SHGC_0.40 4.46 0.00 0.00 4.46 4.46 2.653 0.426 0.308     No BE5F2F 270.00 90.00 W
8F59F7 WINDOW_U_0.48_SHGC_0.40 4.46 0.00 0.00 4.46 4.46 2.653 0.426 0.308     No 1DEE26 180.00 90.00 S
44F571 WINDOW_U_0.48_SHGC_0.40 4.46 0.00 0.00 4.46 4.46 2.653 0.426 0.308     No 1DEE26 180.00 90.00 S
6BD844 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No C86329 90.00 90.00 E
86D536 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No C86329 90.00 90.00 E
BAF71D WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No C86329 90.00 90.00 E
3833A2 WINDOW_U_0.48_SHGC_0.40 2.23 0.00 0.00 2.23 2.23 2.653 0.426 0.308     No C86329 90.00 90.00 E
2111A1 WINDOW_U_0.48_SHGC_0.40 0.74 0.00 0.00 0.74 0.74 2.653 0.426 0.308     No DFC6F0 90.00 90.00 E
9BC521 WINDOW_U_0.48_SHGC_0.40 5.71 0.00 0.00 5.71 5.71 2.653 0.426 0.308     No 88E360 0.00 90.00 N
142781 WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No 88E360 0.00 90.00 N
E74902 WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No 2E2D0C 0.00 90.00 N
93BBC3 WINDOW_U_0.48_SHGC_0.40 5.57 0.00 0.00 5.57 5.57 2.653 0.426 0.308     No 2E2D0C 0.00 90.00 N
C635A6 WINDOW_U_0.48_SHGC_0.40 1.11 0.00 0.00 1.11 1.11 2.653 0.426 0.308     No 850EA7 180.00 90.00 S
Total or Average           308.29 2.653 0.426 0.308              
North Total or Average           97.22 2.653 0.426 0.308              
Non-North Total or Average           211.08 2.653 0.426 0.308              


Interior Fenestration

Construction Area of One Opening [m2] Area of Openings [m2] Glass U-Factor [W/m2-K] Glass SHGC Glass Visible Transmittance Parent Surface
Total or Average     0.00 - - -  


Exterior Door

Construction U-Factor with Film [W/m2-K] U-Factor no Film [W/m2-K] Gross Area [m2] Parent Surface
BA05F7 SWINGING DOOR_CON 2.839 2.839 1.95 E02487
F67E1F SWINGING DOOR_CON 2.839 2.839 1.95 FE5A3C
7EB6E7 SWINGING DOOR_CON 2.839 2.839 1.95 E85BB5
D18914 SWINGING DOOR_CON 2.839 2.839 1.95 C114C1
D4B39B SWINGING DOOR_CON 2.839 2.839 1.95 E326E4
D2D3BC SWINGING DOOR_CON 2.839 2.839 1.95 28B002
C528DA SWINGING DOOR_CON 2.839 2.839 1.95 28B002
EFD3F9 SWINGING DOOR_CON 2.839 2.839 1.95 28B002
62B5AF SWINGING DOOR_CON 2.839 2.839 1.95 997723
71E924 SWINGING DOOR_CON 2.839 2.839 2.97 8E5BB9
3C44F9 SWINGING DOOR_CON 2.839 2.839 1.95 859BC1
49526E SWINGING DOOR_CON 2.839 2.839 1.95 859BC1
865AE8 SWINGING DOOR_CON 2.839 2.839 1.95 859BC1
5E66D1 OVERHEAD DOOR_CON 2.841 2.841 7.43 529072
E14DAE SWINGING DOOR_CON 2.839 2.839 1.95 D95F04
84A1D5 SWINGING DOOR_CON 2.839 2.839 1.95 3330D8
9CB8E5 SWINGING DOOR_CON 2.839 2.839 1.95 88E360
E4A528 SWINGING DOOR_CON 2.839 2.839 1.95 88E360
24BAF7 SWINGING DOOR_CON 2.839 2.839 1.95 FB3814
19E57D SWINGING DOOR_CON 2.839 2.839 1.95 FCD12D
EDE769 SWINGING DOOR_CON 2.839 2.839 1.95 5507DC
1C9872 SWINGING DOOR_CON 2.839 2.839 1.95 2E2D0C
F402E9 SWINGING DOOR_CON 2.839 2.839 1.95 270BCE



Table of Contents

Report: Equipment Summary

For: Entire Facility

Timestamp: 2018-10-19 19:11:00

Central Plant

Type Nominal Capacity [W] Nominal Efficiency [W/W] IPLV in SI Units [W/W] IPLV in IP Units [Btu/W-h]
HEATSYS1 BOILER Boiler:HotWater 125605.40 0.80    


Cooling Coils

Type Design Coil Load [W] Nominal Total Capacity [W] Nominal Sensible Capacity [W] Nominal Latent Capacity [W] Nominal Sensible Heat Ratio Nominal Efficiency [W/W] Nominal Coil UA Value [W/C] Nominal Coil Surface Area [m2]
AHU-1_COOLC DXCOIL Coil:Cooling:DX:TwoSpeed   179746.23 121523.41 58222.82 0.68 3.40    
AHU-2_COOLC DXCOIL Coil:Cooling:DX:TwoSpeed   260004.42 177574.83 82429.59 0.68 3.30    


DX Cooling Coils

DX Cooling Coil Type Standard Rated Net Cooling Capacity [W] Standard Rated Net COP [W/W] EER [Btu/W-h] SEER [Btu/W-h] IEER [Btu/W-h]
AHU-1_COOLC DXCOIL Coil:Cooling:DX:TwoSpeed 174453.2 3.01 10.25 N/A 11.46
AHU-2_COOLC DXCOIL Coil:Cooling:DX:TwoSpeed 252120.5 2.91 9.95 N/A 11.12
ANSI/AHRI ratings include supply fan

DX Heating Coils

DX Heating Coil Type High Temperature Heating (net) Rating Capacity [W] Low Temperature Heating (net) Rating Capacity [W] HSPF [Btu/W-h] Region Number
None          


Heating Coils

Type Design Coil Load [W] Nominal Total Capacity [W] Nominal Efficiency [W/W]
FLOOR 1 ANESTHESIA VAV BOX REHEAT COIL Coil:Heating:Water 1942.60 1924.50 -
FLOOR 1 BIO HAZ VAV BOX REHEAT COIL Coil:Heating:Water 161.17 159.67 -
FLOOR 1 CAFE VAV BOX REHEAT COIL Coil:Heating:Water 4528.61 3085.75 -
FLOOR 1 CLEAN VAV BOX REHEAT COIL Coil:Heating:Water 1209.19 1197.93 -
FLOOR 1 CLEAN WORK VAV BOX REHEAT COIL Coil:Heating:Water 1508.86 1494.80 -
FLOOR 1 DICTATION VAV BOX REHEAT COIL Coil:Heating:Water 365.18 248.83 -
FLOOR 1 DRESSING ROOM VAV BOX REHEAT COIL Coil:Heating:Water 539.16 534.13 -
FLOOR 1 ELECTRICAL ROOM VAV BOX REHEAT COIL Coil:Heating:Water 656.82 447.55 -
FLOOR 1 ELEVATOR PUMP ROOM VAV BOX REHEAT COIL Coil:Heating:Water 4062.39 2768.08 -
FLOOR 1 HUMID VAV BOX REHEAT COIL Coil:Heating:Water 179.05 122.00 -
FLOOR 1 IT HALL VAV BOX REHEAT COIL Coil:Heating:Water 256.92 175.07 -
FLOOR 1 IT ROOM VAV BOX REHEAT COIL Coil:Heating:Water 296.07 201.74 -
FLOOR 1 LOBBY VAV BOX REHEAT COIL Coil:Heating:Water 4038.04 3166.12 -
FLOOR 1 LOBBY HALL VAV BOX REHEAT COIL Coil:Heating:Water 554.53 377.85 -
FLOOR 1 LOBBY TOILET VAV BOX REHEAT COIL Coil:Heating:Water 1214.13 1202.81 -
FLOOR 1 LOCKER ROOM VAV BOX REHEAT COIL Coil:Heating:Water 3306.03 2252.70 -
FLOOR 1 LOCKER ROOM HALL VAV BOX REHEAT COIL Coil:Heating:Water 803.15 547.26 -
FLOOR 1 LOUNGE VAV BOX REHEAT COIL Coil:Heating:Water 1657.74 1129.57 -
FLOOR 1 MED GAS VAV BOX REHEAT COIL Coil:Heating:Water 831.17 823.43 -
FLOOR 1 MRI CONTROL ROOM VAV BOX REHEAT COIL Coil:Heating:Water 2266.37 1544.28 -
FLOOR 1 MRI HALL VAV BOX REHEAT COIL Coil:Heating:Water 347.35 236.68 -
FLOOR 1 MRI ROOM VAV BOX REHEAT COIL Coil:Heating:Water 5935.72 4044.55 -
FLOOR 1 MRI TOILET VAV BOX REHEAT COIL Coil:Heating:Water 1214.13 1202.81 -
FLOOR 1 NOURISHMENT VAV BOX REHEAT COIL Coil:Heating:Water 814.57 555.04 -
FLOOR 1 NURSE HALL VAV BOX REHEAT COIL Coil:Heating:Water 976.18 665.16 -
FLOOR 1 NURSE JANITOR VAV BOX REHEAT COIL Coil:Heating:Water 121.44 82.75 -
FLOOR 1 NURSE STATION VAV BOX REHEAT COIL Coil:Heating:Water 1095.53 746.48 -
FLOOR 1 NURSE TOILET VAV BOX REHEAT COIL Coil:Heating:Water 1214.13 1202.81 -
FLOOR 1 OFFICE VAV BOX REHEAT COIL Coil:Heating:Water 1185.14 807.54 -
FLOOR 1 OPERATING ROOM 1 VAV BOX REHEAT COIL Coil:Heating:Water 13709.63 13581.90 -
FLOOR 1 OPERATING ROOM 2 VAV BOX REHEAT COIL Coil:Heating:Water 14240.31 14107.64 -
FLOOR 1 OPERATING ROOM 3 VAV BOX REHEAT COIL Coil:Heating:Water 21404.58 21205.16 -
FLOOR 1 PACU VAV BOX REHEAT COIL Coil:Heating:Water 1456.95 1443.38 -
FLOOR 1 PRE-OP HALL VAV BOX REHEAT COIL Coil:Heating:Water 964.62 657.28 -
FLOOR 1 PRE-OP ROOM 1 VAV BOX REHEAT COIL Coil:Heating:Water 2549.66 2525.91 -
FLOOR 1 PRE-OP ROOM 2 VAV BOX REHEAT COIL Coil:Heating:Water 4559.71 4517.23 -
FLOOR 1 PRE-OP TOILET VAV BOX REHEAT COIL Coil:Heating:Water 1214.13 1202.81 -
FLOOR 1 PROCEDURE ROOM VAV BOX REHEAT COIL Coil:Heating:Water 9611.82 9522.28 -
FLOOR 1 RECEPTION VAV BOX REHEAT COIL Coil:Heating:Water 2548.92 1736.81 -
FLOOR 1 RECEPTION HALL VAV BOX REHEAT COIL Coil:Heating:Water 249.48 170.00 -
FLOOR 1 RECOVERY ROOM VAV BOX REHEAT COIL Coil:Heating:Water 7332.14 7263.83 -
FLOOR 1 SCHEDULING VAV BOX REHEAT COIL Coil:Heating:Water 424.56 386.77 -
FLOOR 1 SCRUB VAV BOX REHEAT COIL Coil:Heating:Water 185.23 179.26 -
FLOOR 1 SOIL VAV BOX REHEAT COIL Coil:Heating:Water 2832.96 2806.57 -
FLOOR 1 SOIL HOLD VAV BOX REHEAT COIL Coil:Heating:Water 1259.09 1247.36 -
FLOOR 1 SOIL WORK VAV BOX REHEAT COIL Coil:Heating:Water 4047.08 4009.38 -
FLOOR 1 STEP DOWN VAV BOX REHEAT COIL Coil:Heating:Water 3568.99 3535.74 -
FLOOR 1 STERILE HALL VAV BOX REHEAT COIL Coil:Heating:Water 1062.61 927.26 -
FLOOR 1 STERILE STORAGE VAV BOX REHEAT COIL Coil:Heating:Water 570.57 388.78 -
FLOOR 1 STORAGE VAV BOX REHEAT COIL Coil:Heating:Water 5464.24 5413.33 -
FLOOR 1 SUB-STERILE VAV BOX REHEAT COIL Coil:Heating:Water 1117.83 1107.42 -
FLOOR 1 UTILITY HALL VAV BOX REHEAT COIL Coil:Heating:Water 1680.13 1664.47 -
FLOOR 1 UTILITY JANITOR VAV BOX REHEAT COIL Coil:Heating:Water 91.13 90.28 -
FLOOR 1 UTILITY ROOM VAV BOX REHEAT COIL Coil:Heating:Water 1731.66 1715.53 -
FLOOR 1 VESTIBULE VAV BOX REHEAT COIL Coil:Heating:Water 516.23 511.42 -
FLOOR 2 CONFERENCE VAV BOX REHEAT COIL Coil:Heating:Electric   2786.56 1.00
FLOOR 2 CONFERENCE TOILET VAV BOX REHEAT COIL Coil:Heating:Electric   1414.93 1.00
FLOOR 2 DICTATION VAV BOX REHEAT COIL Coil:Heating:Electric   137.17 1.00
FLOOR 2 EXAM 1 VAV BOX REHEAT COIL Coil:Heating:Electric   3931.78 1.00
FLOOR 2 EXAM 2 VAV BOX REHEAT COIL Coil:Heating:Electric   7163.10 1.00
FLOOR 2 EXAM 3 VAV BOX REHEAT COIL Coil:Heating:Electric   9550.80 1.00
FLOOR 2 EXAM 4 VAV BOX REHEAT COIL Coil:Heating:Electric   1056.56 1.00
FLOOR 2 EXAM 5 VAV BOX REHEAT COIL Coil:Heating:Electric   4425.39 1.00
FLOOR 2 EXAM 6 VAV BOX REHEAT COIL Coil:Heating:Electric   2805.55 1.00
FLOOR 2 EXAM 7 VAV BOX REHEAT COIL Coil:Heating:Electric   10505.88 1.00
FLOOR 2 EXAM 8 VAV BOX REHEAT COIL Coil:Heating:Electric   3330.84 1.00
FLOOR 2 EXAM 9 VAV BOX REHEAT COIL Coil:Heating:Electric   5252.94 1.00
FLOOR 2 EXAM HALL 1 VAV BOX REHEAT COIL Coil:Heating:Electric   623.23 1.00
FLOOR 2 EXAM HALL 2 VAV BOX REHEAT COIL Coil:Heating:Electric   469.36 1.00
FLOOR 2 EXAM HALL 3 VAV BOX REHEAT COIL Coil:Heating:Electric   455.12 1.00
FLOOR 2 EXAM HALL 4 VAV BOX REHEAT COIL Coil:Heating:Electric   376.65 1.00
FLOOR 2 EXAM HALL 5 VAV BOX REHEAT COIL Coil:Heating:Electric   387.90 1.00
FLOOR 2 EXAM HALL 6 VAV BOX REHEAT COIL Coil:Heating:Electric   445.57 1.00
FLOOR 2 JANITOR VAV BOX REHEAT COIL Coil:Heating:Electric   831.01 1.00
FLOOR 2 LOUNGE VAV BOX REHEAT COIL Coil:Heating:Electric   248.98 1.00
FLOOR 2 NURSE STATION 1 VAV BOX REHEAT COIL Coil:Heating:Electric   553.30 1.00
FLOOR 2 NURSE STATION 2 VAV BOX REHEAT COIL Coil:Heating:Electric   663.96 1.00
FLOOR 2 OFFICE VAV BOX REHEAT COIL Coil:Heating:Electric   3380.21 1.00
FLOOR 2 OFFICE HALL VAV BOX REHEAT COIL Coil:Heating:Electric   963.69 1.00
FLOOR 2 RECEPTION VAV BOX REHEAT COIL Coil:Heating:Electric   4763.90 1.00
FLOOR 2 RECEPTION HALL VAV BOX REHEAT COIL Coil:Heating:Electric   864.19 1.00
FLOOR 2 RECEPTION TOILET VAV BOX REHEAT COIL Coil:Heating:Electric   2785.65 1.00
FLOOR 2 SCHEDULING 1 VAV BOX REHEAT COIL Coil:Heating:Electric   634.91 1.00
FLOOR 2 SCHEDULING 2 VAV BOX REHEAT COIL Coil:Heating:Electric   670.19 1.00
FLOOR 2 STORAGE 1 VAV BOX REHEAT COIL Coil:Heating:Electric   154.92 1.00
FLOOR 2 STORAGE 2 VAV BOX REHEAT COIL Coil:Heating:Electric   331.98 1.00
FLOOR 2 STORAGE 3 VAV BOX REHEAT COIL Coil:Heating:Electric   398.38 1.00
FLOOR 2 UTILITY VAV BOX REHEAT COIL Coil:Heating:Electric   940.83 1.00
FLOOR 2 WORK VAV BOX REHEAT COIL Coil:Heating:Electric   3311.76 1.00
FLOOR 2 WORK HALL VAV BOX REHEAT COIL Coil:Heating:Electric   1190.19 1.00
FLOOR 2 WORK TOILET VAV BOX REHEAT COIL Coil:Heating:Electric   1193.85 1.00
FLOOR 2 X-RAY VAV BOX REHEAT COIL Coil:Heating:Electric   6224.71 1.00
FLOOR 3 DRESSING ROOM VAV BOX REHEAT COIL Coil:Heating:Electric   237.20 1.00
FLOOR 3 ELEVATOR HALL VAV BOX REHEAT COIL Coil:Heating:Electric   1538.82 1.00
FLOOR 3 HUMID VAV BOX REHEAT COIL Coil:Heating:Electric   539.09 1.00
FLOOR 3 JANITOR VAV BOX REHEAT COIL Coil:Heating:Electric   696.15 1.00
FLOOR 3 LOCKER VAV BOX REHEAT COIL Coil:Heating:Electric   606.48 1.00
FLOOR 3 LOUNGE VAV BOX REHEAT COIL Coil:Heating:Electric   2362.24 1.00
FLOOR 3 LOUNGE TOILET VAV BOX REHEAT COIL Coil:Heating:Electric   4244.80 1.00
FLOOR 3 MECHANICAL VAV BOX REHEAT COIL Coil:Heating:Electric   1947.80 1.00
FLOOR 3 MECHANICAL HALL VAV BOX REHEAT COIL Coil:Heating:Electric   2025.40 1.00
FLOOR 3 OFFICE VAV BOX REHEAT COIL Coil:Heating:Electric   10356.73 1.00
FLOOR 3 OFFICE HALL VAV BOX REHEAT COIL Coil:Heating:Electric   3480.61 1.00
FLOOR 3 OFFICE TOILET VAV BOX REHEAT COIL Coil:Heating:Electric   1193.85 1.00
FLOOR 3 PHYSICAL THERAPY 1 VAV BOX REHEAT COIL Coil:Heating:Electric   16126.53 1.00
FLOOR 3 PHYSICAL THERAPY 2 VAV BOX REHEAT COIL Coil:Heating:Electric   6517.89 1.00
FLOOR 3 PHYSICAL THERAPY TOILET VAV BOX REHEAT COIL Coil:Heating:Electric   1857.10 1.00
FLOOR 3 STORAGE 1 VAV BOX REHEAT COIL Coil:Heating:Electric   724.25 1.00
FLOOR 3 STORAGE 2 VAV BOX REHEAT COIL Coil:Heating:Electric   579.28 1.00
FLOOR 3 TREATMENT VAV BOX REHEAT COIL Coil:Heating:Electric   5190.74 1.00
FLOOR 3 UNDEVELOPED 1 VAV BOX REHEAT COIL Coil:Heating:Electric   9165.91 1.00
FLOOR 3 UNDEVELOPED 2 VAV BOX REHEAT COIL Coil:Heating:Electric   5827.56 1.00
FLOOR 3 UTILITY VAV BOX REHEAT COIL Coil:Heating:Electric   1210.52 1.00
FLOOR 3 WORK VAV BOX REHEAT COIL Coil:Heating:Electric   3456.27 1.00
NE STAIR VAV BOX REHEAT COIL Coil:Heating:Electric   5076.93 1.00
NW ELEVATOR VAV BOX REHEAT COIL Coil:Heating:Electric   3162.93 1.00
NW STAIR VAV BOX REHEAT COIL Coil:Heating:Electric   5253.18 1.00
SW STAIR VAV BOX REHEAT COIL Coil:Heating:Electric   2449.41 1.00
AHU-1_HEATC Coil:Heating:Water 78870.17 68412.82 -
AHU-1_EXTRAELECHEATC Coil:Heating:Electric   10000000.00 1.00
AHU-1_EXTRAWATERHEATC Coil:Heating:Water 78870.17 68412.82 -
AHU-2_HEATC Coil:Heating:Water 134224.44 114383.51 -


Fans

Type Total Efficiency [W/W] Delta Pressure [pa] Max Air Flow Rate [m3/s] Rated Electric Power [W] Rated Power Per Max Air Flow Rate [W-s/m3] Motor Heat In Air Fraction End Use
FLOOR 1 ANESTHESIA EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.07 54.61 803.55 1.00 Zone Exhaust Fans
FLOOR 1 LOBBY TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.04 34.13 803.55 1.00 Zone Exhaust Fans
FLOOR 1 MRI CONTROL ROOM EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.16 127.44 803.55 1.00 Zone Exhaust Fans
FLOOR 1 MRI ROOM EXHAUST FAN Fan:ZoneExhaust 0.16 124.50 0.42 323.16 778.12 1.00 Zone Exhaust Fans
FLOOR 1 MRI TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.04 34.13 803.55 1.00 Zone Exhaust Fans
FLOOR 1 NURSE TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.04 34.13 803.55 1.00 Zone Exhaust Fans
FLOOR 1 PRE-OP TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.04 34.13 803.55 1.00 Zone Exhaust Fans
FLOOR 1 SOIL EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.10 79.63 803.55 1.00 Zone Exhaust Fans
FLOOR 1 SOIL HOLD EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.04 35.39 803.55 1.00 Zone Exhaust Fans
FLOOR 1 SOIL WORK EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.14 113.76 803.55 1.00 Zone Exhaust Fans
FLOOR 2 CONFERENCE TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.05 40.45 803.55 1.00 Zone Exhaust Fans
FLOOR 2 RECEPTION TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.10 79.63 803.55 1.00 Zone Exhaust Fans
FLOOR 2 WORK TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.04 34.13 803.55 1.00 Zone Exhaust Fans
FLOOR 2 X-RAY EXHAUST FAN Fan:ZoneExhaust 0.16 124.50 0.85 661.02 778.13 1.00 Zone Exhaust Fans
FLOOR 3 LOUNGE TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.15 121.35 803.55 1.00 Zone Exhaust Fans
FLOOR 3 OFFICE TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.04 34.13 803.55 1.00 Zone Exhaust Fans
FLOOR 3 PHYSICAL THERAPY TOILET EXHAUST FAN Fan:ZoneExhaust 0.31 249.10 0.07 53.09 803.55 1.00 Zone Exhaust Fans
AHU-1_FAN Fan:VariableVolume 0.61 1389.42 7.24 16530.49 2283.73 1.00 Fan Energy
AHU-2_FAN Fan:VariableVolume 0.61 1389.42 10.76 24452.63 2271.59 1.00 Fan Energy


Pumps

Type Control Head [pa] Water Flow [m3/s] Electric Power [W] Power Per Water Flow Rate [W-s/m3] Motor Efficiency [W/W]
SWHSYS1 PUMP Pump:ConstantSpeed Intermittent 29891.00 0.0001 8.07 127739.32 0.30
HEATSYS1 PUMP Pump:VariableSpeed Intermittent 179352.00 0.0027 688.20 255487.18 0.90


Service Water Heating

Type Storage Volume [m3] Input [W] Thermal Efficiency [W/W] Recovery Efficiency [W/W] Energy Factor
SWHSYS1 WATER HEATER WaterHeater:Mixed 0.76 58614.20 0.81 0.00 0.00


VAV DX Cooling Standard Rating Details

DX Cooling Coil Type Assocated Fan Net Cooling Capacity [W] COP [W/W] EER [Btu/W-h] IEER [Btu/W-h] Supply Air Flow 100% [kg/s] COP 75% Capacity [W/W] EER 75% Capacity [Btu/W-h] Supply Air Flow 75% [kg/s] COP 50% Capacity [W/W] EER 50% Capacity [Btu/W-h] Supply Air Flow 50% [kg/s] COP 25% Capacity [W/W] EER 25% Capacity [Btu/W-h] Supply Air Flow 25% [kg/s]
AHU-1_COOLC DXCOIL Coil:Cooling:DX:TwoSpeed None 174453.19 3.01 10.25 11.46 7.9845 3.28 11.18 6.3351 3.47 11.85 4.2874 3.60 12.28 1.8860
AHU-2_COOLC DXCOIL Coil:Cooling:DX:TwoSpeed None 252120.52 2.91 9.95 11.12 11.8742 3.18 10.85 9.3761 3.38 11.52 6.2957 3.49 11.92 2.7814
Indoor-coil-only unit ratings per ANSI/AHRI Standard 340/360-2007 with Addenda 1 and 2, with supply fan specific power at 365 {W/1000cfm} (773.3 {W/(m3/s)})


Table of Contents

Report: HVAC Sizing Summary

For: Entire Facility

Timestamp: 2018-10-19 19:11:00

Zone Cooling

Calculated Design Load [W] User Design Load [W] Calculated Design Air Flow [m3/s] User Design Air Flow [m3/s] Design Day Name Date/Time Of Peak Temperature at Peak [C] Humidity Ratio at Peak [kgWater/kgAir]
FLOOR 1 ANESTHESIA 741.76 741.76 0.057 0.068 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:50:00 31.11 0.01534
FLOOR 1 CAFE 4117.02 4117.02 0.317 0.317 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:40:00 31.02 0.01534
FLOOR 1 CLEAN 550.27 550.27 0.042 0.042 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:20:00 25.97 0.01534
FLOOR 1 CLEAN WORK 686.63 686.63 0.053 0.053 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:50:00 26.87 0.01534
FLOOR 1 DICTATION 344.36 344.36 0.026 0.026 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 DRESSING ROOM 201.72 201.72 0.016 0.016 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:00:00 31.20 0.01534
FLOOR 1 HUMID 168.31 168.31 0.013 0.013 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 IT ROOM 269.52 269.52 0.021 0.021 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:00:00 31.20 0.01534
FLOOR 1 LOBBY 3675.56 3675.56 0.283 0.283 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 17:40:00 29.01 0.01534
FLOOR 1 LOCKER ROOM 3008.95 3008.95 0.231 0.231 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:00:00 31.20 0.01534
FLOOR 1 LOUNGE 1508.85 1508.85 0.116 0.116 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 10:40:00 28.23 0.01534
FLOOR 1 MRI CONTROL ROOM 1836.39 1836.39 0.141 0.159 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 16:50:00 29.86 0.01534
FLOOR 1 MRI ROOM 4519.83 4519.83 0.347 0.415 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 18:00:00 28.66 0.01534
FLOOR 1 NOURISHMENT 741.38 741.38 0.057 0.057 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 08:50:00 25.03 0.01534
FLOOR 1 NURSE STATION 997.08 997.08 0.077 0.077 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 08:50:00 25.03 0.01534
FLOOR 1 OFFICE 1078.85 1078.85 0.083 0.083 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:00:00 25.37 0.01534
FLOOR 1 OPERATING ROOM 1 6744.69 6744.69 0.799 0.799 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 10:40:00 28.23 0.01534
FLOOR 1 OPERATING ROOM 2 7006.12 7006.12 0.830 0.830 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:20:00 25.97 0.01534
FLOOR 1 OPERATING ROOM 3 5795.03 5795.03 0.649 0.749 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 07:20:00 22.15 0.01534
FLOOR 1 PACU 516.22 516.22 0.040 0.051 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:10:00 25.67 0.01534
FLOOR 1 PRE-OP ROOM 1 595.66 595.66 0.046 0.089 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 17:40:00 29.01 0.01534
FLOOR 1 PRE-OP ROOM 2 1056.43 1056.43 0.081 0.160 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 08:30:00 24.36 0.01534
FLOOR 1 PROCEDURE ROOM 1727.97 1727.97 0.133 0.336 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:00:00 31.20 0.01534
FLOOR 1 RECEPTION 2319.44 2319.44 0.178 0.178 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:00:00 31.20 0.01534
FLOOR 1 RECOVERY ROOM 3834.85 3834.85 0.295 0.295 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:50:00 31.11 0.01534
FLOOR 1 SCHEDULING 386.46 386.46 0.030 0.030 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 1 SOIL 545.94 545.94 0.042 0.099 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:30:00 26.27 0.01534
FLOOR 1 SOIL HOLD 228.02 228.02 0.018 0.044 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 1 SOIL WORK 733.12 733.12 0.056 0.142 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:40:00 26.57 0.01534
FLOOR 1 STEP DOWN 2353.54 2353.54 0.181 0.181 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:40:00 30.78 0.01534
FLOOR 2 CONFERENCE 2990.53 2990.53 0.272 0.272 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:40:00 31.02 0.01534
FLOOR 2 DICTATION 253.11 253.11 0.022 0.022 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 EXAM 1 3020.99 3020.99 0.274 0.274 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 17:10:00 29.54 0.01534
FLOOR 2 EXAM 2 2574.68 2574.68 0.234 0.255 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:00:00 31.20 0.01534
FLOOR 2 EXAM 3 3540.03 3540.03 0.321 0.340 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:50:00 31.11 0.01534
FLOOR 2 EXAM 4 646.96 646.96 0.059 0.059 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:40:00 31.02 0.01534
FLOOR 2 EXAM 5 2513.36 2513.36 0.228 0.228 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:40:00 26.57 0.01534
FLOOR 2 EXAM 6 1074.19 1074.19 0.098 0.106 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:50:00 31.20 0.01534
FLOOR 2 EXAM 7 3212.77 3212.77 0.292 0.374 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:40:00 31.20 0.01534
FLOOR 2 EXAM 8 1332.12 1332.12 0.121 0.127 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:00:00 31.20 0.01534
FLOOR 2 EXAM 9 1723.76 1723.76 0.156 0.187 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:40:00 31.20 0.01534
FLOOR 2 LOUNGE 402.02 402.02 0.036 0.036 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 08:20:00 24.03 0.01534
FLOOR 2 NURSE STATION 1 645.81 645.81 0.059 0.059 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 08:20:00 24.03 0.01534
FLOOR 2 NURSE STATION 2 786.56 786.56 0.071 0.071 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 08:20:00 24.03 0.01534
FLOOR 2 OFFICE 3222.67 3222.67 0.293 0.293 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:40:00 26.57 0.01534
FLOOR 2 RECEPTION 5783.35 5783.35 0.525 0.525 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 16:10:00 30.42 0.01534
FLOOR 2 SCHEDULING 1 938.63 938.63 0.085 0.085 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 08:30:00 24.36 0.01534
FLOOR 2 SCHEDULING 2 1027.65 1027.65 0.093 0.093 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 08:20:00 24.03 0.01534
FLOOR 2 WORK 4598.53 4598.53 0.417 0.417 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:00:00 31.20 0.01534
FLOOR 2 X-RAY 9420.26 9420.26 0.855 0.855 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 18:00:00 28.66 0.01534
FLOOR 3 DRESSING ROOM 190.79 190.79 0.017 0.017 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 3 HUMID 479.64 479.64 0.044 0.044 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 3 LOCKER 747.15 747.15 0.068 0.068 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 3 LOUNGE 4355.86 4355.86 0.395 0.395 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 3 OFFICE 10623.33 10623.33 0.964 0.964 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:20:00 31.20 0.01534
FLOOR 3 PHYSICAL THERAPY 1 9159.69 9159.69 0.831 0.831 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:30:00 30.93 0.01534
FLOOR 3 PHYSICAL THERAPY 2 2942.93 2942.93 0.267 0.279 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:20:00 31.20 0.01534
FLOOR 3 TREATMENT 2511.06 2511.06 0.228 0.228 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:40:00 31.20 0.01534
FLOOR 3 WORK 3680.20 3680.20 0.334 0.334 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:40:00 26.57 0.01534
FLOOR 1 BIO HAZ 83.10 83.10 0.006 0.006 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 ELECTRICAL ROOM 597.91 597.91 0.046 0.046 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 11:10:00 28.94 0.01534
FLOOR 1 ELEVATOR PUMP ROOM 3697.74 3697.74 0.284 0.284 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 17:20:00 29.36 0.01534
FLOOR 1 IT HALL 239.18 239.18 0.018 0.018 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 LOBBY HALL 523.91 523.91 0.039 0.039 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 LOBBY TOILET 438.59 438.59 0.033 0.042 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 LOCKER ROOM HALL 752.78 752.78 0.056 0.056 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 MED GAS 194.62 194.62 0.015 0.015 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:20:00 30.85 0.01534
FLOOR 1 MRI HALL 326.20 326.20 0.024 0.024 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 MRI TOILET 140.76 140.76 0.011 0.042 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:30:00 30.88 0.01534
FLOOR 1 NURSE HALL 917.88 917.88 0.068 0.068 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 NURSE JANITOR 113.14 113.14 0.008 0.008 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 NURSE TOILET 140.40 140.40 0.011 0.042 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 PRE-OP HALL 906.39 906.39 0.067 0.067 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 PRE-OP TOILET 185.50 185.50 0.014 0.042 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 18:00:00 28.66 0.01534
FLOOR 1 RECEPTION HALL 233.57 233.57 0.017 0.017 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 SCRUB 168.63 168.63 0.013 0.013 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 07:40:00 22.76 0.01534
FLOOR 1 STERILE HALL 967.38 967.38 0.074 0.074 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:00:00 30.67 0.01534
FLOOR 1 STERILE STORAGE 534.84 534.84 0.040 0.040 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 STORAGE 1705.15 1705.15 0.131 0.131 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 16:00:00 30.56 0.01534
FLOOR 1 SUB-STERILE 761.09 761.09 0.058 0.058 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:40:00 26.57 0.01534
FLOOR 1 UTILITY HALL 665.27 665.27 0.051 0.051 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:10:00 25.67 0.01534
FLOOR 1 UTILITY JANITOR 82.86 82.86 0.006 0.006 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 1 UTILITY ROOM 861.35 861.35 0.066 0.066 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 10:00:00 27.17 0.01534
FLOOR 1 VESTIBULE 267.46 267.46 0.021 0.021 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 17:30:00 29.19 0.01534
FLOOR 2 CONFERENCE TOILET 202.81 202.81 0.018 0.050 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 EXAM HALL 1 586.42 586.42 0.053 0.053 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 18:00:00 28.66 0.01534
FLOOR 2 EXAM HALL 2 572.50 572.50 0.050 0.050 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 EXAM HALL 3 551.79 551.79 0.048 0.048 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 EXAM HALL 4 566.81 566.81 0.050 0.050 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 EXAM HALL 5 597.55 597.55 0.052 0.052 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 EXAM HALL 6 594.99 594.99 0.052 0.052 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 JANITOR 381.60 381.60 0.034 0.034 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 OFFICE HALL 1262.85 1262.85 0.111 0.111 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 RECEPTION HALL 1756.40 1756.40 0.154 0.154 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 RECEPTION TOILET 375.20 375.20 0.033 0.099 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 STORAGE 1 171.56 171.56 0.015 0.015 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 STORAGE 2 301.15 301.15 0.026 0.026 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 STORAGE 3 390.29 390.29 0.034 0.034 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 UTILITY 681.94 681.94 0.062 0.062 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:30:00 26.27 0.01534
FLOOR 2 WORK HALL 2420.02 2420.02 0.212 0.212 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 2 WORK TOILET 203.99 203.99 0.018 0.042 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 06:20:00 21.06 0.01534
FLOOR 3 ELEVATOR HALL 880.53 880.53 0.080 0.080 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:40:00 31.20 0.01534
FLOOR 3 JANITOR 202.45 202.45 0.018 0.018 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 17:30:00 29.19 0.01534
FLOOR 3 LOUNGE TOILET 730.27 730.27 0.066 0.151 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 3 MECHANICAL 3817.88 3817.88 0.346 0.346 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 09:40:00 26.57 0.01534
FLOOR 3 MECHANICAL HALL 1026.02 1026.02 0.093 0.093 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 13:00:00 30.67 0.01534
FLOOR 3 OFFICE HALL 2334.69 2334.69 0.212 0.212 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:40:00 31.20 0.01534
FLOOR 3 OFFICE TOILET 174.63 174.63 0.016 0.042 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 17:50:00 28.83 0.01534
FLOOR 3 PHYSICAL THERAPY TOILET 270.90 270.90 0.025 0.066 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 3 STORAGE 1 283.87 283.87 0.026 0.026 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:20:00 31.20 0.01534
FLOOR 3 STORAGE 2 256.65 256.65 0.023 0.023 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:30:00 31.20 0.01534
FLOOR 3 UNDEVELOPED 1 9169.21 9169.21 0.832 0.832 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:40:00 30.78 0.01534
FLOOR 3 UNDEVELOPED 2 4745.23 4745.23 0.431 0.431 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 15:30:00 30.88 0.01534
FLOOR 3 UTILITY 468.38 468.38 0.043 0.043 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:20:00 31.20 0.01534
NE STAIR 1513.03 1513.03 0.137 0.137 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 14:10:00 31.20 0.01534
NW ELEVATOR 1160.12 1160.12 0.105 0.105 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 17:50:00 28.83 0.01534
NW STAIR 1566.48 1566.48 0.142 0.142 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 16:30:00 30.14 0.01534
SW STAIR 967.88 967.88 0.088 0.088 ROCHESTER INTERNATIONAL ARPT ANN CLG .4% CONDNS DB=>MWB 7/21 16:30:00 30.14 0.01534


Zone Heating

Calculated Design Load [W] User Design Load [W] Calculated Design Air Flow [m3/s] User Design Air Flow [m3/s] Design Day Name Date/Time Of Peak Temperature at Peak [C] Humidity Ratio at Peak [kgWater/kgAir]
FLOOR 1 ANESTHESIA 433.04 433.04 0.019 0.019 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 CAFE 942.16 942.16 0.042 0.184 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 CLEAN 0.00 0.00 0.000 0.018 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 CLEAN WORK 0.00 0.00 0.000 0.023 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 DICTATION 0.00 0.00 0.000 0.005 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 DRESSING ROOM 423.56 423.56 0.019 0.019 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 HUMID 0.00 0.00 0.000 0.002 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 IT ROOM 45.48 45.48 0.002 0.004 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 LOBBY 1699.58 1699.58 0.075 0.075 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 LOCKER ROOM 206.71 206.71 0.009 0.042 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 LOUNGE 0.00 0.00 0.000 0.023 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 MRI CONTROL ROOM 0.00 0.00 0.000 0.024 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 MRI ROOM 0.00 0.00 0.000 0.062 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 NOURISHMENT 0.00 0.00 0.000 0.014 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 NURSE STATION 0.00 0.00 0.000 0.020 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 OFFICE 0.00 0.00 0.000 0.019 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 OPERATING ROOM 1 279.30 279.30 0.011 0.239 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 07:00:00 -26.20 0.00036
FLOOR 1 OPERATING ROOM 2 0.00 0.00 0.000 0.249 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 OPERATING ROOM 3 0.00 0.00 0.000 0.247 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 PACU 0.00 0.00 0.000 0.032 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 PRE-OP ROOM 1 18.13 18.13 0.001 0.052 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 07:40:00 -26.20 0.00036
FLOOR 1 PRE-OP ROOM 2 0.00 0.00 0.000 0.093 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 PROCEDURE ROOM 664.51 664.51 0.029 0.108 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 RECEPTION 459.92 459.92 0.020 0.050 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 RECOVERY ROOM 1915.14 1915.14 0.085 0.161 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 SCHEDULING 260.03 260.03 0.011 0.011 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 SOIL 0.00 0.00 0.000 0.018 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 SOIL HOLD 10.21 10.21 0.000 0.008 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 07:50:00 -26.20 0.00036
FLOOR 1 SOIL WORK 0.00 0.00 0.000 0.025 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 STEP DOWN 1514.87 1514.87 0.067 0.090 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 CONFERENCE 2230.43 2230.43 0.099 0.099 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 DICTATION 1.63 1.63 0.000 0.003 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 07:10:00 -26.20 0.00036
FLOOR 2 EXAM 1 2288.76 2288.76 0.102 0.102 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM 2 1167.10 1167.10 0.051 0.076 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM 3 1560.00 1560.00 0.069 0.102 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM 4 530.84 530.84 0.024 0.024 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM 5 1660.73 1660.73 0.074 0.074 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM 6 962.54 962.54 0.043 0.043 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM 7 1339.90 1339.90 0.059 0.112 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM 8 1079.72 1079.72 0.048 0.048 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM 9 806.64 806.64 0.035 0.056 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 LOUNGE 0.00 0.00 0.000 0.005 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 2 NURSE STATION 1 0.00 0.00 0.000 0.011 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 2 NURSE STATION 2 0.00 0.00 0.000 0.014 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 2 OFFICE 2710.04 2710.04 0.120 0.120 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 RECEPTION 3467.06 3467.06 0.153 0.153 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 SCHEDULING 1 0.00 0.00 0.000 0.013 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 2 SCHEDULING 2 0.00 0.00 0.000 0.014 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 2 WORK 2246.05 2246.05 0.099 0.099 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 X-RAY 0.00 0.00 0.000 0.127 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 3 DRESSING ROOM 190.15 190.15 0.008 0.008 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 HUMID 432.98 432.98 0.019 0.019 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 LOCKER 487.26 487.26 0.022 0.022 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 LOUNGE 1664.08 1664.08 0.073 0.073 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 OFFICE 8364.74 8364.74 0.368 0.368 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 PHYSICAL THERAPY 1 5888.13 5888.13 0.261 0.261 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 PHYSICAL THERAPY 2 2198.48 2198.48 0.097 0.097 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 TREATMENT 1658.25 1658.25 0.073 0.073 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 WORK 2774.89 2774.89 0.123 0.123 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 BIO HAZ 126.85 126.85 0.006 0.006 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 ELECTRICAL ROOM 157.30 157.30 0.007 0.007 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 ELEVATOR PUMP ROOM 619.18 619.18 0.028 0.028 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 IT HALL 56.72 56.72 0.003 0.004 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 LOBBY HALL 52.00 52.00 0.002 0.007 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 LOBBY TOILET 306.55 306.55 0.014 0.014 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 LOCKER ROOM HALL 0.00 0.00 0.000 0.014 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 MED GAS 653.42 653.42 0.029 0.029 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 MRI HALL 79.11 79.11 0.004 0.004 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 MRI TOILET 243.88 243.88 0.011 0.011 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 NURSE HALL 257.98 257.98 0.012 0.014 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 NURSE JANITOR 0.00 0.00 0.000 0.003 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 PRE-OP HALL 38.20 38.20 0.002 0.015 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 PRE-OP TOILET 287.70 287.70 0.013 0.013 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 RECEPTION HALL 5.48 5.48 0.000 0.004 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 07:40:00 -26.20 0.00036
FLOOR 1 SCRUB 134.54 134.54 0.006 0.006 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 STERILE HALL 573.25 573.25 0.026 0.026 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 STERILE STORAGE 0.00 0.00 0.000 0.022 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB   -26.20 0.00036
FLOOR 1 STORAGE 4313.70 4313.70 0.191 0.191 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 SUB-STERILE 881.14 881.14 0.039 0.039 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 UTILITY HALL 1324.25 1324.25 0.059 0.059 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 UTILITY JANITOR 71.39 71.39 0.003 0.003 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 UTILITY ROOM 1367.39 1367.39 0.061 0.061 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 1 VESTIBULE 406.47 406.47 0.018 0.018 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 CONFERENCE TOILET 116.07 116.07 0.005 0.005 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM HALL 1 501.04 501.04 0.022 0.022 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM HALL 2 376.07 376.07 0.017 0.017 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM HALL 3 364.63 364.63 0.016 0.016 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM HALL 4 301.08 301.08 0.013 0.013 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM HALL 5 310.14 310.14 0.014 0.014 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 EXAM HALL 6 356.70 356.70 0.016 0.016 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 JANITOR 664.11 664.11 0.030 0.030 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 OFFICE HALL 771.80 771.80 0.034 0.034 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 RECEPTION HALL 51.75 51.75 0.002 0.016 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 RECEPTION TOILET 115.65 115.65 0.005 0.005 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 STORAGE 1 107.34 107.34 0.005 0.005 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 STORAGE 2 148.86 148.86 0.007 0.007 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 STORAGE 3 178.23 178.23 0.008 0.008 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 UTILITY 753.15 753.15 0.033 0.033 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 WORK HALL 325.61 325.61 0.015 0.024 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 2 WORK TOILET 366.51 366.51 0.016 0.016 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 ELEVATOR HALL 1239.11 1239.11 0.055 0.055 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 JANITOR 556.91 556.91 0.025 0.025 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 LOUNGE TOILET 1043.67 1043.67 0.046 0.046 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 MECHANICAL 856.84 856.84 0.038 0.038 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 MECHANICAL HALL 1623.77 1623.77 0.072 0.072 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 OFFICE HALL 2802.39 2802.39 0.124 0.124 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 OFFICE TOILET 352.60 352.60 0.016 0.016 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 PHYSICAL THERAPY TOILET 367.69 367.69 0.016 0.016 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 STORAGE 1 543.33 543.33 0.024 0.024 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 STORAGE 2 464.18 464.18 0.021 0.021 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 UNDEVELOPED 1 7387.61 7387.61 0.326 0.326 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 UNDEVELOPED 2 4685.46 4685.46 0.207 0.207 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
FLOOR 3 UTILITY 971.72 971.72 0.043 0.043 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
NE STAIR 4064.21 4064.21 0.181 0.181 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
NW ELEVATOR 2535.10 2535.10 0.113 0.113 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
NW STAIR 4206.85 4206.85 0.187 0.187 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036
SW STAIR 1962.02 1962.02 0.087 0.087 ROCHESTER INTERNATIONAL ARPT ANN HTG 99.6% CONDNS DB 1/21 08:20:00 -26.20 0.00036


System Design Air Flow Rates

Calculated cooling [m3/s] User cooling [m3/s] Calculated heating [m3/s] User heating [m3/s]
AHU-1 7.24 7.24 2.53 2.53
AHU-2 10.76 10.76 4.20 4.20



Table of Contents

Report: System Summary

For: Entire Facility

Timestamp: 2018-10-19 19:11:00

Economizer

High Limit Shutoff Control Minimum Outdoor Air [m3/s] Maximum Outdoor Air [m3/s] Return Air Temp Limit Return Air Enthalpy Limit Outdoor Air Temperature Limit [C] Outdoor Air Enthalpy Limit [C]
AHU-2_OA_CONTROLLER DifferentialDryBulb 0.00 10.76 -      


Demand Controlled Ventilation using Controller:MechanicalVentilation

Controller:MechanicalVentilation Name Outdoor Air Per Person [m3/s-person] Outdoor Air Per Area [m3/s-m2] Air Distribution Effectiveness in Cooling Mode Air Distribution Effectiveness in Heating Mode Air Distribution Effectiveness Schedule
FLOOR 2 CONFERENCE AHU-2_DCV 0.000000 0.001575 1.00 1.00 Constant-0.0
FLOOR 2 DICTATION AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 1 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 2 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 3 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 4 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 5 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 6 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 7 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 8 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 EXAM 9 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 2 LOUNGE AHU-2_DCV 0.000000 0.000686 1.00 1.00 Constant-0.0
FLOOR 2 NURSE STATION 1 AHU-2_DCV 0.000000 0.000813 1.00 1.00 Constant-0.0
FLOOR 2 NURSE STATION 2 AHU-2_DCV 0.000000 0.000813 1.00 1.00 Constant-0.0
FLOOR 2 OFFICE AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 2 RECEPTION AHU-2_DCV 0.000000 0.001067 1.00 1.00 Constant-0.0
FLOOR 2 SCHEDULING 1 AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 2 SCHEDULING 2 AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 2 WORK AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 2 X-RAY AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 3 DRESSING ROOM AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 3 HUMID AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 3 LOCKER AHU-2_DCV 0.000000 0.000686 1.00 1.00 Constant-0.0
FLOOR 3 LOUNGE AHU-2_DCV 0.000000 0.000686 1.00 1.00 Constant-0.0
FLOOR 3 OFFICE AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 3 PHYSICAL THERAPY 1 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 3 PHYSICAL THERAPY 2 AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 3 TREATMENT AHU-2_DCV 0.000000 0.001524 1.00 1.00 Constant-0.0
FLOOR 3 WORK AHU-2_DCV 0.000000 0.000432 1.00 1.00 Constant-0.0
FLOOR 2 CONFERENCE TOILET AHU-2_DCV 0.000000 0.000000 1.00 1.00 Constant-0.0
FLOOR 2 EXAM HALL 1 AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 EXAM HALL 2 AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 EXAM HALL 3 AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 EXAM HALL 4 AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 EXAM HALL 5 AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 EXAM HALL 6 AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 JANITOR AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 2 OFFICE HALL AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 RECEPTION HALL AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 RECEPTION TOILET AHU-2_DCV 0.000000 0.000000 1.00 1.00 Constant-0.0
FLOOR 2 STORAGE 1 AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 2 STORAGE 2 AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 2 STORAGE 3 AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 2 UTILITY AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 2 WORK HALL AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 2 WORK TOILET AHU-2_DCV 0.000000 0.000000 1.00 1.00 Constant-0.0
FLOOR 3 ELEVATOR HALL AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 3 JANITOR AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 3 LOUNGE TOILET AHU-2_DCV 0.000000 0.000000 1.00 1.00 Constant-0.0
FLOOR 3 MECHANICAL AHU-2_DCV 0.000000 0.000000 1.00 1.00 Constant-0.0
FLOOR 3 MECHANICAL HALL AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 3 OFFICE HALL AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
FLOOR 3 OFFICE TOILET AHU-2_DCV 0.000000 0.000000 1.00 1.00 Constant-0.0
FLOOR 3 PHYSICAL THERAPY TOILET AHU-2_DCV 0.000000 0.000000 1.00 1.00 Constant-0.0
FLOOR 3 STORAGE 1 AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 3 STORAGE 2 AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 3 UNDEVELOPED 1 AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 3 UNDEVELOPED 2 AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
FLOOR 3 UTILITY AHU-2_DCV 0.000000 0.000610 1.00 1.00 Constant-0.0
NE STAIR AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
NW ELEVATOR AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
NW STAIR AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0
SW STAIR AHU-2_DCV 0.000000 0.000305 1.00 1.00 Constant-0.0


Time Not Comfortable Based on Simple ASHRAE 55-2004

Winter Clothes [hr] Summer Clothes [hr] Summer or Winter Clothes [hr]
FLOOR 1 ANESTHESIA 4271.50 7828.67 4271.50
FLOOR 1 CAFE 956.00 7696.33 942.00
FLOOR 1 CLEAN 1037.83 7830.00 1037.83
FLOOR 1 CLEAN WORK 2142.67 7830.00 2142.67
FLOOR 1 DICTATION 159.17 7830.00 159.17
FLOOR 1 DRESSING ROOM 3726.17 7830.00 3726.17
FLOOR 1 HUMID 15.67 7830.00 15.67
FLOOR 1 IT ROOM 811.50 7830.00 811.50
FLOOR 1 LOBBY 1289.00 7827.83 1288.67
FLOOR 1 LOCKER ROOM 253.83 7828.83 253.83
FLOOR 1 LOUNGE 64.50 7830.00 64.50
FLOOR 1 MRI CONTROL ROOM 251.67 7823.50 247.50
FLOOR 1 MRI ROOM 5.33 7825.17 1.67
FLOOR 1 NOURISHMENT 19.67 7830.00 19.67
FLOOR 1 NURSE STATION 142.33 7830.00 142.33
FLOOR 1 OFFICE 132.33 7830.00 132.33
FLOOR 1 OPERATING ROOM 1 3920.50 7830.00 3920.50
FLOOR 1 OPERATING ROOM 2 3695.17 7830.00 3695.17
FLOOR 1 OPERATING ROOM 3 6649.83 7830.00 6649.83
FLOOR 1 PACU 3236.67 7830.00 3236.67
FLOOR 1 PRE-OP ROOM 1 4418.00 7830.00 4418.00
FLOOR 1 PRE-OP ROOM 2 3535.00 7830.00 3535.00
FLOOR 1 PROCEDURE ROOM 4338.33 7830.00 4338.33
FLOOR 1 RECEPTION 321.50 7826.83 321.50
FLOOR 1 RECOVERY ROOM 3934.00 7822.17 3931.00
FLOOR 1 SCHEDULING 1046.67 7830.00 1046.67
FLOOR 1 SOIL 4210.33 7830.00 4210.33
FLOOR 1 SOIL HOLD 4546.83 7830.00 4546.83
FLOOR 1 SOIL WORK 4395.00 7830.00 4395.00
FLOOR 1 STEP DOWN 3824.50 7817.17 3821.00
FLOOR 2 CONFERENCE 2698.00 7753.17 2694.67
FLOOR 2 DICTATION 1024.00 7830.00 1024.00
FLOOR 2 EXAM 1 4020.83 7774.83 4020.17
FLOOR 2 EXAM 2 3819.67 7830.00 3819.67
FLOOR 2 EXAM 3 4003.17 7830.00 4003.17
FLOOR 2 EXAM 4 3754.83 7828.17 3754.83
FLOOR 2 EXAM 5 3580.00 7830.00 3580.00
FLOOR 2 EXAM 6 4455.17 7830.00 4455.17
FLOOR 2 EXAM 7 4106.33 7830.00 4106.33
FLOOR 2 EXAM 8 4069.83 7830.00 4069.83
FLOOR 2 EXAM 9 3726.83 7830.00 3726.83
FLOOR 2 LOUNGE 584.67 7830.00 584.67
FLOOR 2 NURSE STATION 1 713.67 7830.00 713.67
FLOOR 2 NURSE STATION 2 705.17 7830.00 705.17
FLOOR 2 OFFICE 2894.50 7830.00 2894.50
FLOOR 2 RECEPTION 2157.83 7826.67 2155.83
FLOOR 2 SCHEDULING 1 431.50 7830.00 431.50
FLOOR 2 SCHEDULING 2 548.67 7830.00 548.67
FLOOR 2 WORK 1349.67 7830.00 1349.67
FLOOR 2 X-RAY 22.67 7347.67 1.33
FLOOR 3 DRESSING ROOM 2402.50 7830.00 2402.50
FLOOR 3 HUMID 2079.67 7830.00 2079.67
FLOOR 3 LOCKER 1770.00 7830.00 1770.00
FLOOR 3 LOUNGE 1671.00 7826.17 1668.17
FLOOR 3 OFFICE 2622.00 7827.33 2622.00
FLOOR 3 PHYSICAL THERAPY 1 4451.33 7589.67 4437.67
FLOOR 3 PHYSICAL THERAPY 2 4267.00 7830.00 4267.00
FLOOR 3 TREATMENT 3704.83 7829.33 3704.83
FLOOR 3 WORK 3224.33 7782.00 3224.33
FLOOR 1 BIO HAZ 0.00 0.00 0.00
FLOOR 1 ELECTRICAL ROOM 0.00 0.00 0.00
FLOOR 1 ELEVATOR PUMP ROOM 0.00 0.00 0.00
FLOOR 1 IT HALL 0.00 0.00 0.00
FLOOR 1 LOBBY HALL 0.00 0.00 0.00
FLOOR 1 LOBBY TOILET 0.00 0.00 0.00
FLOOR 1 LOCKER ROOM HALL 0.00 0.00 0.00
FLOOR 1 MED GAS 0.00 0.00 0.00
FLOOR 1 MRI HALL 0.00 0.00 0.00
FLOOR 1 MRI TOILET 0.00 0.00 0.00
FLOOR 1 NURSE HALL 0.00 0.00 0.00
FLOOR 1 NURSE JANITOR 0.00 0.00 0.00
FLOOR 1 NURSE TOILET 0.00 0.00 0.00
FLOOR 1 PRE-OP HALL 0.00 0.00 0.00
FLOOR 1 PRE-OP TOILET 0.00 0.00 0.00
FLOOR 1 RECEPTION HALL 0.00 0.00 0.00
FLOOR 1 SCRUB 0.00 0.00 0.00
FLOOR 1 STERILE HALL 0.00 0.00 0.00
FLOOR 1 STERILE STORAGE 0.00 0.00 0.00
FLOOR 1 STORAGE 0.00 0.00 0.00
FLOOR 1 SUB-STERILE 0.00 0.00 0.00
FLOOR 1 UTILITY HALL 0.00 0.00 0.00
FLOOR 1 UTILITY JANITOR 0.00 0.00 0.00
FLOOR 1 UTILITY ROOM 0.00 0.00 0.00
FLOOR 1 VESTIBULE 0.00 0.00 0.00
FLOOR 2 CONFERENCE TOILET 0.00 0.00 0.00
FLOOR 2 EXAM HALL 1 0.00 0.00 0.00
FLOOR 2 EXAM HALL 2 0.00 0.00 0.00
FLOOR 2 EXAM HALL 3 0.00 0.00 0.00
FLOOR 2 EXAM HALL 4 0.00 0.00 0.00
FLOOR 2 EXAM HALL 5 0.00 0.00 0.00
FLOOR 2 EXAM HALL 6 0.00 0.00 0.00
FLOOR 2 JANITOR 0.00 0.00 0.00
FLOOR 2 OFFICE HALL 0.00 0.00 0.00
FLOOR 2 RECEPTION HALL 0.00 0.00 0.00
FLOOR 2 RECEPTION TOILET 0.00 0.00 0.00
FLOOR 2 STORAGE 1 0.00 0.00 0.00
FLOOR 2 STORAGE 2 0.00 0.00 0.00
FLOOR 2 STORAGE 3 0.00 0.00 0.00
FLOOR 2 UTILITY 0.00 0.00 0.00
FLOOR 2 WORK HALL 0.00 0.00 0.00
FLOOR 2 WORK TOILET 0.00 0.00 0.00
FLOOR 3 ELEVATOR HALL 0.00 0.00 0.00
FLOOR 3 JANITOR 0.00 0.00 0.00
FLOOR 3 LOUNGE TOILET 0.00 0.00 0.00
FLOOR 3 MECHANICAL 0.00 0.00 0.00
FLOOR 3 MECHANICAL HALL 0.00 0.00 0.00
FLOOR 3 OFFICE HALL 0.00 0.00 0.00
FLOOR 3 OFFICE TOILET 0.00 0.00 0.00
FLOOR 3 PHYSICAL THERAPY TOILET 0.00 0.00 0.00
FLOOR 3 STORAGE 1 0.00 0.00 0.00
FLOOR 3 STORAGE 2 0.00 0.00 0.00
FLOOR 3 UNDEVELOPED 1 0.00 0.00 0.00
FLOOR 3 UNDEVELOPED 2 0.00 0.00 0.00
FLOOR 3 UTILITY 0.00 0.00 0.00
NE STAIR 0.00 0.00 0.00
NW ELEVATOR 0.00 0.00 0.00
NW STAIR 0.00 0.00 0.00
SW STAIR 0.00 0.00 0.00
Facility 7497.17 7830.00 7485.50
Aggregated over the RunPeriods for Weather

Time Setpoint Not Met

During Heating [hr] During Cooling [hr] During Occupied Heating [hr] During Occupied Cooling [hr]
FLOOR 1 ANESTHESIA 30.17 10.00 30.17 10.00
FLOOR 1 CAFE 7.50 281.83 7.50 281.83
FLOOR 1 CLEAN 0.00 311.33 0.00 311.33
FLOOR 1 CLEAN WORK 2.00 19.17 2.00 19.17
FLOOR 1 DICTATION 0.00 0.00 0.00 0.00
FLOOR 1 DRESSING ROOM 80.50 0.00 80.50 0.00
FLOOR 1 HUMID 0.00 0.67 0.00 0.67
FLOOR 1 IT ROOM 0.17 0.50 0.17 0.50
FLOOR 1 LOBBY 13.17 2.33 13.17 2.33
FLOOR 1 LOCKER ROOM 0.00 7.00 0.00 7.00
FLOOR 1 LOUNGE 0.00 150.17 0.00 150.17
FLOOR 1 MRI CONTROL ROOM 0.00 79.50 0.00 79.50
FLOOR 1 MRI ROOM 0.00 496.00 0.00 496.00
FLOOR 1 NOURISHMENT 0.00 133.67 0.00 133.67
FLOOR 1 NURSE STATION 0.00 15.50 0.00 15.50
FLOOR 1 OFFICE 0.00 3.50 0.00 3.50
FLOOR 1 OPERATING ROOM 1 5.00 1463.00 5.00 1460.83
FLOOR 1 OPERATING ROOM 2 1.50 1541.83 1.50 1538.00
FLOOR 1 OPERATING ROOM 3 0.00 1642.00 0.00 1642.00
FLOOR 1 PACU 3.33 0.00 3.33 0.00
FLOOR 1 PRE-OP ROOM 1 62.33 0.00 62.33 0.00
FLOOR 1 PRE-OP ROOM 2 5.17 0.00 5.17 0.00
FLOOR 1 PROCEDURE ROOM 33.50 0.00 33.50 0.00
FLOOR 1 RECEPTION 0.00 32.50 0.00 32.50
FLOOR 1 RECOVERY ROOM 24.83 29.83 24.83 29.83
FLOOR 1 SCHEDULING 0.67 3.17 0.67 3.17
FLOOR 1 SOIL 7.33 0.00 7.33 0.00
FLOOR 1 SOIL HOLD 17.67 0.00 17.67 0.00
FLOOR 1 SOIL WORK 9.33 0.00 9.33 0.00
FLOOR 1 STEP DOWN 34.33 6.33 34.33 6.33
FLOOR 2 CONFERENCE 0.00 20.00 0.00 20.00
FLOOR 2 DICTATION 0.33 0.00 0.33 0.00
FLOOR 2 EXAM 1 0.00 0.83 0.00 0.83
FLOOR 2 EXAM 2 0.00 0.00 0.00 0.00
FLOOR 2 EXAM 3 0.00 0.00 0.00 0.00
FLOOR 2 EXAM 4 0.00 20.17 0.00 20.17
FLOOR 2 EXAM 5 0.00 0.00 0.00 0.00
FLOOR 2 EXAM 6 0.00 0.00 0.00 0.00
FLOOR 2 EXAM 7 0.00 0.00 0.00 0.00
FLOOR 2 EXAM 8 0.00 0.00 0.00 0.00
FLOOR 2 EXAM 9 0.00 0.00 0.00 0.00
FLOOR 2 LOUNGE 0.00 0.00 0.00 0.00
FLOOR 2 NURSE STATION 1 0.00 2.83 0.00 2.83
FLOOR 2 NURSE STATION 2 0.00 4.50 0.00 4.50
FLOOR 2 OFFICE 0.33 0.00 0.33 0.00
FLOOR 2 RECEPTION 0.00 3.50 0.00 3.50
FLOOR 2 SCHEDULING 1 0.00 0.00 0.00 0.00
FLOOR 2 SCHEDULING 2 0.00 0.00 0.00 0.00
FLOOR 2 WORK 2.00 0.00 2.00 0.00
FLOOR 2 X-RAY 0.00 1719.83 0.00 1719.83
FLOOR 3 DRESSING ROOM 0.00 0.00 0.00 0.00
FLOOR 3 HUMID 0.00 0.00 0.00 0.00
FLOOR 3 LOCKER 0.00 3.33 0.00 3.33
FLOOR 3 LOUNGE 0.67 4.00 0.67 4.00
FLOOR 3 OFFICE 4.17 3.50 4.17 3.50
FLOOR 3 PHYSICAL THERAPY 1 0.00 21.17 0.00 21.17
FLOOR 3 PHYSICAL THERAPY 2 0.00 0.00 0.00 0.00
FLOOR 3 TREATMENT 0.00 2.83 0.00 2.83
FLOOR 3 WORK 2.17 0.00 2.17 0.00
FLOOR 1 BIO HAZ 93.33 0.00 0.00 0.00
FLOOR 1 ELECTRICAL ROOM 1.17 4.83 0.00 0.00
FLOOR 1 ELEVATOR PUMP ROOM 12.67 380.67 0.00 0.00
FLOOR 1 IT HALL 2.17 0.00 0.00 0.00
FLOOR 1 LOBBY HALL 0.00 4.00 0.00 0.00
FLOOR 1 LOBBY TOILET 47.00 0.00 0.00 0.00
FLOOR 1 LOCKER ROOM HALL 0.00 0.00 0.00 0.00
FLOOR 1 MED GAS 213.83 0.00 0.00 0.00
FLOOR 1 MRI HALL 0.33 0.00 0.00 0.00
FLOOR 1 MRI TOILET 76.67 0.00 0.00 0.00
FLOOR 1 NURSE HALL 0.67 0.00 0.00 0.00
FLOOR 1 NURSE JANITOR 0.00 0.00 0.00 0.00
FLOOR 1 NURSE TOILET 54.33 0.00 0.00 0.00
FLOOR 1 PRE-OP HALL 0.50 0.00 0.00 0.00
FLOOR 1 PRE-OP TOILET 76.67 0.00 0.00 0.00
FLOOR 1 RECEPTION HALL 0.00 0.00 0.00 0.00
FLOOR 1 SCRUB 2.50 0.00 0.00 0.00
FLOOR 1 STERILE HALL 3.67 2.50 0.00 0.00
FLOOR 1 STERILE STORAGE 0.00 0.00 0.00 0.00
FLOOR 1 STORAGE 244.33 0.00 0.00 0.00
FLOOR 1 SUB-STERILE 18.17 0.00 0.00 0.00
FLOOR 1 UTILITY HALL 151.00 0.00 0.00 0.00
FLOOR 1 UTILITY JANITOR 6.33 0.00 0.00 0.00
FLOOR 1 UTILITY ROOM 50.83 0.00 0.00 0.00
FLOOR 1 VESTIBULE 3049.00 493.67 0.00 0.00
FLOOR 2 CONFERENCE TOILET 0.00 0.00 0.00 0.00
FLOOR 2 EXAM HALL 1 2.00 0.00 0.00 0.00
FLOOR 2 EXAM HALL 2 4.00 0.00 0.00 0.00
FLOOR 2 EXAM HALL 3 4.67 0.00 0.00 0.00
FLOOR 2 EXAM HALL 4 10.33 0.00 0.00 0.00
FLOOR 2 EXAM HALL 5 8.50 0.00 0.00 0.00
FLOOR 2 EXAM HALL 6 6.83 0.00 0.00 0.00
FLOOR 2 JANITOR 3.00 0.00 0.00 0.00
FLOOR 2 OFFICE HALL 5.83 0.00 0.00 0.00
FLOOR 2 RECEPTION HALL 1.67 0.00 0.00 0.00
FLOOR 2 RECEPTION TOILET 0.00 0.00 0.00 0.00
FLOOR 2 STORAGE 1 6.00 0.00 0.00 0.00
FLOOR 2 STORAGE 2 3.00 0.00 0.00 0.00
FLOOR 2 STORAGE 3 3.00 0.00 0.00 0.00
FLOOR 2 UTILITY 0.67 0.00 0.00 0.00
FLOOR 2 WORK HALL 2.33 0.00 0.00 0.00
FLOOR 2 WORK TOILET 0.00 0.00 0.00 0.00
FLOOR 3 ELEVATOR HALL 10.50 2.50 0.00 0.00
FLOOR 3 JANITOR 162.33 0.00 0.00 0.00
FLOOR 3 LOUNGE TOILET 0.00 0.00 0.00 0.00
FLOOR 3 MECHANICAL 0.00 4969.67 0.00 0.00
FLOOR 3 MECHANICAL HALL 0.33 0.50 0.00 0.00
FLOOR 3 OFFICE HALL 3.17 2.83 0.00 0.00
FLOOR 3 OFFICE TOILET 0.00 0.00 0.00 0.00
FLOOR 3 PHYSICAL THERAPY TOILET 0.00 0.00 0.00 0.00
FLOOR 3 STORAGE 1 0.17 0.00 0.00 0.00
FLOOR 3 STORAGE 2 6.83 0.00 0.00 0.00
FLOOR 3 UNDEVELOPED 1 6.33 3.17 0.00 0.00
FLOOR 3 UNDEVELOPED 2 4.50 3.50 0.00 0.00
FLOOR 3 UTILITY 18.50 0.00 0.00 0.00
NE STAIR 148.33 0.00 0.00 0.00
NW ELEVATOR 116.83 0.83 0.00 0.00
NW STAIR 196.67 0.00 0.00 0.00
SW STAIR 93.00 6.67 0.00 0.00
Facility 3060.00 6993.33 93.50 2144.67
Aggregated over the RunPeriods for Weather


Table of Contents

Report: Component Sizing Summary

For: Entire Facility

Timestamp: 2018-10-19 19:11:00

AirTerminal:SingleDuct:VAV:Reheat

Maximum Air Flow Rate [m3/s] Maximum Reheat Water Flow Rate [m3/s] Reheat Coil Sizing Air Volume Flow Rate [m3/s]
FLOOR 1 ANESTHESIA VAV BOX COMPONENT 0.067956 0.000042 0.067956
FLOOR 1 BIO HAZ VAV BOX COMPONENT 0.006269 0.000003 0.005638
FLOOR 1 CAFE VAV BOX COMPONENT 0.316840 0.000039 0.063368
FLOOR 1 CLEAN VAV BOX COMPONENT 0.042300 0.000026 0.042300
FLOOR 1 CLEAN WORK VAV BOX COMPONENT 0.052783 0.000032 0.052783
FLOOR 1 DICTATION VAV BOX COMPONENT 0.025549 0.000003 0.005110
FLOOR 1 DRESSING ROOM VAV BOX COMPONENT 0.018861 0.000012 0.018861
FLOOR 1 ELECTRICAL ROOM VAV BOX COMPONENT 0.045954 0.000006 0.009191
FLOOR 1 ELEVATOR PUMP ROOM VAV BOX COMPONENT 0.284221 0.000035 0.056844
FLOOR 1 HUMID VAV BOX COMPONENT 0.012527 0.000002 0.002505
FLOOR 1 IT HALL VAV BOX COMPONENT 0.017975 0.000002 0.003595
FLOOR 1 IT ROOM VAV BOX COMPONENT 0.020714 0.000003 0.004143
FLOOR 1 LOBBY VAV BOX COMPONENT 0.282518 0.000046 0.075055
FLOOR 1 LOBBY HALL VAV BOX COMPONENT 0.038797 0.000005 0.007759
FLOOR 1 LOBBY TOILET VAV BOX COMPONENT 0.042473 0.000026 0.042473
FLOOR 1 LOCKER ROOM VAV BOX COMPONENT 0.231303 0.000028 0.046261
FLOOR 1 LOCKER ROOM HALL VAV BOX COMPONENT 0.056191 0.000007 0.011238
FLOOR 1 LOUNGE VAV BOX COMPONENT 0.115982 0.000014 0.023196
FLOOR 1 MED GAS VAV BOX COMPONENT 0.029076 0.000018 0.029076
FLOOR 1 MRI CONTROL ROOM VAV BOX COMPONENT 0.158564 0.000020 0.031713
FLOOR 1 MRI HALL VAV BOX COMPONENT 0.024302 0.000003 0.004860
FLOOR 1 MRI ROOM VAV BOX COMPONENT 0.415288 0.000051 0.083058
FLOOR 1 MRI TOILET VAV BOX COMPONENT 0.042473 0.000026 0.042473
FLOOR 1 NOURISHMENT VAV BOX COMPONENT 0.056990 0.000007 0.011398
FLOOR 1 NURSE HALL VAV BOX COMPONENT 0.068298 0.000008 0.013660
FLOOR 1 NURSE JANITOR VAV BOX COMPONENT 0.008497 0.000001 0.001699
FLOOR 1 NURSE STATION VAV BOX COMPONENT 0.076648 0.000009 0.015330
FLOOR 1 NURSE TOILET VAV BOX COMPONENT 0.042473 0.000026 0.042473
FLOOR 1 OFFICE VAV BOX COMPONENT 0.082917 0.000010 0.016583
FLOOR 1 OPERATING ROOM 1 VAV BOX COMPONENT 0.799319 0.000295 0.479591
FLOOR 1 OPERATING ROOM 2 VAV BOX COMPONENT 0.830259 0.000307 0.498156
FLOOR 1 OPERATING ROOM 3 VAV BOX COMPONENT 0.748776 0.000461 0.748776
FLOOR 1 PACU VAV BOX COMPONENT 0.050967 0.000031 0.050967
FLOOR 1 PRE-OP HALL VAV BOX COMPONENT 0.067489 0.000008 0.013498
FLOOR 1 PRE-OP ROOM 1 VAV BOX COMPONENT 0.089192 0.000055 0.089192
FLOOR 1 PRE-OP ROOM 2 VAV BOX COMPONENT 0.159508 0.000098 0.159508
FLOOR 1 PRE-OP TOILET VAV BOX COMPONENT 0.042473 0.000026 0.042473
FLOOR 1 PROCEDURE ROOM VAV BOX COMPONENT 0.336241 0.000207 0.336241
FLOOR 1 RECEPTION VAV BOX COMPONENT 0.178333 0.000022 0.035667
FLOOR 1 RECEPTION HALL VAV BOX COMPONENT 0.017455 0.000002 0.003491
FLOOR 1 RECOVERY ROOM VAV BOX COMPONENT 0.294820 0.000158 0.256494
FLOOR 1 SCHEDULING VAV BOX COMPONENT 0.029704 0.000007 0.011456
FLOOR 1 SCRUB VAV BOX COMPONENT 0.012960 0.000004 0.005996
FLOOR 1 SOIL VAV BOX COMPONENT 0.099103 0.000061 0.099103
FLOOR 1 SOIL HOLD VAV BOX COMPONENT 0.044046 0.000027 0.044046
FLOOR 1 SOIL WORK VAV BOX COMPONENT 0.141575 0.000087 0.141575
FLOOR 1 STEP DOWN VAV BOX COMPONENT 0.180943 0.000077 0.124851
FLOOR 1 STERILE HALL VAV BOX COMPONENT 0.074345 0.000016 0.025514
FLOOR 1 STERILE STORAGE VAV BOX COMPONENT 0.039919 0.000005 0.007984
FLOOR 1 STORAGE VAV BOX COMPONENT 0.191150 0.000118 0.191150
FLOOR 1 SUB-STERILE VAV BOX COMPONENT 0.058496 0.000024 0.039104
FLOOR 1 UTILITY HALL VAV BOX COMPONENT 0.058774 0.000036 0.058774
FLOOR 1 UTILITY JANITOR VAV BOX COMPONENT 0.006253 0.000002 0.003188
FLOOR 1 UTILITY ROOM VAV BOX COMPONENT 0.066200 0.000037 0.060577
FLOOR 1 VESTIBULE VAV BOX COMPONENT 0.020557 0.000011 0.018059
FLOOR 2 CONFERENCE VAV BOX COMPONENT 0.271606    
FLOOR 2 CONFERENCE TOILET VAV BOX COMPONENT 0.050338    
FLOOR 2 DICTATION VAV BOX COMPONENT 0.022256    
FLOOR 2 EXAM 1 VAV BOX COMPONENT 0.274270    
FLOOR 2 EXAM 2 VAV BOX COMPONENT 0.254836    
FLOOR 2 EXAM 3 VAV BOX COMPONENT 0.339781    
FLOOR 2 EXAM 4 VAV BOX COMPONENT 0.058732    
FLOOR 2 EXAM 5 VAV BOX COMPONENT 0.228172    
FLOOR 2 EXAM 6 VAV BOX COMPONENT 0.106182    
FLOOR 2 EXAM 7 VAV BOX COMPONENT 0.373759    
FLOOR 2 EXAM 8 VAV BOX COMPONENT 0.127418    
FLOOR 2 EXAM 9 VAV BOX COMPONENT 0.186879    
FLOOR 2 EXAM HALL 1 VAV BOX COMPONENT 0.053218    
FLOOR 2 EXAM HALL 2 VAV BOX COMPONENT 0.050141    
FLOOR 2 EXAM HALL 3 VAV BOX COMPONENT 0.048360    
FLOOR 2 EXAM HALL 4 VAV BOX COMPONENT 0.049661    
FLOOR 2 EXAM HALL 5 VAV BOX COMPONENT 0.052415    
FLOOR 2 EXAM HALL 6 VAV BOX COMPONENT 0.052175    
FLOOR 2 JANITOR VAV BOX COMPONENT 0.033570    
FLOOR 2 LOUNGE VAV BOX COMPONENT 0.036489    
FLOOR 2 NURSE STATION 1 VAV BOX COMPONENT 0.058620    
FLOOR 2 NURSE STATION 2 VAV BOX COMPONENT 0.071396    
FLOOR 2 OFFICE VAV BOX COMPONENT 0.292514    
FLOOR 2 OFFICE HALL VAV BOX COMPONENT 0.110641    
FLOOR 2 RECEPTION VAV BOX COMPONENT 0.525108    
FLOOR 2 RECEPTION HALL VAV BOX COMPONENT 0.153722    
FLOOR 2 RECEPTION TOILET VAV BOX COMPONENT 0.099103    
FLOOR 2 SCHEDULING 1 VAV BOX COMPONENT 0.085186    
FLOOR 2 SCHEDULING 2 VAV BOX COMPONENT 0.093265    
FLOOR 2 STORAGE 1 VAV BOX COMPONENT 0.015071    
FLOOR 2 STORAGE 2 VAV BOX COMPONENT 0.026379    
FLOOR 2 STORAGE 3 VAV BOX COMPONENT 0.034156    
FLOOR 2 UTILITY VAV BOX COMPONENT 0.061893    
FLOOR 2 WORK VAV BOX COMPONENT 0.417364    
FLOOR 2 WORK HALL VAV BOX COMPONENT 0.211713    
FLOOR 2 WORK TOILET VAV BOX COMPONENT 0.042473    
FLOOR 2 X-RAY VAV BOX COMPONENT 0.855107    
FLOOR 3 DRESSING ROOM VAV BOX COMPONENT 0.017318    
FLOOR 3 ELEVATOR HALL VAV BOX COMPONENT 0.079908    
FLOOR 3 HUMID VAV BOX COMPONENT 0.043537    
FLOOR 3 JANITOR VAV BOX COMPONENT 0.024766    
FLOOR 3 LOCKER VAV BOX COMPONENT 0.067828    
FLOOR 3 LOUNGE VAV BOX COMPONENT 0.395380    
FLOOR 3 LOUNGE TOILET VAV BOX COMPONENT 0.151014    
FLOOR 3 MECHANICAL VAV BOX COMPONENT 0.346476    
FLOOR 3 MECHANICAL HALL VAV BOX COMPONENT 0.093128    
FLOOR 3 OFFICE VAV BOX COMPONENT 0.964144    
FLOOR 3 OFFICE HALL VAV BOX COMPONENT 0.211873    
FLOOR 3 OFFICE TOILET VAV BOX COMPONENT 0.042473    
FLOOR 3 PHYSICAL THERAPY 1 VAV BOX COMPONENT 0.831479    
FLOOR 3 PHYSICAL THERAPY 2 VAV BOX COMPONENT 0.279375    
FLOOR 3 PHYSICAL THERAPY TOILET VAV BOX COMPONENT 0.066069    
FLOOR 3 STORAGE 1 VAV BOX COMPONENT 0.025766    
FLOOR 3 STORAGE 2 VAV BOX COMPONENT 0.023295    
FLOOR 3 TREATMENT VAV BOX COMPONENT 0.227984    
FLOOR 3 UNDEVELOPED 1 VAV BOX COMPONENT 0.832108    
FLOOR 3 UNDEVELOPED 2 VAV BOX COMPONENT 0.430632    
FLOOR 3 UTILITY VAV BOX COMPONENT 0.043066    
FLOOR 3 WORK VAV BOX COMPONENT 0.334004    
NE STAIR VAV BOX COMPONENT 0.180618    
NW ELEVATOR VAV BOX COMPONENT 0.112525    
NW STAIR VAV BOX COMPONENT 0.186888    
SW STAIR VAV BOX COMPONENT 0.087847    


Coil:Heating:Water

Design Coil Load [W] Maximum Water Flow Rate [m3/s] U-Factor Times Area Value [W/K]
FLOOR 1 ANESTHESIA VAV BOX REHEAT COIL 1942.60 0.000042 41.88
FLOOR 1 BIO HAZ VAV BOX REHEAT COIL 161.17 0.000003 3.48
FLOOR 1 CAFE VAV BOX REHEAT COIL 1811.44 0.000039 97.64
FLOOR 1 CLEAN VAV BOX REHEAT COIL 1209.19 0.000026 26.07
FLOOR 1 CLEAN WORK VAV BOX REHEAT COIL 1508.86 0.000032 32.53
FLOOR 1 DICTATION VAV BOX REHEAT COIL 146.07 0.000003 7.87
FLOOR 1 DRESSING ROOM VAV BOX REHEAT COIL 539.16 0.000012 11.62
FLOOR 1 ELECTRICAL ROOM VAV BOX REHEAT COIL 262.73 0.000006 14.16
FLOOR 1 ELEVATOR PUMP ROOM VAV BOX REHEAT COIL 1624.95 0.000035 87.59
FLOOR 1 HUMID VAV BOX REHEAT COIL 71.62 0.000002 3.86
FLOOR 1 IT HALL VAV BOX REHEAT COIL 102.77 0.000002 5.54
FLOOR 1 IT ROOM VAV BOX REHEAT COIL 118.43 0.000003 6.38
FLOOR 1 LOBBY VAV BOX REHEAT COIL 2145.52 0.000046 87.06
FLOOR 1 LOBBY HALL VAV BOX REHEAT COIL 221.81 0.000005 11.96
FLOOR 1 LOBBY TOILET VAV BOX REHEAT COIL 1214.13 0.000026 26.18
FLOOR 1 LOCKER ROOM VAV BOX REHEAT COIL 1322.41 0.000028 71.28
FLOOR 1 LOCKER ROOM HALL VAV BOX REHEAT COIL 321.26 0.000007 17.32
FLOOR 1 LOUNGE VAV BOX REHEAT COIL 663.10 0.000014 35.74
FLOOR 1 MED GAS VAV BOX REHEAT COIL 831.17 0.000018 17.92
FLOOR 1 MRI CONTROL ROOM VAV BOX REHEAT COIL 906.55 0.000020 48.87
FLOOR 1 MRI HALL VAV BOX REHEAT COIL 138.94 0.000003 7.49
FLOOR 1 MRI ROOM VAV BOX REHEAT COIL 2374.29 0.000051 127.98
FLOOR 1 MRI TOILET VAV BOX REHEAT COIL 1214.13 0.000026 26.18
FLOOR 1 NOURISHMENT VAV BOX REHEAT COIL 325.83 0.000007 17.56
FLOOR 1 NURSE HALL VAV BOX REHEAT COIL 390.47 0.000008 21.05
FLOOR 1 NURSE JANITOR VAV BOX REHEAT COIL 48.58 0.000001 2.62
FLOOR 1 NURSE STATION VAV BOX REHEAT COIL 438.21 0.000009 23.62
FLOOR 1 NURSE TOILET VAV BOX REHEAT COIL 1214.13 0.000026 26.18
FLOOR 1 OFFICE VAV BOX REHEAT COIL 474.05 0.000010 25.55
FLOOR 1 OPERATING ROOM 1 VAV BOX REHEAT COIL 13709.63 0.000295 295.60
FLOOR 1 OPERATING ROOM 2 VAV BOX REHEAT COIL 14240.31 0.000307 307.04
FLOOR 1 OPERATING ROOM 3 VAV BOX REHEAT COIL 21404.58 0.000461 461.51
FLOOR 1 PACU VAV BOX REHEAT COIL 1456.95 0.000031 31.41
FLOOR 1 PRE-OP HALL VAV BOX REHEAT COIL 385.85 0.000008 20.80
FLOOR 1 PRE-OP ROOM 1 VAV BOX REHEAT COIL 2549.66 0.000055 54.97
FLOOR 1 PRE-OP ROOM 2 VAV BOX REHEAT COIL 4559.71 0.000098 98.31
FLOOR 1 PRE-OP TOILET VAV BOX REHEAT COIL 1214.13 0.000026 26.18
FLOOR 1 PROCEDURE ROOM VAV BOX REHEAT COIL 9611.82 0.000207 207.24
FLOOR 1 RECEPTION VAV BOX REHEAT COIL 1019.57 0.000022 54.96
FLOOR 1 RECEPTION HALL VAV BOX REHEAT COIL 99.79 0.000002 5.38
FLOOR 1 RECOVERY ROOM VAV BOX REHEAT COIL 7332.14 0.000158 158.09
FLOOR 1 SCHEDULING VAV BOX REHEAT COIL 327.49 0.000007 9.15
FLOOR 1 SCRUB VAV BOX REHEAT COIL 171.40 0.000004 3.99
FLOOR 1 SOIL VAV BOX REHEAT COIL 2832.96 0.000061 61.08
FLOOR 1 SOIL HOLD VAV BOX REHEAT COIL 1259.09 0.000027 27.15
FLOOR 1 SOIL WORK VAV BOX REHEAT COIL 4047.08 0.000087 87.26
FLOOR 1 STEP DOWN VAV BOX REHEAT COIL 3568.99 0.000077 76.95
FLOOR 1 STERILE HALL VAV BOX REHEAT COIL 729.35 0.000016 22.91
FLOOR 1 STERILE STORAGE VAV BOX REHEAT COIL 228.23 0.000005 12.30
FLOOR 1 STORAGE VAV BOX REHEAT COIL 5464.24 0.000118 117.82
FLOOR 1 SUB-STERILE VAV BOX REHEAT COIL 1117.83 0.000024 24.10
FLOOR 1 UTILITY HALL VAV BOX REHEAT COIL 1680.13 0.000036 36.23
FLOOR 1 UTILITY JANITOR VAV BOX REHEAT COIL 91.13 0.000002 1.96
FLOOR 1 UTILITY ROOM VAV BOX REHEAT COIL 1731.66 0.000037 37.34
FLOOR 1 VESTIBULE VAV BOX REHEAT COIL 516.23 0.000011 11.13
AHU-1_HEATC 78870.17 0.001698 1254.61
AHU-1_EXTRAWATERHEATC 78870.17 0.001698 1254.61
AHU-2_HEATC 134224.44 0.002890 2125.58


Coil:Heating:Electric

Nominal Capacity [W]
FLOOR 2 CONFERENCE VAV BOX REHEAT COIL 2786.56
FLOOR 2 CONFERENCE TOILET VAV BOX REHEAT COIL 1414.93
FLOOR 2 DICTATION VAV BOX REHEAT COIL 137.17
FLOOR 2 EXAM 1 VAV BOX REHEAT COIL 3931.78
FLOOR 2 EXAM 2 VAV BOX REHEAT COIL 7163.10
FLOOR 2 EXAM 3 VAV BOX REHEAT COIL 9550.80
FLOOR 2 EXAM 4 VAV BOX REHEAT COIL 1056.56
FLOOR 2 EXAM 5 VAV BOX REHEAT COIL 4425.39
FLOOR 2 EXAM 6 VAV BOX REHEAT COIL 2805.55
FLOOR 2 EXAM 7 VAV BOX REHEAT COIL 10505.88
FLOOR 2 EXAM 8 VAV BOX REHEAT COIL 3330.84
FLOOR 2 EXAM 9 VAV BOX REHEAT COIL 5252.94
FLOOR 2 EXAM HALL 1 VAV BOX REHEAT COIL 623.23
FLOOR 2 EXAM HALL 2 VAV BOX REHEAT COIL 469.36
FLOOR 2 EXAM HALL 3 VAV BOX REHEAT COIL 455.12
FLOOR 2 EXAM HALL 4 VAV BOX REHEAT COIL 376.65
FLOOR 2 EXAM HALL 5 VAV BOX REHEAT COIL 387.90
FLOOR 2 EXAM HALL 6 VAV BOX REHEAT COIL 445.57
FLOOR 2 JANITOR VAV BOX REHEAT COIL 831.01
FLOOR 2 LOUNGE VAV BOX REHEAT COIL 248.98
FLOOR 2 NURSE STATION 1 VAV BOX REHEAT COIL 553.30
FLOOR 2 NURSE STATION 2 VAV BOX REHEAT COIL 663.96
FLOOR 2 OFFICE VAV BOX REHEAT COIL 3380.21
FLOOR 2 OFFICE HALL VAV BOX REHEAT COIL 963.69
FLOOR 2 RECEPTION VAV BOX REHEAT COIL 4763.90
FLOOR 2 RECEPTION HALL VAV BOX REHEAT COIL 864.19
FLOOR 2 RECEPTION TOILET VAV BOX REHEAT COIL 2785.65
FLOOR 2 SCHEDULING 1 VAV BOX REHEAT COIL 634.91
FLOOR 2 SCHEDULING 2 VAV BOX REHEAT COIL 670.19
FLOOR 2 STORAGE 1 VAV BOX REHEAT COIL 154.92
FLOOR 2 STORAGE 2 VAV BOX REHEAT COIL 331.98
FLOOR 2 STORAGE 3 VAV BOX REHEAT COIL 398.38
FLOOR 2 UTILITY VAV BOX REHEAT COIL 940.83
FLOOR 2 WORK VAV BOX REHEAT COIL 3311.76
FLOOR 2 WORK HALL VAV BOX REHEAT COIL 1190.19
FLOOR 2 WORK TOILET VAV BOX REHEAT COIL 1193.85
FLOOR 2 X-RAY VAV BOX REHEAT COIL 6224.71
FLOOR 3 DRESSING ROOM VAV BOX REHEAT COIL 237.20
FLOOR 3 ELEVATOR HALL VAV BOX REHEAT COIL 1538.82
FLOOR 3 HUMID VAV BOX REHEAT COIL 539.09
FLOOR 3 JANITOR VAV BOX REHEAT COIL 696.15
FLOOR 3 LOCKER VAV BOX REHEAT COIL 606.48
FLOOR 3 LOUNGE VAV BOX REHEAT COIL 2362.24
FLOOR 3 LOUNGE TOILET VAV BOX REHEAT COIL 4244.80
FLOOR 3 MECHANICAL VAV BOX REHEAT COIL 1947.80
FLOOR 3 MECHANICAL HALL VAV BOX REHEAT COIL 2025.40
FLOOR 3 OFFICE VAV BOX REHEAT COIL 10356.73
FLOOR 3 OFFICE HALL VAV BOX REHEAT COIL 3480.61
FLOOR 3 OFFICE TOILET VAV BOX REHEAT COIL 1193.85
FLOOR 3 PHYSICAL THERAPY 1 VAV BOX REHEAT COIL 16126.53
FLOOR 3 PHYSICAL THERAPY 2 VAV BOX REHEAT COIL 6517.89
FLOOR 3 PHYSICAL THERAPY TOILET VAV BOX REHEAT COIL 1857.10
FLOOR 3 STORAGE 1 VAV BOX REHEAT COIL 724.25
FLOOR 3 STORAGE 2 VAV BOX REHEAT COIL 579.28
FLOOR 3 TREATMENT VAV BOX REHEAT COIL 5190.74
FLOOR 3 UNDEVELOPED 1 VAV BOX REHEAT COIL 9165.91
FLOOR 3 UNDEVELOPED 2 VAV BOX REHEAT COIL 5827.56
FLOOR 3 UTILITY VAV BOX REHEAT COIL 1210.52
FLOOR 3 WORK VAV BOX REHEAT COIL 3456.27
NE STAIR VAV BOX REHEAT COIL 5076.93
NW ELEVATOR VAV BOX REHEAT COIL 3162.93
NW STAIR VAV BOX REHEAT COIL 5253.18
SW STAIR VAV BOX REHEAT COIL 2449.41


Branch

Maximum Flow Rate [m3/s]
AHU-1 AIR LOOP MAIN BRANCH 7.24
AHU-2 AIR LOOP MAIN BRANCH 10.76


AirLoopHVAC

Design Supply Air Flow Rate [m3/s]
AHU-1 7.24
AHU-2 10.76


Controller:OutdoorAir

Maximum Outdoor Air Flow Rate [m3/s] Minimum Outdoor Air Flow Rate [m3/s]
AHU-1_OA_CONTROLLER 7.24 2.07
AHU-2_OA_CONTROLLER 10.76  


Coil:Cooling:DX:TwoSpeed

Rated High Speed Air Flow Rate [m3/s] Rated High Speed Total Cooling Capacity (gross) [W] Rated High Speed Sensible Heat Ratio Rated Low Speed Air Flow Rate [m3/s] Rated Low Speed Total Cooling Capacity (gross) [W]
AHU-1_COOLC DXCOIL 7.24 179746.23 0.676083 2.41 59909.42
AHU-2_COOLC DXCOIL 10.76 260004.42 0.682969 3.59 86659.47


Fan:VariableVolume

Maximum Flow Rate [m3/s]
AHU-1_FAN 7.24
AHU-2_FAN 10.76


Controller:WaterCoil

Maximum Actuated Flow [m3/s]
AHU-1_HEATC_CONTROLLER 0.001698
AHU-1_EXTRAWATERHEATC_CONTROLLER 0.001698
AHU-2_HEATC_CONTROLLER 0.002890


PlantLoop

Maximum Loop Flow Rate [m3/s] Plant Loop Volume [m3]
SWHSYS1 0.000063 0.047375
HEATSYS1 0.002694 2.02


Boiler:HotWater

Design Water Flow Rate [m3/s]
HEATSYS1 BOILER 0.002694


WaterHeater:Mixed

Use Side Design Flow Rate [m3/s]
SWHSYS1 WATER HEATER 0.000063


Pump:ConstantSpeed

Rated Flow Rate [m3/s] Rated Power Consumption [W]
SWHSYS1 PUMP 0.000063 8.07


Pump:VariableSpeed

Rated Flow Rate [m3/s] Rated Power Consumption [W]
HEATSYS1 PUMP 0.002694 688.20



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 ANESTHESIA

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.49 -12.6
February 19.57 -7.7
March 19.67 0.33
April 19.58 7.02
May 19.49 14.19
June 19.54 19.16
July 19.44 20.92
August 19.56 20.05
September 19.57 15.39
October 19.62 7.43
November 19.54 -0.0
December 19.53 -7.6
     
Annual Sum or Average 19.55 6.46
Minimum of Months 19.44 -12.6
Maximum of Months 19.67 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 BIO HAZ

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.97 -12.6
February 20.06 -7.7
March 20.37 0.33
April 20.53 7.02
May 20.79 14.19
June 21.40 19.16
July 21.45 20.92
August 21.45 20.05
September 21.12 15.39
October 20.50 7.43
November 20.26 -0.0
December 20.07 -7.6
     
Annual Sum or Average 20.67 6.46
Minimum of Months 19.97 -12.6
Maximum of Months 21.45 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 CAFE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.68 -12.6
February 20.93 -7.7
March 21.28 0.33
April 21.37 7.02
May 21.38 14.19
June 21.62 19.16
July 21.56 20.92
August 21.67 20.05
September 21.59 15.39
October 21.38 7.43
November 21.05 -0.0
December 20.83 -7.6
     
Annual Sum or Average 21.28 6.46
Minimum of Months 20.68 -12.6
Maximum of Months 21.67 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 CLEAN

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.84 -12.6
February 20.89 -7.7
March 20.93 0.33
April 20.61 7.02
May 20.09 14.19
June 20.13 19.16
July 19.95 20.92
August 20.14 20.05
September 20.31 15.39
October 20.69 7.43
November 20.77 -0.0
December 20.89 -7.6
     
Annual Sum or Average 20.52 6.46
Minimum of Months 19.95 -12.6
Maximum of Months 20.93 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 CLEAN WORK

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.47 -12.6
February 20.53 -7.7
March 20.61 0.33
April 20.33 7.02
May 19.88 14.19
June 19.91 19.16
July 19.74 20.92
August 19.92 20.05
September 20.06 15.39
October 20.39 7.43
November 20.43 -0.0
December 20.51 -7.6
     
Annual Sum or Average 20.23 6.46
Minimum of Months 19.74 -12.6
Maximum of Months 20.61 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 DICTATION

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.68 -12.6
February 21.74 -7.7
March 21.83 0.33
April 21.73 7.02
May 21.61 14.19
June 21.77 19.16
July 21.69 20.92
August 21.80 20.05
September 21.80 15.39
October 21.78 7.43
November 21.78 -0.0
December 21.75 -7.6
     
Annual Sum or Average 21.75 6.46
Minimum of Months 21.61 -12.6
Maximum of Months 21.83 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 DRESSING ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.39 -12.6
February 19.45 -7.7
March 19.81 0.33
April 20.16 7.02
May 20.72 14.19
June 21.33 19.16
July 21.38 20.92
August 21.32 20.05
September 20.87 15.39
October 20.02 7.43
November 19.66 -0.0
December 19.42 -7.6
     
Annual Sum or Average 20.30 6.46
Minimum of Months 19.39 -12.6
Maximum of Months 21.38 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 ELECTRICAL ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.27 -12.6
February 21.45 -7.7
March 21.77 0.33
April 21.89 7.02
May 21.98 14.19
June 22.11 19.16
July 22.09 20.92
August 22.10 20.05
September 22.07 15.39
October 21.89 7.43
November 21.62 -0.0
December 21.41 -7.6
     
Annual Sum or Average 21.81 6.46
Minimum of Months 21.27 -12.6
Maximum of Months 22.11 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 ELEVATOR PUMP ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.92 -12.6
February 21.07 -7.7
March 21.31 0.33
April 21.27 7.02
May 21.17 14.19
June 21.24 19.16
July 21.13 20.92
August 21.22 20.05
September 21.20 15.39
October 21.25 7.43
November 21.13 -0.0
December 21.01 -7.6
     
Annual Sum or Average 21.16 6.46
Minimum of Months 20.92 -12.6
Maximum of Months 21.31 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 HUMID

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.89 -12.6
February 21.94 -7.7
March 22.01 0.33
April 21.94 7.02
May 21.84 14.19
June 21.99 19.16
July 21.94 20.92
August 22.02 20.05
September 22.00 15.39
October 21.97 7.43
November 21.99 -0.0
December 21.96 -7.6
     
Annual Sum or Average 21.96 6.46
Minimum of Months 21.84 -12.6
Maximum of Months 22.02 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 IT HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.79 -12.6
February 20.88 -7.7
March 21.12 0.33
April 21.13 7.02
May 21.15 14.19
June 21.53 19.16
July 21.48 20.92
August 21.58 20.05
September 21.46 15.39
October 21.16 7.43
November 21.03 -0.0
December 20.89 -7.6
     
Annual Sum or Average 21.18 6.46
Minimum of Months 20.79 -12.6
Maximum of Months 21.58 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 IT ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.96 -12.6
February 21.06 -7.7
March 21.34 0.33
April 21.38 7.02
May 21.48 14.19
June 21.81 19.16
July 21.79 20.92
August 21.84 20.05
September 21.71 15.39
October 21.38 7.43
November 21.23 -0.0
December 21.08 -7.6
     
Annual Sum or Average 21.42 6.46
Minimum of Months 20.96 -12.6
Maximum of Months 21.84 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 LOBBY

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.21 -12.6
February 20.57 -7.7
March 21.09 0.33
April 21.36 7.02
May 21.55 14.19
June 21.83 19.16
July 21.85 20.92
August 21.85 20.05
September 21.71 15.39
October 21.29 7.43
November 20.85 -0.0
December 20.44 -7.6
     
Annual Sum or Average 21.22 6.46
Minimum of Months 20.21 -12.6
Maximum of Months 21.85 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 LOBBY HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.44 -12.6
February 21.62 -7.7
March 21.85 0.33
April 21.91 7.02
May 21.94 14.19
June 22.11 19.16
July 22.11 20.92
August 22.13 20.05
September 22.11 15.39
October 21.93 7.43
November 21.76 -0.0
December 21.58 -7.6
     
Annual Sum or Average 21.87 6.46
Minimum of Months 21.44 -12.6
Maximum of Months 22.13 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 LOBBY TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.51 -12.6
February 19.55 -7.7
March 19.72 0.33
April 19.67 7.02
May 19.57 14.19
June 19.62 19.16
July 19.52 20.92
August 19.63 20.05
September 19.61 15.39
October 19.64 7.43
November 19.58 -0.0
December 19.53 -7.6
     
Annual Sum or Average 19.60 6.46
Minimum of Months 19.51 -12.6
Maximum of Months 19.72 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 LOCKER ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.37 -12.6
February 21.54 -7.7
March 21.82 0.33
April 21.88 7.02
May 21.92 14.19
June 22.09 19.16
July 22.07 20.92
August 22.10 20.05
September 22.05 15.39
October 21.90 7.43
November 21.70 -0.0
December 21.53 -7.6
     
Annual Sum or Average 21.83 6.46
Minimum of Months 21.37 -12.6
Maximum of Months 22.10 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 LOCKER ROOM HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.41 -12.6
February 21.51 -7.7
March 21.70 0.33
April 21.68 7.02
May 21.65 14.19
June 21.91 19.16
July 21.88 20.92
August 21.96 20.05
September 21.93 15.39
October 21.74 7.43
November 21.64 -0.0
December 21.53 -7.6
     
Annual Sum or Average 21.71 6.46
Minimum of Months 21.41 -12.6
Maximum of Months 21.96 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 LOUNGE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.81 -12.6
February 21.88 -7.7
March 22.00 0.33
April 21.97 7.02
May 21.93 14.19
June 22.07 19.16
July 22.05 20.92
August 22.09 20.05
September 22.05 15.39
October 21.99 7.43
November 21.95 -0.0
December 21.88 -7.6
     
Annual Sum or Average 21.97 6.46
Minimum of Months 21.81 -12.6
Maximum of Months 22.09 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 MED GAS

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.23 -12.6
February 19.22 -7.7
March 19.51 0.33
April 19.65 7.02
May 19.98 14.19
June 20.80 19.16
July 20.97 20.92
August 20.79 20.05
September 20.16 15.39
October 19.47 7.43
November 19.41 -0.0
December 19.33 -7.6
     
Annual Sum or Average 19.88 6.46
Minimum of Months 19.22 -12.6
Maximum of Months 20.97 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 MRI CONTROL ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.88 -12.6
February 21.97 -7.7
March 22.10 0.33
April 22.12 7.02
May 22.11 14.19
June 22.16 19.16
July 22.16 20.92
August 22.17 20.05
September 22.15 15.39
October 22.11 7.43
November 22.03 -0.0
December 21.96 -7.6
     
Annual Sum or Average 22.08 6.46
Minimum of Months 21.88 -12.6
Maximum of Months 22.17 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 MRI HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.06 -12.6
February 21.22 -7.7
March 21.53 0.33
April 21.61 7.02
May 21.70 14.19
June 21.95 19.16
July 21.93 20.92
August 21.98 20.05
September 21.91 15.39
October 21.63 7.43
November 21.43 -0.0
December 21.22 -7.6
     
Annual Sum or Average 21.60 6.46
Minimum of Months 21.06 -12.6
Maximum of Months 21.98 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 MRI ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 22.20 -12.6
February 22.23 -7.7
March 22.21 0.33
April 22.19 7.02
May 22.14 14.19
June 22.17 19.16
July 22.17 20.92
August 22.18 20.05
September 22.17 15.39
October 22.18 7.43
November 22.21 -0.0
December 22.21 -7.6
     
Annual Sum or Average 22.19 6.46
Minimum of Months 22.14 -12.6
Maximum of Months 22.23 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 MRI TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.36 -12.6
February 19.36 -7.7
March 19.49 0.33
April 19.43 7.02
May 19.43 14.19
June 19.47 19.16
July 19.38 20.92
August 19.48 20.05
September 19.42 15.39
October 19.41 7.43
November 19.40 -0.0
December 19.38 -7.6
     
Annual Sum or Average 19.42 6.46
Minimum of Months 19.36 -12.6
Maximum of Months 19.49 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 NOURISHMENT

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.89 -12.6
February 21.95 -7.7
March 22.00 0.33
April 21.91 7.02
May 21.79 14.19
June 21.90 19.16
July 21.84 20.92
August 21.93 20.05
September 21.93 15.39
October 21.95 7.43
November 21.97 -0.0
December 21.95 -7.6
     
Annual Sum or Average 21.92 6.46
Minimum of Months 21.79 -12.6
Maximum of Months 22.00 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 NURSE HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.97 -12.6
February 21.08 -7.7
March 21.28 0.33
April 21.27 7.02
May 21.22 14.19
June 21.51 19.16
July 21.46 20.92
August 21.60 20.05
September 21.59 15.39
October 21.39 7.43
November 21.23 -0.0
December 21.08 -7.6
     
Annual Sum or Average 21.31 6.46
Minimum of Months 20.97 -12.6
Maximum of Months 21.60 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 NURSE JANITOR

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.66 -12.6
February 21.73 -7.7
March 21.86 0.33
April 21.80 7.02
May 21.72 14.19
June 21.96 19.16
July 21.93 20.92
August 22.01 20.05
September 21.99 15.39
October 21.87 7.43
November 21.83 -0.0
December 21.77 -7.6
     
Annual Sum or Average 21.84 6.46
Minimum of Months 21.66 -12.6
Maximum of Months 22.01 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 NURSE STATION

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.70 -12.6
February 21.77 -7.7
March 21.86 0.33
April 21.78 7.02
May 21.67 14.19
June 21.83 19.16
July 21.75 20.92
August 21.86 20.05
September 21.86 15.39
October 21.84 7.43
November 21.81 -0.0
December 21.77 -7.6
     
Annual Sum or Average 21.79 6.46
Minimum of Months 21.67 -12.6
Maximum of Months 21.86 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 NURSE TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.42 -12.6
February 19.42 -7.7
March 19.54 0.33
April 19.46 7.02
May 19.43 14.19
June 19.47 19.16
July 19.37 20.92
August 19.48 20.05
September 19.43 15.39
October 19.44 7.43
November 19.44 -0.0
December 19.44 -7.6
     
Annual Sum or Average 19.45 6.46
Minimum of Months 19.37 -12.6
Maximum of Months 19.54 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 OFFICE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.60 -12.6
February 21.70 -7.7
March 21.88 0.33
April 21.88 7.02
May 21.86 14.19
June 22.04 19.16
July 22.02 20.92
August 22.07 20.05
September 22.04 15.39
October 21.91 7.43
November 21.82 -0.0
December 21.71 -7.6
     
Annual Sum or Average 21.88 6.46
Minimum of Months 21.60 -12.6
Maximum of Months 22.07 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 OPERATING ROOM 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.04 -12.6
February 19.30 -7.7
March 19.58 0.33
April 19.53 7.02
May 19.21 14.19
June 19.29 19.16
July 19.23 20.92
August 19.29 20.05
September 19.38 15.39
October 19.56 7.43
November 19.27 -0.0
December 19.15 -7.6
     
Annual Sum or Average 19.32 6.46
Minimum of Months 19.04 -12.6
Maximum of Months 19.58 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 OPERATING ROOM 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.39 -12.6
February 19.56 -7.7
March 19.77 0.33
April 19.65 7.02
May 19.28 14.19
June 19.31 19.16
July 19.24 20.92
August 19.29 20.05
September 19.42 15.39
October 19.65 7.43
November 19.49 -0.0
December 19.46 -7.6
     
Annual Sum or Average 19.46 6.46
Minimum of Months 19.24 -12.6
Maximum of Months 19.77 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 OPERATING ROOM 3

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 18.85 -12.6
February 18.84 -7.7
March 18.81 0.33
April 18.65 7.02
May 18.38 14.19
June 18.34 19.16
July 18.33 20.92
August 18.34 20.05
September 18.40 15.39
October 18.62 7.43
November 18.69 -0.0
December 18.81 -7.6
     
Annual Sum or Average 18.59 6.46
Minimum of Months 18.33 -12.6
Maximum of Months 18.85 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 PACU

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.09 -12.6
February 20.13 -7.7
March 20.20 0.33
April 19.99 7.02
May 19.66 14.19
June 19.65 19.16
July 19.50 20.92
August 19.63 20.05
September 19.75 15.39
October 20.03 7.43
November 20.06 -0.0
December 20.11 -7.6
     
Annual Sum or Average 19.90 6.46
Minimum of Months 19.50 -12.6
Maximum of Months 20.20 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 PRE-OP HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.73 -12.6
February 20.93 -7.7
March 21.24 0.33
April 21.38 7.02
May 21.42 14.19
June 21.74 19.16
July 21.72 20.92
August 21.81 20.05
September 21.76 15.39
October 21.48 7.43
November 21.21 -0.0
December 20.94 -7.6
     
Annual Sum or Average 21.37 6.46
Minimum of Months 20.73 -12.6
Maximum of Months 21.81 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 PRE-OP ROOM 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.46 -12.6
February 19.53 -7.7
March 19.71 0.33
April 19.65 7.02
May 19.53 14.19
June 19.56 19.16
July 19.44 20.92
August 19.56 20.05
September 19.60 15.39
October 19.68 7.43
November 19.59 -0.0
December 19.53 -7.6
     
Annual Sum or Average 19.57 6.46
Minimum of Months 19.44 -12.6
Maximum of Months 19.71 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 PRE-OP ROOM 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.80 -12.6
February 19.83 -7.7
March 19.92 0.33
April 19.77 7.02
May 19.56 14.19
June 19.55 19.16
July 19.42 20.92
August 19.53 20.05
September 19.62 15.39
October 19.81 7.43
November 19.82 -0.0
December 19.84 -7.6
     
Annual Sum or Average 19.71 6.46
Minimum of Months 19.42 -12.6
Maximum of Months 19.92 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 PRE-OP TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.35 -12.6
February 19.35 -7.7
March 19.48 0.33
April 19.41 7.02
May 19.43 14.19
June 19.48 19.16
July 19.38 20.92
August 19.49 20.05
September 19.42 15.39
October 19.39 7.43
November 19.39 -0.0
December 19.37 -7.6
     
Annual Sum or Average 19.41 6.46
Minimum of Months 19.35 -12.6
Maximum of Months 19.49 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 PROCEDURE ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.37 -12.6
February 19.36 -7.7
March 19.50 0.33
April 19.43 7.02
May 19.45 14.19
June 19.49 19.16
July 19.39 20.92
August 19.49 20.05
September 19.43 15.39
October 19.41 7.43
November 19.41 -0.0
December 19.38 -7.6
     
Annual Sum or Average 19.43 6.46
Minimum of Months 19.36 -12.6
Maximum of Months 19.50 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 RECEPTION

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.19 -12.6
February 21.40 -7.7
March 21.67 0.33
April 21.73 7.02
May 21.75 14.19
June 21.96 19.16
July 21.94 20.92
August 22.00 20.05
September 21.96 15.39
October 21.76 7.43
November 21.55 -0.0
December 21.34 -7.6
     
Annual Sum or Average 21.69 6.46
Minimum of Months 21.19 -12.6
Maximum of Months 22.00 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 RECEPTION HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.14 -12.6
February 21.30 -7.7
March 21.55 0.33
April 21.58 7.02
May 21.58 14.19
June 21.86 19.16
July 21.83 20.92
August 21.92 20.05
September 21.89 15.39
October 21.67 7.43
November 21.49 -0.0
December 21.31 -7.6
     
Annual Sum or Average 21.59 6.46
Minimum of Months 21.14 -12.6
Maximum of Months 21.92 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 RECOVERY ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.56 -12.6
February 19.67 -7.7
March 19.78 0.33
April 19.72 7.02
May 19.56 14.19
June 19.64 19.16
July 19.56 20.92
August 19.73 20.05
September 19.74 15.39
October 19.79 7.43
November 19.63 -0.0
December 19.59 -7.6
     
Annual Sum or Average 19.66 6.46
Minimum of Months 19.56 -12.6
Maximum of Months 19.79 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 SCHEDULING

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.54 -12.6
February 20.84 -7.7
March 21.22 0.33
April 21.37 7.02
May 21.45 14.19
June 21.74 19.16
July 21.72 20.92
August 21.79 20.05
September 21.73 15.39
October 21.44 7.43
November 21.11 -0.0
December 20.77 -7.6
     
Annual Sum or Average 21.31 6.46
Minimum of Months 20.54 -12.6
Maximum of Months 21.79 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 SCRUB

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.55 -12.6
February 20.81 -7.7
March 21.23 0.33
April 21.40 7.02
May 21.54 14.19
June 21.87 19.16
July 21.87 20.92
August 21.89 20.05
September 21.85 15.39
October 21.43 7.43
November 21.00 -0.0
December 20.70 -7.6
     
Annual Sum or Average 21.35 6.46
Minimum of Months 20.55 -12.6
Maximum of Months 21.89 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 SOIL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.56 -12.6
February 19.57 -7.7
March 19.67 0.33
April 19.55 7.02
May 19.46 14.19
June 19.48 19.16
July 19.38 20.92
August 19.48 20.05
September 19.49 15.39
October 19.55 7.43
November 19.56 -0.0
December 19.57 -7.6
     
Annual Sum or Average 19.53 6.46
Minimum of Months 19.38 -12.6
Maximum of Months 19.67 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 SOIL HOLD

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.45 -12.6
February 19.45 -7.7
March 19.58 0.33
April 19.50 7.02
May 19.45 14.19
June 19.49 19.16
July 19.39 20.92
August 19.49 20.05
September 19.48 15.39
October 19.49 7.43
November 19.48 -0.0
December 19.46 -7.6
     
Annual Sum or Average 19.48 6.46
Minimum of Months 19.39 -12.6
Maximum of Months 19.58 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 SOIL WORK

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.47 -12.6
February 19.48 -7.7
March 19.59 0.33
April 19.49 7.02
May 19.44 14.19
June 19.47 19.16
July 19.38 20.92
August 19.48 20.05
September 19.45 15.39
October 19.48 7.43
November 19.48 -0.0
December 19.48 -7.6
     
Annual Sum or Average 19.47 6.46
Minimum of Months 19.38 -12.6
Maximum of Months 19.59 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 STEP DOWN

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.52 -12.6
February 19.64 -7.7
March 19.82 0.33
April 19.87 7.02
May 19.74 14.19
June 19.94 19.16
July 19.89 20.92
August 20.02 20.05
September 19.94 15.39
October 19.88 7.43
November 19.64 -0.0
December 19.56 -7.6
     
Annual Sum or Average 19.79 6.46
Minimum of Months 19.52 -12.6
Maximum of Months 20.02 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 STERILE HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.73 -12.6
February 20.96 -7.7
March 21.29 0.33
April 21.40 7.02
May 21.47 14.19
June 21.79 19.16
July 21.78 20.92
August 21.85 20.05
September 21.80 15.39
October 21.47 7.43
November 21.15 -0.0
December 20.87 -7.6
     
Annual Sum or Average 21.38 6.46
Minimum of Months 20.73 -12.6
Maximum of Months 21.85 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 STERILE STORAGE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.48 -12.6
February 21.56 -7.7
March 21.72 0.33
April 21.67 7.02
May 21.59 14.19
June 21.88 19.16
July 21.86 20.92
August 21.95 20.05
September 21.93 15.39
October 21.76 7.43
November 21.68 -0.0
December 21.60 -7.6
     
Annual Sum or Average 21.72 6.46
Minimum of Months 21.48 -12.6
Maximum of Months 21.95 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 STORAGE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.24 -12.6
February 19.25 -7.7
March 19.57 0.33
April 19.81 7.02
May 20.27 14.19
June 21.14 19.16
July 21.32 20.92
August 21.18 20.05
September 20.52 15.39
October 19.60 7.43
November 19.47 -0.0
December 19.34 -7.6
     
Annual Sum or Average 20.07 6.46
Minimum of Months 19.24 -12.6
Maximum of Months 21.32 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 SUB-STERILE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.56 -12.6
February 19.79 -7.7
March 20.32 0.33
April 20.75 7.02
May 21.20 14.19
June 21.63 19.16
July 21.69 20.92
August 21.64 20.05
September 21.41 15.39
October 20.63 7.43
November 20.01 -0.0
December 19.67 -7.6
     
Annual Sum or Average 20.70 6.46
Minimum of Months 19.56 -12.6
Maximum of Months 21.69 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 UTILITY HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.35 -12.6
February 19.40 -7.7
March 19.72 0.33
April 20.04 7.02
May 20.59 14.19
June 21.40 19.16
July 21.53 20.92
August 21.43 20.05
September 20.84 15.39
October 19.88 7.43
November 19.61 -0.0
December 19.41 -7.6
     
Annual Sum or Average 20.27 6.46
Minimum of Months 19.35 -12.6
Maximum of Months 21.53 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 UTILITY JANITOR

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.57 -12.6
February 20.78 -7.7
March 21.17 0.33
April 21.35 7.02
May 21.52 14.19
June 21.88 19.16
July 21.88 20.92
August 21.90 20.05
September 21.82 15.39
October 21.38 7.43
November 20.99 -0.0
December 20.71 -7.6
     
Annual Sum or Average 21.33 6.46
Minimum of Months 20.57 -12.6
Maximum of Months 21.90 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 UTILITY ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.52 -12.6
February 19.67 -7.7
March 20.09 0.33
April 20.50 7.02
May 21.03 14.19
June 21.63 19.16
July 21.74 20.92
August 21.66 20.05
September 21.30 15.39
October 20.37 7.43
November 19.92 -0.0
December 19.62 -7.6
     
Annual Sum or Average 20.59 6.46
Minimum of Months 19.52 -12.6
Maximum of Months 21.74 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 1 VESTIBULE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 7.78 -12.6
February 9.97 -7.7
March 12.66 0.33
April 15.76 7.02
May 18.61 14.19
June 20.66 19.16
July 21.57 20.92
August 21.56 20.05
September 19.42 15.39
October 16.16 7.43
November 13.42 -0.0
December 10.57 -7.6
     
Annual Sum or Average 15.71 6.46
Minimum of Months 7.78 -12.6
Maximum of Months 21.57 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 CONFERENCE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.81 -12.6
February 20.08 -7.7
March 20.48 0.33
April 20.75 7.02
May 21.00 14.19
June 21.20 19.16
July 21.09 20.92
August 21.20 20.05
September 21.08 15.39
October 20.70 7.43
November 20.27 -0.0
December 19.86 -7.6
     
Annual Sum or Average 20.63 6.46
Minimum of Months 19.81 -12.6
Maximum of Months 21.20 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 CONFERENCE TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.47 -12.6
February 19.52 -7.7
March 19.65 0.33
April 19.58 7.02
May 19.56 14.19
June 19.53 19.16
July 19.39 20.92
August 19.52 20.05
September 19.55 15.39
October 19.59 7.43
November 19.52 -0.0
December 19.47 -7.6
     
Annual Sum or Average 19.53 6.46
Minimum of Months 19.39 -12.6
Maximum of Months 19.65 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 DICTATION

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.23 -12.6
February 21.40 -7.7
March 21.66 0.33
April 21.65 7.02
May 21.66 14.19
June 21.73 19.16
July 21.60 20.92
August 21.74 20.05
September 21.70 15.39
October 21.64 7.43
November 21.50 -0.0
December 21.34 -7.6
     
Annual Sum or Average 21.57 6.46
Minimum of Months 21.23 -12.6
Maximum of Months 21.74 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.43 -12.6
February 19.54 -7.7
March 19.79 0.33
April 20.07 7.02
May 20.17 14.19
June 20.37 19.16
July 20.32 20.92
August 20.42 20.05
September 20.21 15.39
October 19.90 7.43
November 19.59 -0.0
December 19.44 -7.6
     
Annual Sum or Average 19.94 6.46
Minimum of Months 19.43 -12.6
Maximum of Months 20.42 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.59 -12.6
February 19.70 -7.7
March 19.88 0.33
April 19.86 7.02
May 19.81 14.19
June 19.78 19.16
July 19.60 20.92
August 19.79 20.05
September 19.81 15.39
October 19.88 7.43
November 19.71 -0.0
December 19.62 -7.6
     
Annual Sum or Average 19.75 6.46
Minimum of Months 19.59 -12.6
Maximum of Months 19.88 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 3

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.59 -12.6
February 19.69 -7.7
March 19.85 0.33
April 19.81 7.02
May 19.74 14.19
June 19.71 19.16
July 19.54 20.92
August 19.72 20.05
September 19.75 15.39
October 19.84 7.43
November 19.69 -0.0
December 19.61 -7.6
     
Annual Sum or Average 19.71 6.46
Minimum of Months 19.54 -12.6
Maximum of Months 19.85 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 4

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.63 -12.6
February 19.79 -7.7
March 20.03 0.33
April 20.12 7.02
May 20.13 14.19
June 20.21 19.16
July 20.07 20.92
August 20.29 20.05
September 20.29 15.39
October 20.19 7.43
November 19.82 -0.0
December 19.66 -7.6
     
Annual Sum or Average 20.02 6.46
Minimum of Months 19.63 -12.6
Maximum of Months 20.29 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 5

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.45 -12.6
February 19.53 -7.7
March 19.78 0.33
April 19.99 7.02
May 20.22 14.19
June 20.35 19.16
July 20.18 20.92
August 20.22 20.05
September 20.09 15.39
October 19.82 7.43
November 19.60 -0.0
December 19.46 -7.6
     
Annual Sum or Average 19.89 6.46
Minimum of Months 19.45 -12.6
Maximum of Months 20.35 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 6

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.45 -12.6
February 19.52 -7.7
March 19.71 0.33
April 19.74 7.02
May 19.86 14.19
June 19.94 19.16
July 19.76 20.92
August 19.89 20.05
September 19.79 15.39
October 19.70 7.43
November 19.59 -0.0
December 19.46 -7.6
     
Annual Sum or Average 19.70 6.46
Minimum of Months 19.45 -12.6
Maximum of Months 19.94 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 7

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.55 -12.6
February 19.62 -7.7
March 19.81 0.33
April 19.76 7.02
May 19.76 14.19
June 19.73 19.16
July 19.54 20.92
August 19.70 20.05
September 19.71 15.39
October 19.74 7.43
November 19.66 -0.0
December 19.57 -7.6
     
Annual Sum or Average 19.68 6.46
Minimum of Months 19.54 -12.6
Maximum of Months 19.81 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 8

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.47 -12.6
February 19.56 -7.7
March 19.79 0.33
April 19.84 7.02
May 19.96 14.19
June 20.03 19.16
July 19.82 20.92
August 19.96 20.05
September 19.87 15.39
October 19.79 7.43
November 19.65 -0.0
December 19.49 -7.6
     
Annual Sum or Average 19.77 6.46
Minimum of Months 19.47 -12.6
Maximum of Months 20.03 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM 9

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.58 -12.6
February 19.67 -7.7
March 19.90 0.33
April 19.88 7.02
May 19.90 14.19
June 19.88 19.16
July 19.68 20.92
August 19.85 20.05
September 19.84 15.39
October 19.86 7.43
November 19.74 -0.0
December 19.62 -7.6
     
Annual Sum or Average 19.78 6.46
Minimum of Months 19.58 -12.6
Maximum of Months 19.90 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM HALL 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.20 -12.6
February 20.52 -7.7
March 20.93 0.33
April 21.22 7.02
May 21.40 14.19
June 21.58 19.16
July 21.54 20.92
August 21.63 20.05
September 21.50 15.39
October 21.17 7.43
November 20.69 -0.0
December 20.32 -7.6
     
Annual Sum or Average 21.06 6.46
Minimum of Months 20.20 -12.6
Maximum of Months 21.63 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM HALL 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.48 -12.6
February 20.77 -7.7
March 21.11 0.33
April 21.23 7.02
May 21.33 14.19
June 21.45 19.16
July 21.34 20.92
August 21.50 20.05
September 21.44 15.39
October 21.26 7.43
November 20.91 -0.0
December 20.60 -7.6
     
Annual Sum or Average 21.12 6.46
Minimum of Months 20.48 -12.6
Maximum of Months 21.50 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM HALL 3

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.52 -12.6
February 20.80 -7.7
March 21.11 0.33
April 21.20 7.02
May 21.26 14.19
June 21.39 19.16
July 21.26 20.92
August 21.44 20.05
September 21.40 15.39
October 21.24 7.43
November 20.91 -0.0
December 20.63 -7.6
     
Annual Sum or Average 21.10 6.46
Minimum of Months 20.52 -12.6
Maximum of Months 21.44 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM HALL 4

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.45 -12.6
February 20.72 -7.7
March 21.20 0.33
April 21.32 7.02
May 21.50 14.19
June 21.65 19.16
July 21.52 20.92
August 21.62 20.05
September 21.47 15.39
October 21.24 7.43
November 20.96 -0.0
December 20.65 -7.6
     
Annual Sum or Average 21.20 6.46
Minimum of Months 20.45 -12.6
Maximum of Months 21.65 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM HALL 5

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.47 -12.6
February 20.76 -7.7
March 21.26 0.33
April 21.42 7.02
May 21.61 14.19
June 21.78 19.16
July 21.66 20.92
August 21.75 20.05
September 21.59 15.39
October 21.34 7.43
November 21.03 -0.0
December 20.67 -7.6
     
Annual Sum or Average 21.28 6.46
Minimum of Months 20.47 -12.6
Maximum of Months 21.78 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 EXAM HALL 6

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.34 -12.6
February 20.63 -7.7
March 21.15 0.33
April 21.34 7.02
May 21.55 14.19
June 21.73 19.16
July 21.60 20.92
August 21.70 20.05
September 21.54 15.39
October 21.26 7.43
November 20.92 -0.0
December 20.54 -7.6
     
Annual Sum or Average 21.19 6.46
Minimum of Months 20.34 -12.6
Maximum of Months 21.73 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 JANITOR

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.68 -12.6
February 19.90 -7.7
March 20.43 0.33
April 20.84 7.02
May 21.31 14.19
June 21.66 19.16
July 21.65 20.92
August 21.65 20.05
September 21.33 15.39
October 20.70 7.43
November 20.21 -0.0
December 19.80 -7.6
     
Annual Sum or Average 20.77 6.46
Minimum of Months 19.68 -12.6
Maximum of Months 21.66 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 LOUNGE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.48 -12.6
February 21.62 -7.7
March 21.84 0.33
April 21.84 7.02
May 21.86 14.19
June 21.90 19.16
July 21.80 20.92
August 21.90 20.05
September 21.87 15.39
October 21.82 7.43
November 21.70 -0.0
December 21.57 -7.6
     
Annual Sum or Average 21.77 6.46
Minimum of Months 21.48 -12.6
Maximum of Months 21.90 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 NURSE STATION 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.23 -12.6
February 21.40 -7.7
March 21.71 0.33
April 21.73 7.02
May 21.78 14.19
June 21.84 19.16
July 21.72 20.92
August 21.83 20.05
September 21.77 15.39
October 21.69 7.43
November 21.52 -0.0
December 21.35 -7.6
     
Annual Sum or Average 21.63 6.46
Minimum of Months 21.23 -12.6
Maximum of Months 21.84 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 NURSE STATION 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.23 -12.6
February 21.41 -7.7
March 21.73 0.33
April 21.76 7.02
May 21.82 14.19
June 21.89 19.16
July 21.78 20.92
August 21.88 20.05
September 21.81 15.39
October 21.72 7.43
November 21.55 -0.0
December 21.36 -7.6
     
Annual Sum or Average 21.66 6.46
Minimum of Months 21.23 -12.6
Maximum of Months 21.89 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 OFFICE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.58 -12.6
February 19.86 -7.7
March 20.56 0.33
April 21.10 7.02
May 21.68 14.19
June 21.86 19.16
July 21.85 20.92
August 21.83 20.05
September 21.61 15.39
October 20.94 7.43
November 20.18 -0.0
December 19.65 -7.6
     
Annual Sum or Average 20.90 6.46
Minimum of Months 19.58 -12.6
Maximum of Months 21.86 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 OFFICE HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.45 -12.6
February 20.74 -7.7
March 21.26 0.33
April 21.52 7.02
May 21.79 14.19
June 21.93 19.16
July 21.88 20.92
August 21.90 20.05
September 21.80 15.39
October 21.43 7.43
November 20.98 -0.0
December 20.60 -7.6
     
Annual Sum or Average 21.36 6.46
Minimum of Months 20.45 -12.6
Maximum of Months 21.93 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 RECEPTION

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.99 -12.6
February 20.31 -7.7
March 20.84 0.33
April 21.12 7.02
May 21.40 14.19
June 21.59 19.16
July 21.54 20.92
August 21.61 20.05
September 21.46 15.39
October 21.04 7.43
November 20.58 -0.0
December 20.14 -7.6
     
Annual Sum or Average 20.97 6.46
Minimum of Months 19.99 -12.6
Maximum of Months 21.61 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 RECEPTION HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.16 -12.6
February 21.37 -7.7
March 21.68 0.33
April 21.74 7.02
May 21.79 14.19
June 21.88 19.16
July 21.79 20.92
August 21.89 20.05
September 21.83 15.39
October 21.71 7.43
November 21.50 -0.0
December 21.30 -7.6
     
Annual Sum or Average 21.64 6.46
Minimum of Months 21.16 -12.6
Maximum of Months 21.89 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 RECEPTION TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.46 -12.6
February 19.51 -7.7
March 19.63 0.33
April 19.57 7.02
May 19.54 14.19
June 19.52 19.16
July 19.38 20.92
August 19.51 20.05
September 19.53 15.39
October 19.57 7.43
November 19.51 -0.0
December 19.46 -7.6
     
Annual Sum or Average 19.52 6.46
Minimum of Months 19.38 -12.6
Maximum of Months 19.63 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 SCHEDULING 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.51 -12.6
February 21.66 -7.7
March 21.89 0.33
April 21.90 7.02
May 21.93 14.19
June 21.99 19.16
July 21.92 20.92
August 21.99 20.05
September 21.95 15.39
October 21.88 7.43
November 21.75 -0.0
December 21.63 -7.6
     
Annual Sum or Average 21.83 6.46
Minimum of Months 21.51 -12.6
Maximum of Months 21.99 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 SCHEDULING 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.41 -12.6
February 21.58 -7.7
March 21.84 0.33
April 21.87 7.02
May 21.91 14.19
June 21.98 19.16
July 21.91 20.92
August 21.99 20.05
September 21.94 15.39
October 21.85 7.43
November 21.69 -0.0
December 21.53 -7.6
     
Annual Sum or Average 21.79 6.46
Minimum of Months 21.41 -12.6
Maximum of Months 21.99 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 STORAGE 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.30 -12.6
February 20.45 -7.7
March 20.70 0.33
April 20.76 7.02
May 20.75 14.19
June 20.85 19.16
July 20.72 20.92
August 20.89 20.05
September 20.87 15.39
October 20.79 7.43
November 20.55 -0.0
December 20.40 -7.6
     
Annual Sum or Average 20.67 6.46
Minimum of Months 20.30 -12.6
Maximum of Months 20.89 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 STORAGE 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.24 -12.6
February 20.45 -7.7
March 20.82 0.33
April 20.93 7.02
May 21.04 14.19
June 21.18 19.16
July 21.03 20.92
August 21.14 20.05
September 21.04 15.39
October 20.86 7.43
November 20.62 -0.0
December 20.37 -7.6
     
Annual Sum or Average 20.81 6.46
Minimum of Months 20.24 -12.6
Maximum of Months 21.18 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 STORAGE 3

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.26 -12.6
February 20.48 -7.7
March 20.89 0.33
April 21.05 7.02
May 21.20 14.19
June 21.36 19.16
July 21.20 20.92
August 21.31 20.05
September 21.18 15.39
October 20.97 7.43
November 20.70 -0.0
December 20.40 -7.6
     
Annual Sum or Average 20.92 6.46
Minimum of Months 20.26 -12.6
Maximum of Months 21.36 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 UTILITY

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.49 -12.6
February 19.67 -7.7
March 20.18 0.33
April 20.72 7.02
May 21.36 14.19
June 21.63 19.16
July 21.63 20.92
August 21.57 20.05
September 21.25 15.39
October 20.42 7.43
November 19.87 -0.0
December 19.53 -7.6
     
Annual Sum or Average 20.61 6.46
Minimum of Months 19.49 -12.6
Maximum of Months 21.63 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 WORK

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.63 -12.6
February 20.94 -7.7
March 21.50 0.33
April 21.68 7.02
May 21.90 14.19
June 22.03 19.16
July 21.99 20.92
August 22.02 20.05
September 21.89 15.39
October 21.60 7.43
November 21.23 -0.0
December 20.88 -7.6
     
Annual Sum or Average 21.53 6.46
Minimum of Months 20.63 -12.6
Maximum of Months 22.03 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 WORK HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 21.11 -12.6
February 21.35 -7.7
March 21.74 0.33
April 21.84 7.02
May 21.94 14.19
June 22.04 19.16
July 22.00 20.92
August 22.04 20.05
September 21.97 15.39
October 21.79 7.43
November 21.54 -0.0
December 21.29 -7.6
     
Annual Sum or Average 21.72 6.46
Minimum of Months 21.11 -12.6
Maximum of Months 22.04 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 WORK TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.39 -12.6
February 19.42 -7.7
March 19.53 0.33
April 19.51 7.02
May 19.53 14.19
June 19.56 19.16
July 19.43 20.92
August 19.55 20.05
September 19.51 15.39
October 19.48 7.43
November 19.42 -0.0
December 19.38 -7.6
     
Annual Sum or Average 19.48 6.46
Minimum of Months 19.38 -12.6
Maximum of Months 19.56 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 2 X-RAY

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 22.35 -12.6
February 22.37 -7.7
March 22.47 0.33
April 22.40 7.02
May 22.25 14.19
June 22.19 19.16
July 22.13 20.92
August 22.17 20.05
September 22.25 15.39
October 22.40 7.43
November 22.41 -0.0
December 22.39 -7.6
     
Annual Sum or Average 22.31 6.46
Minimum of Months 22.13 -12.6
Maximum of Months 22.47 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 DRESSING ROOM

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.20 -12.6
February 20.46 -7.7
March 20.97 0.33
April 21.16 7.02
May 21.37 14.19
June 21.48 19.16
July 21.36 20.92
August 21.45 20.05
September 21.31 15.39
October 21.08 7.43
November 20.73 -0.0
December 20.38 -7.6
     
Annual Sum or Average 21.00 6.46
Minimum of Months 20.20 -12.6
Maximum of Months 21.48 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 ELEVATOR HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.64 -12.6
February 19.88 -7.7
March 20.48 0.33
April 20.98 7.02
May 21.55 14.19
June 21.83 19.16
July 21.84 20.92
August 21.83 20.05
September 21.47 15.39
October 20.77 7.43
November 20.23 -0.0
December 19.74 -7.6
     
Annual Sum or Average 20.86 6.46
Minimum of Months 19.64 -12.6
Maximum of Months 21.84 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 HUMID

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.29 -12.6
February 20.57 -7.7
March 21.09 0.33
April 21.29 7.02
May 21.51 14.19
June 21.61 19.16
July 21.50 20.92
August 21.59 20.05
September 21.45 15.39
October 21.21 7.43
November 20.84 -0.0
December 20.49 -7.6
     
Annual Sum or Average 21.12 6.46
Minimum of Months 20.29 -12.6
Maximum of Months 21.61 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 JANITOR

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.33 -12.6
February 19.38 -7.7
March 19.62 0.33
April 19.86 7.02
May 20.22 14.19
June 20.69 19.16
July 20.73 20.92
August 20.66 20.05
September 20.22 15.39
October 19.66 7.43
November 19.50 -0.0
December 19.37 -7.6
     
Annual Sum or Average 19.94 6.46
Minimum of Months 19.33 -12.6
Maximum of Months 20.73 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 LOCKER

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.38 -12.6
February 20.65 -7.7
March 21.24 0.33
April 21.48 7.02
May 21.77 14.19
June 21.89 19.16
July 21.82 20.92
August 21.87 20.05
September 21.69 15.39
October 21.37 7.43
November 20.95 -0.0
December 20.58 -7.6
     
Annual Sum or Average 21.31 6.46
Minimum of Months 20.38 -12.6
Maximum of Months 21.89 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 LOUNGE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 20.39 -12.6
February 20.71 -7.7
March 21.33 0.33
April 21.59 7.02
May 21.89 14.19
June 22.01 19.16
July 21.97 20.92
August 22.00 20.05
September 21.82 15.39
October 21.49 7.43
November 21.03 -0.0
December 20.62 -7.6
     
Annual Sum or Average 21.41 6.46
Minimum of Months 20.39 -12.6
Maximum of Months 22.01 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 LOUNGE TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.39 -12.6
February 19.40 -7.7
March 19.48 0.33
April 19.43 7.02
May 19.45 14.19
June 19.49 19.16
July 19.38 20.92
August 19.48 20.05
September 19.42 15.39
October 19.40 7.43
November 19.39 -0.0
December 19.37 -7.6
     
Annual Sum or Average 19.42 6.46
Minimum of Months 19.37 -12.6
Maximum of Months 19.49 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 MECHANICAL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 24.33 -12.6
February 24.50 -7.7
March 24.64 0.33
April 25.12 7.02
May 25.16 14.19
June 24.99 19.16
July 25.21 20.92
August 24.89 20.05
September 25.24 15.39
October 25.27 7.43
November 24.87 -0.0
December 24.65 -7.6
     
Annual Sum or Average 24.91 6.46
Minimum of Months 24.33 -12.6
Maximum of Months 25.27 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 MECHANICAL HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.81 -12.6
February 20.19 -7.7
March 20.91 0.33
April 21.45 7.02
May 21.92 14.19
June 22.04 19.16
July 22.05 20.92
August 22.03 20.05
September 21.86 15.39
October 21.37 7.43
November 20.60 -0.0
December 20.00 -7.6
     
Annual Sum or Average 21.19 6.46
Minimum of Months 19.81 -12.6
Maximum of Months 22.05 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 OFFICE

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.72 -12.6
February 20.11 -7.7
March 20.82 0.33
April 21.23 7.02
May 21.71 14.19
June 21.91 19.16
July 21.89 20.92
August 21.90 20.05
September 21.61 15.39
October 21.06 7.43
November 20.52 -0.0
December 19.92 -7.6
     
Annual Sum or Average 21.04 6.46
Minimum of Months 19.72 -12.6
Maximum of Months 21.91 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 OFFICE HALL

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.81 -12.6
February 20.16 -7.7
March 20.82 0.33
April 21.26 7.02
May 21.70 14.19
June 21.89 19.16
July 21.88 20.92
August 21.90 20.05
September 21.64 15.39
October 21.10 7.43
November 20.51 -0.0
December 19.98 -7.6
     
Annual Sum or Average 21.06 6.46
Minimum of Months 19.81 -12.6
Maximum of Months 21.90 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 OFFICE TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.39 -12.6
February 19.41 -7.7
March 19.49 0.33
April 19.44 7.02
May 19.47 14.19
June 19.51 19.16
July 19.41 20.92
August 19.51 20.05
September 19.44 15.39
October 19.41 7.43
November 19.39 -0.0
December 19.38 -7.6
     
Annual Sum or Average 19.44 6.46
Minimum of Months 19.38 -12.6
Maximum of Months 19.51 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 PHYSICAL THERAPY 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.48 -12.6
February 19.57 -7.7
March 19.78 0.33
April 19.85 7.02
May 19.88 14.19
June 19.96 19.16
July 19.85 20.92
August 19.98 20.05
September 19.92 15.39
October 19.83 7.43
November 19.59 -0.0
December 19.50 -7.6
     
Annual Sum or Average 19.77 6.46
Minimum of Months 19.48 -12.6
Maximum of Months 19.98 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 PHYSICAL THERAPY 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.51 -12.6
February 19.60 -7.7
March 19.82 0.33
April 19.87 7.02
May 19.89 14.19
June 19.88 19.16
July 19.68 20.92
August 19.83 20.05
September 19.82 15.39
October 19.83 7.43
November 19.65 -0.0
December 19.53 -7.6
     
Annual Sum or Average 19.74 6.46
Minimum of Months 19.51 -12.6
Maximum of Months 19.89 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 PHYSICAL THERAPY TOILET

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.41 -12.6
February 19.45 -7.7
March 19.56 0.33
April 19.51 7.02
May 19.51 14.19
June 19.51 19.16
July 19.39 20.92
August 19.49 20.05
September 19.48 15.39
October 19.49 7.43
November 19.45 -0.0
December 19.41 -7.6
     
Annual Sum or Average 19.47 6.46
Minimum of Months 19.39 -12.6
Maximum of Months 19.56 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 STORAGE 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.51 -12.6
February 19.61 -7.7
March 19.86 0.33
April 19.96 7.02
May 20.07 14.19
June 20.12 19.16
July 19.99 20.92
August 20.09 20.05
September 20.00 15.39
October 19.88 7.43
November 19.70 -0.0
December 19.54 -7.6
     
Annual Sum or Average 19.86 6.46
Minimum of Months 19.51 -12.6
Maximum of Months 20.12 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 STORAGE 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.69 -12.6
February 19.90 -7.7
March 20.42 0.33
April 20.81 7.02
May 21.27 14.19
June 21.50 19.16
July 21.43 20.92
August 21.46 20.05
September 21.16 15.39
October 20.64 7.43
November 20.18 -0.0
December 19.79 -7.6
     
Annual Sum or Average 20.69 6.46
Minimum of Months 19.69 -12.6
Maximum of Months 21.50 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 TREATMENT

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.60 -12.6
February 19.73 -7.7
March 20.01 0.33
April 20.08 7.02
May 20.12 14.19
June 20.11 19.16
July 19.88 20.92
August 20.05 20.05
September 20.03 15.39
October 20.04 7.43
November 19.81 -0.0
December 19.63 -7.6
     
Annual Sum or Average 19.92 6.46
Minimum of Months 19.60 -12.6
Maximum of Months 20.12 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 UNDEVELOPED 1

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.59 -12.6
February 19.85 -7.7
March 20.39 0.33
April 20.85 7.02
May 21.32 14.19
June 21.54 19.16
July 21.54 20.92
August 21.58 20.05
September 21.29 15.39
October 20.73 7.43
November 20.10 -0.0
December 19.67 -7.6
     
Annual Sum or Average 20.71 6.46
Minimum of Months 19.59 -12.6
Maximum of Months 21.58 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 UNDEVELOPED 2

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.52 -12.6
February 19.75 -7.7
March 20.27 0.33
April 20.78 7.02
May 21.35 14.19
June 21.61 19.16
July 21.66 20.92
August 21.66 20.05
September 21.32 15.39
October 20.63 7.43
November 19.99 -0.0
December 19.59 -7.6
     
Annual Sum or Average 20.68 6.46
Minimum of Months 19.52 -12.6
Maximum of Months 21.66 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 UTILITY

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.57 -12.6
February 19.72 -7.7
March 20.10 0.33
April 20.35 7.02
May 20.62 14.19
June 20.82 19.16
July 20.75 20.92
August 20.77 20.05
September 20.55 15.39
October 20.21 7.43
November 19.90 -0.0
December 19.64 -7.6
     
Annual Sum or Average 20.25 6.46
Minimum of Months 19.57 -12.6
Maximum of Months 20.82 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: FLOOR 3 WORK

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.48 -12.6
February 19.69 -7.7
March 20.32 0.33
April 20.88 7.02
May 21.51 14.19
June 21.70 19.16
July 21.71 20.92
August 21.67 20.05
September 21.38 15.39
October 20.68 7.43
November 19.99 -0.0
December 19.50 -7.6
     
Annual Sum or Average 20.71 6.46
Minimum of Months 19.48 -12.6
Maximum of Months 21.71 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: NE STAIR

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.31 -12.6
February 19.33 -7.7
March 19.61 0.33
April 19.97 7.02
May 20.66 14.19
June 21.22 19.16
July 21.36 20.92
August 21.21 20.05
September 20.61 15.39
October 19.66 7.43
November 19.46 -0.0
December 19.35 -7.6
     
Annual Sum or Average 20.15 6.46
Minimum of Months 19.31 -12.6
Maximum of Months 21.36 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: NW ELEVATOR

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.37 -12.6
February 19.46 -7.7
March 19.81 0.33
April 20.27 7.02
May 20.78 14.19
June 21.26 19.16
July 21.39 20.92
August 21.34 20.05
September 20.85 15.39
October 20.03 7.43
November 19.64 -0.0
December 19.41 -7.6
     
Annual Sum or Average 20.31 6.46
Minimum of Months 19.37 -12.6
Maximum of Months 21.39 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: NW STAIR

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.28 -12.6
February 19.30 -7.7
March 19.61 0.33
April 19.97 7.02
May 20.69 14.19
June 21.27 19.16
July 21.42 20.92
August 21.28 20.05
September 20.62 15.39
October 19.65 7.43
November 19.47 -0.0
December 19.34 -7.6
     
Annual Sum or Average 20.16 6.46
Minimum of Months 19.28 -12.6
Maximum of Months 21.42 20.92



Table of Contents

Report: MONTHLY INDOOR TEMP

For: SW STAIR

Timestamp: 2018-10-19 19:11:00

ZONE MEAN AIR TEMPERATURE [C] SITE OUTDOOR AIR DRYBULB TEMPERATURE [C]
January 19.41 -12.6
February 19.56 -7.7
March 19.95 0.33
April 20.43 7.02
May 20.94 14.19
June 21.36 19.16
July 21.50 20.92
August 21.47 20.05
September 21.04 15.39
October 20.26 7.43
November 19.73 -0.0
December 19.47 -7.6
     
Annual Sum or Average 20.43 6.46
Minimum of Months 19.41 -12.6
Maximum of Months 21.50 20.92



Table of Contents

Report: OVERALL HVAC AIR SYSTEM LOADS

For: AHU-1

Timestamp: 2018-10-19 19:11:00

AIR SYSTEM TOTAL HEATING ENERGY [J] AIR SYSTEM TOTAL COOLING ENERGY [J]
January 0.218409E+12 0.646096E+10
February 0.166528E+12 0.169373E+11
March 0.132238E+12 0.427096E+11
April 0.924075E+11 0.766330E+11
May 0.555865E+11 0.135680E+12
June 0.451366E+11 0.199459E+12
July 0.441641E+11 0.237720E+12
August 0.444841E+11 0.227889E+12
September 0.543400E+11 0.138215E+12
October 0.876890E+11 0.725684E+11
November 0.128840E+12 0.433698E+11
December 0.183689E+12 0.130587E+11
     
Annual Sum or Average 0.125351E+13 0.121070E+13
Minimum of Months 0.441641E+11 0.646096E+10
Maximum of Months 0.218409E+12 0.237720E+12



Table of Contents

Report: OVERALL HVAC AIR SYSTEM LOADS

For: AHU-2

Timestamp: 2018-10-19 19:11:00

AIR SYSTEM TOTAL HEATING ENERGY [J] AIR SYSTEM TOTAL COOLING ENERGY [J]
January 0.132056E+12 0.000
February 0.900490E+11 0.000
March 0.579383E+11 0.284262E+10
April 0.391154E+11 0.280383E+11
May 0.300798E+11 0.804963E+11
June 0.311633E+11 0.172297E+12
July 0.332564E+11 0.225384E+12
August 0.330800E+11 0.218964E+12
September 0.305225E+11 0.995116E+11
October 0.335482E+11 0.104383E+11
November 0.614505E+11 0.122484E+10
December 0.102707E+12 0.000
     
Annual Sum or Average 0.674967E+12 0.839198E+12
Minimum of Months 0.300798E+11 0.000
Maximum of Months 0.132056E+12 0.225384E+12



Table of Contents

Report: OVERALL HVAC SYSTEM ENERGY

For: Meter

Timestamp: 2018-10-19 19:11:00

ELECTRICITY:HVAC [J] HEATING:GAS [J]
January 0.179732E+12 0.230433E+12
February 0.146683E+12 0.156847E+12
March 0.128600E+12 0.111092E+12
April 0.112611E+12 0.731169E+11
May 0.108062E+12 0.551832E+11
June 0.145297E+12 0.467184E+11
July 0.169755E+12 0.453854E+11
August 0.166493E+12 0.446751E+11
September 0.117193E+12 0.507846E+11
October 0.102991E+12 0.647213E+11
November 0.124270E+12 0.113448E+12
December 0.161925E+12 0.179689E+12
     
Annual Sum or Average 0.166361E+13 0.117209E+13
Minimum of Months 0.102991E+12 0.446751E+11
Maximum of Months 0.179732E+12 0.230433E+12



Table of Contents

Report: COMPONENTS OF PEAK ELECTRICAL DEMAND

For: Meter

Timestamp: 2018-10-19 19:11:00

ELECTRICITY:FACILITY [J] ELECTRICITY:FACILITY {Maximum}[W] ELECTRICITY:FACILITY {TIMESTAMP} INTERIORLIGHTS:ELECTRICITY {AT MAX/MIN} [W] INTERIOREQUIPMENT:ELECTRICITY {AT MAX/MIN} [W] FANS:ELECTRICITY {AT MAX/MIN} [W] HEATING:ELECTRICITY {AT MAX/MIN} [W] COOLING:ELECTRICITY {AT MAX/MIN} [W] EXTERIORLIGHTS:ELECTRICITY {AT MAX/MIN} [W] PUMPS:ELECTRICITY {AT MAX/MIN} [W] HEATREJECTION:ELECTRICITY [Invalid/Undefined] EXTERIOREQUIPMENT:ELECTRICITY [Invalid/Undefined] HUMIDIFICATION:ELECTRICITY [Invalid/Undefined] HEATRECOVERY:ELECTRICITY [Invalid/Undefined] WATERSYSTEMS:ELECTRICITY [Invalid/Undefined] REFRIGERATION:ELECTRICITY [Invalid/Undefined] GENERATORS:ELECTRICITY [Invalid/Undefined] ELECTRICITYPRODUCED:FACILITY [Invalid/Undefined]
January 0.392398E+12 303696.954 30-JAN-07:10 35880.590 86960.562 17097.246 126094.094 0.000 8471.500 719.458 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
February 0.338251E+12 318892.569 02-FEB-07:10 35880.590 86960.562 16820.607 143546.862 0.000 8471.500 719.458 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
March 0.347751E+12 246977.783 06-MAR-07:10 35880.590 86960.562 16714.030 84326.642 0.000 0.000 487.854 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
April 0.314039E+12 266477.170 18-APR-14:00 35585.685 111201.830 27546.144 4511.563 87581.017 0.000 50.931 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
May 0.319521E+12 266809.621 31-MAY-14:00 35585.685 111201.830 28808.231 4624.057 86539.094 0.000 50.724 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
June 0.352966E+12 285054.922 27-JUN-14:30 35585.685 111201.830 31257.548 4301.176 102661.782 0.000 46.901 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
July 0.372760E+12 301965.671 26-JUL-15:20 35585.685 111201.830 32447.373 4377.371 118327.010 0.000 26.402 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
August 0.383323E+12 318576.015 04-AUG-15:00 35585.685 111201.830 41714.431 1332.982 128727.081 0.000 14.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
September 0.319303E+12 286471.328 06-SEP-14:30 35585.685 111201.830 32567.506 4054.587 103016.367 0.000 45.353 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
October 0.313133E+12 229090.763 23-OCT-06:10 35880.590 86960.562 16843.169 63045.116 3463.986 8471.500 297.998 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
November 0.331052E+12 253330.287 27-NOV-07:10 35880.590 86960.562 16845.515 85733.702 0.000 8471.500 423.574 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
December 0.371437E+12 273676.858 11-DEC-07:10 35880.590 86960.562 17114.689 97207.114 0.000 8471.500 662.167 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
                                     
Annual Sum or Average 0.415594E+13                   0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Minimum of Months 0.313133E+12 229090.763   35585.685 86960.562 16714.030 1332.982 0.000 0.000 14.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Maximum of Months 0.392398E+12 318892.569   35880.590 111201.830 41714.431 143546.862 128727.081 8471.500 719.458 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000



Table of Contents

Report: ENERGY CONSUMPTION - ELECTRICITY & NATURAL GAS

For: Meter

Timestamp: 2018-10-19 19:11:00

ELECTRICITY:BUILDING [J] ELECTRICITY:BUILDING {Maximum}[W] ELECTRICITY:BUILDING {TIMESTAMP} GAS:BUILDING [J] GAS:BUILDING {Maximum}[W] GAS:BUILDING {TIMESTAMP}
January 0.199326E+12 147082.42 02-JAN-16:30 0.158619E+11 9905.77 02-JAN-06:10
February 0.180774E+12 147082.42 01-FEB-17:19 0.143713E+11 9905.77 01-FEB-06:10
March 0.208876E+12 147082.42 01-MAR-17:19 0.163897E+11 9905.77 01-MAR-06:10
April 0.193041E+12 147033.27 11-APR-16:49 0.153698E+11 9905.77 03-APR-05:10
May 0.204025E+12 146934.97 04-MAY-08:09 0.161258E+11 9905.77 01-MAY-05:10
June 0.201045E+12 146934.97 05-JUN-08:09 0.158049E+11 9905.77 01-JUN-05:10
July 0.195977E+12 146934.97 20-JUL-08:09 0.156907E+11 9905.77 03-JUL-05:10
August 0.208838E+12 146836.67 01-AUG-08:09 0.163897E+11 9905.77 01-AUG-05:10
September 0.193046E+12 147033.27 13-SEP-16:49 0.153698E+11 9905.77 01-SEP-05:10
October 0.199279E+12 147082.42 30-OCT-16:49 0.158619E+11 9905.77 02-OCT-05:10
November 0.194780E+12 147082.42 01-NOV-16:19 0.154482E+11 9905.77 01-NOV-05:10
December 0.196110E+12 147082.42 01-DEC-16:30 0.156907E+11 9905.77 01-DEC-06:10
             
Annual Sum or Average 0.237512E+13     0.188374E+12    
Minimum of Months 0.180774E+12 146836.67   0.143713E+11 9905.77  
Maximum of Months 0.208876E+12 147082.42   0.163897E+11 9905.77  



Table of Contents

Report: BUILDING ENERGY PERFORMANCE - ELECTRICITY

For: Meter

Timestamp: 2018-10-19 19:11:00

INTERIORLIGHTS:ELECTRICITY [J] TASKLIGHTS:INTERIORLIGHTS:ELECTRICITY [Invalid/Undefined] EXTERIORLIGHTS:ELECTRICITY [J] GENERAL:INTERIOREQUIPMENT:ELECTRICITY [J] EXTERIOREQUIPMENT:ELECTRICITY [Invalid/Undefined] FANS:ELECTRICITY [J] PUMPS:ELECTRICITY [J] HEATING:ELECTRICITY [J] COOLING:ELECTRICITY [J] HEATREJECTION:ELECTRICITY [Invalid/Undefined] HUMIDIFIER:ELECTRICITY [J] HEATRECOVERY:ELECTRICITY [Invalid/Undefined] WATERSYSTEMS:ELECTRICITY [Invalid/Undefined] COGENERATION:ELECTRICITY [Invalid/Undefined]
January 0.451727E+11 0.00 0.122659E+11 0.154153E+12 0.00 0.326689E+11 0.107300E+10 0.909519E+11 0.180339E+10 0.00 0.543082E+11 0.00 0.00 0.00
February 0.410482E+11 0.00 0.100953E+11 0.139726E+12 0.00 0.303215E+11 0.698716E+09 0.709761E+11 0.463623E+10 0.00 0.407491E+11 0.00 0.00 0.00
March 0.484860E+11 0.00 0.981596E+10 0.160390E+12 0.00 0.355349E+11 0.458941E+09 0.478217E+11 0.122621E+11 0.00 0.329810E+11 0.00 0.00 0.00
April 0.437286E+11 0.00 0.810463E+10 0.149313E+12 0.00 0.351075E+11 0.282457E+09 0.314498E+11 0.274998E+11 0.00 0.185539E+11 0.00 0.00 0.00
May 0.467531E+11 0.00 0.723110E+10 0.157272E+12 0.00 0.358293E+11 0.202869E+09 0.137489E+11 0.557334E+11 0.00 0.275075E+10 0.00 0.00 0.00
June 0.465040E+11 0.00 0.645926E+10 0.154542E+12 0.00 0.373601E+11 0.164222E+09 0.118194E+11 0.960854E+11 0.00 32567186.58 0.00 0.00 0.00
July 0.439343E+11 0.00 0.687443E+10 0.152043E+12 0.00 0.370164E+11 0.153402E+09 0.142426E+11 0.118496E+12 0.00 0.00 0.00 0.00 0.00
August 0.484482E+11 0.00 0.783871E+10 0.160390E+12 0.00 0.386912E+11 0.153229E+09 0.133185E+11 0.114483E+12 0.00 0.00 0.00 0.00 0.00
September 0.437329E+11 0.00 0.887723E+10 0.149313E+12 0.00 0.355028E+11 0.186426E+09 0.157726E+11 0.622058E+11 0.00 0.371226E+10 0.00 0.00 0.00
October 0.451251E+11 0.00 0.106140E+11 0.154153E+12 0.00 0.356405E+11 0.250146E+09 0.303422E+11 0.217373E+11 0.00 0.152707E+11 0.00 0.00 0.00
November 0.443642E+11 0.00 0.115153E+11 0.150416E+12 0.00 0.325498E+11 0.487890E+09 0.503165E+11 0.117365E+11 0.00 0.296667E+11 0.00 0.00 0.00
December 0.440674E+11 0.00 0.126065E+11 0.152043E+12 0.00 0.328025E+11 0.795235E+09 0.769023E+11 0.372677E+10 0.00 0.484935E+11 0.00 0.00 0.00
                             
Annual Sum or Average 0.541364E+12 0.00 0.112298E+12 0.183375E+13 0.00 0.419025E+12 0.490653E+10 0.467663E+12 0.530406E+12 0.00 0.246519E+12 0.00 0.00 0.00
Minimum of Months 0.410482E+11 0.00 0.645926E+10 0.139726E+12 0.00 0.303215E+11 0.153229E+09 0.118194E+11 0.180339E+10 0.00 0.00 0.00 0.00 0.00
Maximum of Months 0.484860E+11 0.00 0.126065E+11 0.160390E+12 0.00 0.386912E+11 0.107300E+10 0.909519E+11 0.118496E+12 0.00 0.543082E+11 0.00 0.00 0.00



Table of Contents

Report: BUILDING ENERGY PERFORMANCE - NATURAL GAS

For: Meter

Timestamp: 2018-10-19 19:11:00

INTERIOREQUIPMENT:GAS [J] EXTERIOREQUIPMENT:GAS [Invalid/Undefined] HEATING:GAS [J] COOLING:GAS [Invalid/Undefined] WATERSYSTEMS:GAS [J] COGENERATION:GAS [Invalid/Undefined]
January 0.158619E+11 0.00 0.230433E+12 0.00 0.226118E+11 0.00
February 0.143713E+11 0.00 0.156847E+12 0.00 0.205730E+11 0.00
March 0.163897E+11 0.00 0.111092E+12 0.00 0.229063E+11 0.00
April 0.153698E+11 0.00 0.731169E+11 0.00 0.215410E+11 0.00
May 0.161258E+11 0.00 0.551832E+11 0.00 0.218102E+11 0.00
June 0.158049E+11 0.00 0.467184E+11 0.00 0.205299E+11 0.00
July 0.156907E+11 0.00 0.453854E+11 0.00 0.206631E+11 0.00
August 0.163897E+11 0.00 0.446751E+11 0.00 0.205409E+11 0.00
September 0.153698E+11 0.00 0.507846E+11 0.00 0.199304E+11 0.00
October 0.158619E+11 0.00 0.647213E+11 0.00 0.209714E+11 0.00
November 0.154482E+11 0.00 0.113448E+12 0.00 0.208599E+11 0.00
December 0.156907E+11 0.00 0.179689E+12 0.00 0.220027E+11 0.00
             
Annual Sum or Average 0.188374E+12 0.00 0.117209E+13 0.00 0.254941E+12 0.00
Minimum of Months 0.143713E+11 0.00 0.446751E+11 0.00 0.199304E+11 0.00
Maximum of Months 0.163897E+11 0.00 0.230433E+12 0.00 0.229063E+11 0.00



Table of Contents

Report: PEAK ENERGY END-USE - ELECTRICITY

For: Meter

Timestamp: 2018-10-19 19:11:00

INTERIORLIGHTS:ELECTRICITY {Maximum}[W] INTERIORLIGHTS:ELECTRICITY {TIMESTAMP} TASKLIGHTS:INTERIORLIGHTS:ELECTRICITY [Invalid/Undefined] EXTERIORLIGHTS:ELECTRICITY {Maximum}[W] EXTERIORLIGHTS:ELECTRICITY {TIMESTAMP} GENERAL:INTERIOREQUIPMENT:ELECTRICITY {Maximum}[W] GENERAL:INTERIOREQUIPMENT:ELECTRICITY {TIMESTAMP} EXTERIOREQUIPMENT:ELECTRICITY [Invalid/Undefined] FANS:ELECTRICITY {Maximum}[W] FANS:ELECTRICITY {TIMESTAMP} PUMPS:ELECTRICITY {Maximum}[W] PUMPS:ELECTRICITY {TIMESTAMP} HEATING:ELECTRICITY {Maximum}[W] HEATING:ELECTRICITY {TIMESTAMP}
January 35880.59 02-JAN-07:10 0.00 8471.50 01-JAN-06:10 111201.83 02-JAN-09:09 0.00 24778.85 12-JAN-15:09 719.46 05-JAN-06:40 126760.65 07-JAN-07:10
February 35880.59 01-FEB-07:10 0.00 8471.50 01-FEB-06:10 111201.83 01-FEB-09:09 0.00 30194.83 24-FEB-15:39 719.46 01-FEB-06:10 147643.49 04-FEB-07:10
March 35880.59 01-MAR-07:10 0.00 8471.50 01-MAR-06:10 111201.83 01-MAR-09:09 0.00 28839.33 22-MAR-15:20 561.79 06-MAR-00:00 84326.64 06-MAR-07:10
April 35880.59 03-APR-06:10 0.00 8471.50 01-APR-05:10 111201.83 03-APR-08:09 0.00 36084.62 26-APR-14:50 395.88 01-APR-05:10 76341.72 03-APR-06:10
May 35831.44 01-MAY-06:10 0.00 8471.50 01-MAY-19:10 111201.83 01-MAY-08:09 0.00 28810.97 31-MAY-15:09 238.87 20-MAY-06:10 40687.10 01-MAY-06:10
June 35831.44 02-JUN-06:10 0.00 8471.50 01-JUN-19:40 111201.83 01-JUN-08:09 0.00 32671.70 30-JUN-14:00 223.64 03-JUN-06:10 35138.39 03-JUN-06:10
July 35831.44 06-JUL-06:10 0.00 8471.50 01-JUL-19:00 111201.83 03-JUL-08:09 0.00 32550.36 26-JUL-15:50 181.63 08-JUL-06:10 34326.40 08-JUL-06:10
August 35880.59 23-AUG-06:10 0.00 8471.50 01-AUG-19:40 111201.83 01-AUG-08:09 0.00 42247.24 04-AUG-16:40 208.08 07-AUG-06:10 35630.76 26-AUG-06:10
September 35880.59 12-SEP-06:10 0.00 8471.50 01-SEP-05:10 111201.83 01-SEP-08:09 0.00 35054.92 07-SEP-14:00 249.41 30-SEP-06:10 64221.06 30-SEP-06:10
October 35880.59 02-OCT-06:10 0.00 8471.50 01-OCT-05:10 111201.83 02-OCT-08:09 0.00 31173.27 31-OCT-15:20 298.00 23-OCT-06:10 65140.63 28-OCT-06:10
November 35880.59 01-NOV-06:10 0.00 8471.50 01-NOV-05:10 111201.83 01-NOV-08:09 0.00 26105.96 03-NOV-14:30 719.46 25-NOV-17:19 97988.78 25-NOV-07:10
December 35880.59 01-DEC-07:10 0.00 8471.50 01-DEC-06:10 111201.83 01-DEC-09:09 0.00 24984.61 01-DEC-14:39 719.46 09-DEC-06:10 113288.27 09-DEC-07:10
                             
Annual Sum or Average     0.00         0.00            
Minimum of Months 35831.44   0.00 8471.50   111201.83   0.00 24778.85   181.63   34326.40  
Maximum of Months 35880.59   0.00 8471.50   111201.83   0.00 42247.24   719.46   147643.49  



Table of Contents

Report: PEAK ELECTRICAL DEMAND

For: Meter

Timestamp: 2018-10-19 19:11:00

ELECTRICITY:FACILITY [J] ELECTRICITY:FACILITY {Maximum}[W] ELECTRICITY:FACILITY {TIMESTAMP} INTERIORLIGHTS:ELECTRICITY {AT MAX/MIN} [W] INTERIOREQUIPMENT:ELECTRICITY {AT MAX/MIN} [W] FANS:ELECTRICITY {AT MAX/MIN} [W] HEATING:ELECTRICITY {AT MAX/MIN} [W] COOLING:ELECTRICITY {AT MAX/MIN} [W] EXTERIORLIGHTS:ELECTRICITY {AT MAX/MIN} [W] PUMPS:ELECTRICITY {AT MAX/MIN} [W] HEATREJECTION:ELECTRICITY [Invalid/Undefined] EXTERIOREQUIPMENT:ELECTRICITY [Invalid/Undefined] HUMIDIFICATION:ELECTRICITY [Invalid/Undefined] HEATRECOVERY:ELECTRICITY [Invalid/Undefined] WATERSYSTEMS:ELECTRICITY [Invalid/Undefined] REFRIGERATION:ELECTRICITY [Invalid/Undefined] GENERATORS:ELECTRICITY [Invalid/Undefined] ELECTRICITYPRODUCED:FACILITY [Invalid/Undefined]
January 0.392398E+12 303696.954 30-JAN-07:10 35880.590 86960.562 17097.246 126094.094 0.000 8471.500 719.458 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
February 0.338251E+12 318892.569 02-FEB-07:10 35880.590 86960.562 16820.607 143546.862 0.000 8471.500 719.458 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
March 0.347751E+12 246977.783 06-MAR-07:10 35880.590 86960.562 16714.030 84326.642 0.000 0.000 487.854 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
April 0.314039E+12 266477.170 18-APR-14:00 35585.685 111201.830 27546.144 4511.563 87581.017 0.000 50.931 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
May 0.319521E+12 266809.621 31-MAY-14:00 35585.685 111201.830 28808.231 4624.057 86539.094 0.000 50.724 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
June 0.352966E+12 285054.922 27-JUN-14:30 35585.685 111201.830 31257.548 4301.176 102661.782 0.000 46.901 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
July 0.372760E+12 301965.671 26-JUL-15:20 35585.685 111201.830 32447.373 4377.371 118327.010 0.000 26.402 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
August 0.383323E+12 318576.015 04-AUG-15:00 35585.685 111201.830 41714.431 1332.982 128727.081 0.000 14.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
September 0.319303E+12 286471.328 06-SEP-14:30 35585.685 111201.830 32567.506 4054.587 103016.367 0.000 45.353 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
October 0.313133E+12 229090.763 23-OCT-06:10 35880.590 86960.562 16843.169 63045.116 3463.986 8471.500 297.998 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
November 0.331052E+12 253330.287 27-NOV-07:10 35880.590 86960.562 16845.515 85733.702 0.000 8471.500 423.574 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
December 0.371437E+12 273676.858 11-DEC-07:10 35880.590 86960.562 17114.689 97207.114 0.000 8471.500 662.167 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
                                     
Annual Sum or Average 0.415594E+13                   0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Minimum of Months 0.313133E+12 229090.763   35585.685 86960.562 16714.030 1332.982 0.000 0.000 14.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Maximum of Months 0.392398E+12 318892.569   35880.590 111201.830 41714.431 143546.862 128727.081 8471.500 719.458 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000



Table of Contents

Report: PEAK GAS DEMAND

For: Meter

Timestamp: 2018-10-19 19:11:00

GAS:FACILITY [J] GAS:FACILITY {Maximum}[W] GAS:FACILITY {TIMESTAMP} GAS:HVAC [Invalid/Undefined] INTERIOREQUIPMENT:GAS {AT MAX/MIN} [W] MISCPLUGGAS:INTERIOREQUIPMENT:GAS [Invalid/Undefined] GAS:PLANT {AT MAX/MIN} [W] WATERSYSTEMS:GAS {AT MAX/MIN} [W] WATER HEATER:WATERSYSTEMS:GAS {AT MAX/MIN} [W] HEATING:GAS {AT MAX/MIN} [W]
January 0.268907E+12 217606.251 30-JAN-12:20 0.000 9905.768 0.000 207700.483 24001.342 24001.342 183699.142
February 0.191791E+12 219954.203 02-FEB-15:00 0.000 9905.768 0.000 210048.434 24145.095 24145.095 185903.339
March 0.150388E+12 146734.177 06-MAR-06:40 0.000 9905.768 0.000 136828.409 7514.610 7514.610 129313.799
April 0.110028E+12 112227.006 03-APR-05:10 0.000 9905.768 0.000 102321.238 7514.610 7514.610 94806.628
May 0.931192E+11 75942.112 09-MAY-06:10 0.000 9905.768 0.000 66036.343 7514.610 7514.610 58521.733
June 0.830531E+11 68945.407 05-JUN-06:10 0.000 9905.768 0.000 59039.639 7514.610 7514.610 51525.029
July 0.817393E+11 64375.111 08-JUL-06:10 0.000 4952.884 0.000 59422.226 7514.610 7514.610 51907.616
August 0.816057E+11 73851.492 16-AUG-06:10 0.000 9905.768 0.000 63945.724 7514.610 7514.610 56431.114
September 0.860848E+11 77471.137 30-SEP-06:10 0.000 4952.884 0.000 72518.253 7514.610 7514.610 65003.643
October 0.101555E+12 92075.261 23-OCT-05:10 0.000 9905.768 0.000 82169.493 7514.610 7514.610 74654.883
November 0.149756E+12 196910.096 25-NOV-17:00 0.000 4952.884 0.000 191957.212 7514.610 7514.610 184442.602
December 0.217382E+12 207567.508 11-DEC-08:20 0.000 9905.768 0.000 197661.740 7514.610 7514.610 190147.130
                     
Annual Sum or Average 0.161541E+13     0.000   0.000        
Minimum of Months 0.816057E+11 64375.111   0.000 4952.884 0.000 59039.639 7514.610 7514.610 51525.029
Maximum of Months 0.268907E+12 219954.203   0.000 9905.768 0.000 210048.434 24145.095 24145.095 190147.130